Invasive Plant Control Services State and local opportunity open County of Orange RFP-012-3090502-ST Posted: 2026-11-10T21:52:59.826Z Response deadline: 2026-12-08T22:00:00.000Z The County of Orange, OC Community Resources (hereinafter referred to as “County”), is soliciting proposals from qualified firms (hereinafter referred to as “Respondents”) for Invasive Plant Control Services . Respondents must meet the minimum qualifications and requirements as set forth within the RFP and be capable of providing services identified in the Scope of Work herein. The proposed schedule below is subject to change. Any changes to the schedule for the RFP process will be issued to all Respondents via addenda on the County's eProcurement Portal. This is a fully electronic Request for Proposals (RFP). Respondents must submit their proposals online via the County’s online bidding system. Only electronic proposals will be accepted. Facsimile and e-mail proposals will NOT be allowed. For assistance on uploading proposals via County’s eProcurement Portal, please contact procurement-support@opengov.com or https://help.procurement.opengov.com/en/ . All questions or requests for interpretations must be received within this solicitation by Tuesday, November 24, 2026 , before 2:00 pm as specified in the solicitation. Respondents are not to contact other County personnel with any questions or clarifications concerning this solicitation. Verbal clarifications or responses will not be considered binding. Table 1: Labor Rates Project Manager Landscape Supervisor Landscape Assistant Supervisor Botanist Wildlife Biologist Foreman (Superintendent) Assistant Foreman (Crew lead) Landscape Maintenance Laborer II Landscape Maintenance Laborer I Equipment Operator Project Safety Specialist Project Assistant/Technical Editor GIS Technician Table 2: Equipment Daily Usage Rates (including fuel and mobilization/demobilization) GPS Unit (sub meter) Truck/Chipper (combination) Kubota RTV 900 or similar UTV Spraying devices - Tank sprayer (60 gallon) per unit Spraying devices - Backpack (4 gallon) per unit Dingo w/ attachment (e.g., mower, trencher) Pick-up Truck (light-duty, 4wd, 1/4 ton) Pick-up Truck (mid-duty, 4wd, 1/2 ton) Mini-track loader w/ attachment (e.g., mower, trencher) Dump Truck Skid-Steer w/ attachment (e.g., mower, trencher) Mini-Excavator Roll-off Truck (40 yard, including disposal) Stake-bed Truck (22 foot) Dump Trailer (4 yard) 500-gallon Water Trailer Kubota Zero Turn Mower SCOPE OF WORK Definitions “County”: means the County of Orange. “Project Manager” (PM): means the County representative, or designee, that is assigned to administer this contract. “Contractor”: means the individual, partnership, corporation, joint venture, or other legal entity entering into a contract with County to perform work. “Contractor Project Manager” (CPM): means the Contractor’s assigned representative to oversee Contractor’s employees in the performance of the work under this contract, and the primary point of contact to communicate with County’s representative and coordinate work. “OC Parks” or “Orange County Parks”: means the department within OC Community Resources responsible for management and operation of County regional parks, recreational areas, and nature areas. “Park” or “Park Facilities”: means all developed and undeveloped areas of the listed County regional park. Introduction Orange County Parks (OC Parks) facilities provide vital habitat to wildlife as well as recreational benefits to the public. Non-native, invasive plant species are widely cited as a leading threat to native habitat, biodiversity and ecological function. To protect and enhance habitat for wildlife, an invasive plant control program has been established that requires Contractor support to implement. The plant control program consists of treating non-native species, primarily in wildland settings, across up to 20 facilities annually. The following list of exhibits supplement the scope of work: Exhibit 1 – Project Maps 1.1. Portfolio Map 1.2. Park Facility Maps 1.3. Emergency Access Maps Exhibit 2 – Estimate of Annual Work Schedule Exhibit 3 – OC Parks Integrated Pest Management (IPM) Plan Exhibit 4 – 2023-27 Weed Priority List Exhibit 5 – County Best Management Practices (BMPs) Exhibit 6 – OC Parks Herbicide Application Request Form (HARF) Scope of Services For purposes of this contract, all OC Parks facilities have been divided into two separate regions, each of which corresponds to an OC Parks Project Manager (PM) area of responsibility (see Section 12: List of All OC Parks Facilities by Contract Area and Exhibit 1 – Project Maps). As part of the Invasive Plant Control Program for OC Parks, Contractor shall perform targeted invasive weed control as directed by PM. Work shall occur year-round, with a majority of work performed from January 1 to June 30 of each year (see Exhibit 2 – Estimate of Annual Work Schedule). Contractor shall coordinate with PM on the method and timing of weed control, and type and rate of products or chemicals recommended for treating weeds. OC Parks prioritizes weed control using the Weed Priority List, subregional Invasive Plant Management Plans (IPMPs), and the OC Parks Invasive Plant Control Guidelines (Control Guidelines); and uses the Orange County Coordinating Group’s Calflora User Guide (Calflora User Guide) for mapping. Subregional IPMPs, the Control Guidelines, and the Calflora User Guide will all be provided to the awardees at the kickoff meeting. Upon approval by PM, Contractor shall treat targeted weed species and if applicable, apply chemicals at rates in accordance with related product labels and regulations using the lowest effective label rate. All weed control activities shall comply with the OC Parks Integrated Pest Management (IPM) Plan ( Exhibit 3 ) and current OC Parks policy and practices. The OC Parks IPM plan may be updated, and Contractor shall be provided with the most current version. All proposed chemical treatment (herbicide application) will require review (via submission of a HARF) and approval by OC Parks prior to application. Please note, submittal of an herbicide request does not guarantee approval of the proposed application. Requests shall be submitted at least 10 business days in advance of the requested herbicide application date. Control efforts shall involve manual, mechanical, and chemical treatment of targeted non-native weed species within all management units of OC Parks. The primary targets for invasive control shall be Natural Communities Coalition Category 1 and Category 2 priority weeds, as listed in Exhibit 4 – 2023-27 Weed Priority List . Additional non-native species or sites may be added depending on detection, prioritization and scheduling. Under this Contract, Contractor shall be responsible for searching and treating up to 20,000 acres for the above invasive weed species using the most effective method based on species, timing, and site conditions. Work shall be charged on a time and materials basis not to exceed the total contract amount. Contractor shall be compensated for the actual number of hours worked in each Park surveying and treating weeds and for time spent learning and utilizing work reporting software, attending specified trainings and check-in meetings, preparing work estimates, preparing HARFs, preparing PCA recommendations if requested, and other coordination activities as directed by the County. Estimates are provided to assist Contractor in projecting typical work. Actual acres, hours, target weeds, cover, and specific locations may vary at time of treatment in response to actual field conditions and Contractor must be able to adjust as needed and in coordination with PM. Contractor shall monitor status of the remaining weed control contract budget at all times in order to plan and coordinate prioritization of treatment with PM. Contractor Requirements Qualifications : Contractor shall be able to provide personnel who have been fully trained in all aspects of weed identification and abatement for the duration of the contract. Contractor and field staff must hold applicable and current licenses to apply pesticides for weed control in the State of California. Contractor must have familiarity with all weed control methods including manual removal, mechanical weed removal, herbicide application, as well as related tools and equipment and chemical handling procedures. Contractor shall designate a Contractor PM (CPM) with experience in weed abatement supervision to oversee weed management activities under this contract. CPM must be able to receive and carry out verbal and/or written instructions in English provided by PM. CPM shall be the primary point of contact for PM for weed management requests. Contractor shall conduct annual herbicide application training for all field staff. Contractor shall provide crews of 3-6 people for invasive plant control. Contractor must be able to identify target weeds species in varying stages of growth. Contractor shall provide and utilize smartphone(s) or tablet(s) with Calflora Weed Manager software loaded at no extra charge. License Requirements: Contractor must hold a valid pest control business license for the duration of the contract. Contractor shall include at least two staff members holding current Qualified Applicators Licenses; it is beneficial if a Pest Control Advisor is on staff. All licenses must be current, issued by the State of California and be registered in Orange County. Contractor is responsible for retaining all appropriate government licenses required to complete the scope of work at no additional cost to the County. At all times during the term of the Contract, Contractor shall have in full force and effect all licenses required by law for the performance of the services described in this Contract. Copies of the licensing information shall be made available to the County upon request. Work Specifications Coordination: Contractor shall designate a CPM to oversee weed management activities under this contract. CPM shall be the primary point of contact for PM for weed management requests, and shall utilize the County’s Microsoft Teams platform and attend monthly coordination meetings, other meetings and trainings (e.g., Calflora training) as needed. Contractor shall maintain a telephonic communications system such that calls are answered within four business hours, five days a week, 8 a.m. through 4 p.m. CPM shall meet and coordinate with PM virtually and in-person throughout the weed season. Prior to start of the weed season (late summer or early fall), a pre-season meeting shall be held with CPM at OC Parks Headquarters or virtually to discuss the upcoming work plan. CPM shall also meet with PM and Operations Staff at each Park prior to initiation of field work. Refer to Exhibit 2 – Estimate of Annual Work Schedule for approximate pre-season meeting dates. CPM shall coordinate weed control, generate reports, and oversee invoicing under this Contract. Weed control coordination and reporting includes (1) Microsoft Teams Schedule Forecasting, (2) Herbicide Application Request Form submittals, (3) Email notifications to Supervising Rangers, (4) Calflora Weed Manager, and (5) OC Parks Herbicide Tracking Tool (Trax). These reports are described in more detail below in Coordination, Reporting, and Documentation. When CPM is unavailable, a backup contact shall be furnished to PM for submitting weed treatment reports. Target Species: Exhibit 4 – 2023-27 Weed Priority List is the list of target weed species vetted by OC Parks, California State Parks, The Nature Conservancy, Natural Communities Coalition, California Invasive Plant Council and other OC Parks partners. This list is reviewed and updated annually and shall be provided to Contractor upon each revision. Contractor staff shall notify PM when unfamiliar with a target emergent weed species and identification training shall be provided at no cost to Contractor. Coordination, Reporting, and Documentation: All control efforts shall be monitored and coordinated by PM and/or designee. Record-keeping is a critical aspect of invasive plant management. Contractor shall provide the following to PM: Projected Two-week Outlook Schedule Every week the CPM shall submit to PM via Microsoft Teams post a projected two-week work schedule that identifies target species and treatment areas. The following information shall be included in the two-week outlook: Date(s) of proposed work Park(s) and Park sub-unit(s) where work shall occur Anticipated crew size(s) Anticipated method(s) for removal, including herbicide chemicals if applicable Anticipated invasive species to be controlled Calflora Reporting Contractor is responsible for reporting work completed within a week of the treatment event via Calflora ( www.calflora.org ). Calflora experience is not necessary and training shall be provided to Contractor by PM at no cost to Contractor. Use of the Calflora app, Calflora Pro, requires an IOS or Android device; an external GPS receiver is required for sites under tree canopy. A login and password shall be provided to Contractor. The Contractor shall follow the reporting guidelines outlined in the Calflora User Guide. At minimum, the following data must be entered for each weed treatment completed: Treatment polygons Scientific name of target species Distribution Number of plants Percent cover of target species Treatment method Percent of area treated OC Parks Pesticide and Fertilizer Tracking Application OC Parks has a centralized system for tracking herbicide use. Contractor shall electronically submit a detailed record of all herbicides used for the past month at trax.ocparks.com by the 10 th of the following month. A login and password shall be provided to Contractor. Failure to complete the required reporting will cause delays in County’s acceptance of work and delay payment for services rendered. Treatment Utilizing Calflora Weed Manager, PM shall provide Contractor with digital maps of treatment areas in fall prior to the beginning of the weed season. Maps are for high-level guidance and general understanding of project needs, however specific targeted invasive plants populations to be controlled shall be dictated by conditions on the ground during the active growing season. Treatment approach shall be determined in coordination with and at direction of PM. Contractor shall specify treatment methods intended to be implemented in the two-week outlook schedule. Treatment methods shall comply with all specifications in Exhibit 3 – OC Parks IPM Plan and Exhibit 5 – County Best Management Practices (BMPs). Contractor shall furnish all hand tools, power equipment, fire extinguishers and safety equipment necessary to accomplish specified work. Contractor shall provide a schedule of fees inclusive of labor, equipment, transportation, dumping, and materials associated with each of the following: Manual Treatment Methods: Manual treatment includes physical removal of invasive plants and/or flower or seed heads using non-mechanical tools such as hands, shovels, picks, axes, hand-saws, loppers and machetes. Treatment includes removal and disposal of excess biomass and any fruiting bodies/seeds. Tarping and/or solarization may also be implemented to contain populations of high priority species. Other novel invasive plant control methods may be employed over the term of the contract. Mechanical Treatment Methods: Mechanical treatment includes physical removal of invasive plants using mechanized tools such as mowers, brush-cutters, line trimmers, and chainsaws. All internal combustion equipment must be equipped with an approved spark arrester and sufficient noise control devices when not equipped with turbo charger; included but not limited to tractors, weed eaters, chain saws. Skilled removal, followed by chipping and/or disposal of large trees ( e.g. , Eucalyptus) may be required. Treatment includes removal and disposal of excess biomass and any fruiting bodies/seeds. Other novel invasive plant control methods may be employed over the term of the contract. To assist with invasive species control, all hand tools, and power or driven equipment, including vehicles, shall be cleaned to remove vegetation before leaving a work area or entering a new work area. Herbicide Treatment Methods: OC Parks requires Contractor follow specifications outlined in Exhibit 3 – OC Parks IPM Plan and Exhibit 5 – County BMPs when selecting and applying appropriate chemicals for weed treatment, and that Contractor staff is qualified to conduct herbicide application work. All herbicide applications will require an approved HARF. All herbicide must be applied directly to individual targeted plants using the lowest effective label rates ( e.g ., spot-spray, cut-stump, basal bark spray, etc.). Contractor shall coordinate with PM on the type and amount of products or chemicals recommended for controlling vegetations. Upon approval by PM, Contractor shall apply herbicide products at rates within applicable product labeled rates and current California Department of Pesticide Regulation (CDPR) regulations. Contractor must be able to provide written wildland PCA recommendations to PM. Contractor is responsible for recording herbicide quantities applied onsite, as detailed in the Coordination, Reporting and Documentation section. Herbicide preparation shall only be allowed in approved staging areas identified by PM. All herbicide mixing shall be more than 100 feet from a stream course or body of water. Contractor shall comply with all herbicide application requirements as set forth by the CDPR, County of Orange Agricultural Commissioner, Federal Environmental Protection Agency, California State Water Resource’s Control Board, and all manufacturer instructions provided on product labels and Material Safety Data sheets. All equipment used for herbicide applications shall comply with all applicable State, Federal, and Cal OSHA Regulations. Contractor is responsible for all personal protective equipment (PPEs) and safety devices used by Contractor personnel engaged in the handling, formulation, transfer, application, and disposal of herbicide protects. Contractor must use all PPEs identified on the various product labels which may include but not be limited to face mask, respirator, goggles, caps or hats, protective clothing, gloves, etc. All clothing and protective gear used in the performance of herbicide applications shall be in conformance with all applicable legal and regulatory requirements. Work to be performed shall consist of furnishing all labor, equipment, and materials necessary to complete all spraying by means of backpack sprayer or spray rig truck. All applicators must have current, documented herbicide application training that is available for submittal to OC Parks. Expected Results: PM shall inspect sites where work has been performed following weed treatment. Ninety (90) percent of treated plant populations showing obvious signs of decline is acceptable within two weeks following original herbicide application. Any deficiencies or deviations from the expected results shall be the responsibility of the Contractor to cure unless Contractor can prove deficiencies and/or deviations were caused by County negligence or omission. Marking: A brightly colored, non-toxic dye shall be used during all herbicide applications to aid the applicator in achieving adequate coverage of the target species. The dye shall be a non-toxic material such as Blazon, Turfmark or an equivalent. Dye application rate to be determined in concurrence with PM. Weather Restrictions: Herbicide treatment shall only be conducted when weather conditions are conducive to effective uptake of herbicide by the target species ( e.g. , sunny and dry with ambient temperatures ≥65° Source: OpenGov https://procurement.opengov.com/portal/ocgov/projects/278046 Canonical URL: https://govcontractfinder.com/contracts/invasive-plant-control-services-opengov-108-project-278046