Jordan Fire House HVAC design and build upgrades State and local opportunity open Town of Waterford RFP# 26-016 Posted: 2026-11-03T05:00:00.924Z Response deadline: 2026-12-03T19:00:00.000Z The Town of Waterford is seeking a single design-build team to investigate, design, permit, furnish, install, test, and commission HVAC upgrades at 89 Rope Ferry Road. The design-builder is responsible for licensed professional design and complete construction under one contract, subject to Town approval of the design before installation. PRICE PROPOSAL AND COST BREAKDOWN Provide one firm lump-sum base price for the complete design and construction scope required by this RFP, supported by the cost breakdown below. The breakdown shall equal the total lump-sum base price, with each cost included only once. The price shall include all required labor, materials, equipment, professional services, permits, applicable prevailing wages and fringe benefits, required wage adjustments, and all other costs necessary to complete the work. No allowances are established by this RFP. Proposer-created allowances shall not replace firm pricing for required work. The breakdown is for evaluation and contract administration and does not create separate awards or limit the design-builder’s responsibility to complete the required scope. Site investigation, engineering, and design services Demolition, removal, and disposal HVAC equipment and mechanical installation Electrical work and controls integration Testing, balancing, commissioning, training, and closeout General project costs, including permits, bonds, insurance, supervision, temporary services, associated repairs, overhead, and profit SCOPE OF WORK Project Objective The Town of Waterford seeks a qualified design-builder to provide complete professional design and construction services for HVAC upgrades at the Jordan Village Fire Department, 89 Rope Ferry Road, Waterford, Connecticut. Provide complete heating, cooling, ventilation, zoning, and controls for the spaces identified below. Include field investigation, engineering, permitting, procurement, demolition, installation, associated electrical and building work, testing, commissioning, training, and closeout. Maintain firehouse operations and emergency response access throughout the work. Heating System Improvements Replace the existing boiler and associated components necessary to provide a complete operational heating system. Identify the proposed fuel source and system configuration in the base proposal. Provide independently controlled heating zones serving the basement, two garages, first-floor offices, second-floor bunks/offices, and open hall. Verify existing distribution and identify piping, pumps, valves, terminal equipment, and controls to be replaced or retained. Inspect equipment proposed for reuse and demonstrate its suitability for the new system. Include required repairs in the base price. Identify the proposed disposition of the existing oil tank, baseboard, garage heaters, and domestic hot-water equipment. Cooling and Ventilation Improvements Provide cooling for the second-floor hall. Replace the existing attic cooling equipment and associated ductwork and diffusers serving the affected spaces. Identify the rooms and areas served and show proposed equipment locations and distribution. Provide ventilation and exhaust necessary for the affected spaces and proposed system. Include condensate disposal, insulation, supports, service access, and weatherproofing required for a complete installation. Controls and Electrical Work Provide coordinated controls for all new equipment and required heating and cooling zones. Identify the proposed control platform, operating sequences, temperature controls, and interfaces with retained systems. Verify available electrical capacity and include required circuits, disconnects, wiring, connections, and electrical modifications. Identify any required utility service changes in the proposal. Associated Construction Remove and lawfully dispose of equipment and materials being replaced. Include required equipment supports, pads, penetrations, firestopping, access provisions, ceiling and wall repairs, and restoration of disturbed finishes. Identify equipment and systems to remain, protect them, and maintain their operation during construction. Identify potential hazardous materials requiring investigation; do not assume their absence. Submit unresolved conditions as written questions before the inquiry deadline. Design and Submittals No existing drawings or equipment records are available. Field-measure and document conditions necessary to develop and complete the design. Prepare heating and cooling load calculations, equipment selections, zoning plans, ventilation calculations, electrical requirements, and control sequences. Final construction documents shall be prepared and sealed by appropriately licensed Connecticut design professionals. Submit the basis of design and 60 percent, 90 percent, and final construction documents for Town review. Include equipment schedules, installation details, trade coordination, and permit documents. Obtain Town design acceptance before equipment procurement and installation. Town review does not relieve the design-builder of responsibility for design adequacy, coordination, code compliance, or complete performance. Construction Phasing and Firehouse Operations Provide a construction sequence identifying work areas, equipment lead times, shutdowns, temporary services, and occupant protection. Obtain Town approval before interrupting heating, cooling, electrical service, or other building systems. Provide temporary services where required to maintain operating conditions agreed with the Town. Maintain apparatus access, emergency egress, and access to occupied areas. Separate construction from occupied spaces and control dust, debris, and construction-related air contaminants. Coordinate all work affecting occupied spaces and existing services with Fire Department personnel. Testing and Completion Provide equipment startup, testing and balancing, controls and safety verification, and functional commissioning. Demonstrate correct equipment operation and response of each required zone to its controls. Provide owner training, record drawings, operation and maintenance manuals, equipment warranties, and a minimum one-year workmanship warranty beginning at Town acceptance. Correct deficiencies, complete required inspections, and submit closeout documents before requesting final acceptance. Assign all manufacturers' warranties to the Town. Mandatory Pre-Proposal Walkthrough Attendance at the mandatory pre-proposal walkthrough is required. Proposals from firms that do not attend and appear on the Town attendance record will not be considered. The proposing prime design-builder shall ensure its representative signs the attendance record. Walkthrough date: Thursday, November 12, 2026 . Time: 10:00 am . Location: Jordan Village Fire Department, 89 Rope Ferry Road, Waterford, Connecticut. Inspect accessible areas and verify observable conditions affecting the design, construction approach, and price. Identify inaccessible areas and unresolved conditions in written questions submitted through the procurement portal by the stated inquiry deadline. Walkthrough statements do not modify the RFP. Changes or clarifications affecting proposal requirements will be issued by written addendum through the procurement portal. Complete Base Proposal Provide one firm lump-sum base price for the complete required design-build scope. Include all professional services, labor, materials, equipment, permits, required bonds, insurance, applicable prevailing wages and fringe benefits, required wage adjustments, temporary services, associated repairs, overhead, and profit. No Town-specified allowances are established. Identify assumptions, exclusions, and exceptions expressly in the proposal. The preliminary design is for evaluation; the selected design-builder remains responsible for final design and complete construction. No work may begin before contract execution and written authorization to proceed. FORMAT OF PROPOSAL All responses to this RFP must conform to these instructions: Delivery of Responses Sealed proposals for Jordan Fire House HVAC design and build upgrades will be received through the Town's e-Procurement Portal located at https://procurement.opengov.com/portal/waterfordct/projects/317214 until 2:00 pm prevailing time on Thursday, December 3, 2026 , all bid openings will be held on Zoom, details can be found under Proposal Submission Deadline Location below: Release Project Date: November 3, 2026 Pre-Proposal Meeting (Mandatory): November 12, 2026, 10:00am 89 Rope Ferry Road, Waterford CT 06385 Request for Information Due: November 23, 2026, 4:00pm Question Response Deadline: November 26, 2026, 4:00pm Submission of Detailed Qualifications: December 3, 2026, 2:00pm Topic: Bid Opening RFP 26-016 Jordan Fire House HVAC Design and Build Upgrades Time: Dec 3, 2026 02:00 PM Eastern Time (US and Canada) Join Zoom Meeting https://us05web.zoom.us/j/88536956779?pwd=Kt8zaN4VfATMq5hqko0eU9ki3wbnqa.1 Join and take notes https://us05web.zoom.us/j/88536956779?pwd=Kt8zaN4VfATMq5hqko0eU9ki3wbnqa.1&mynotes=on Meeting ID: 885 3695 6779 Passcode: gqZ258 Join instructions Information to be Included Organize proposals in the order below and submit documents through the corresponding Vendor Questionnaire fields. Information shall be complete, concise, and specific to this HVAC design-build project. A. Firm Qualifications and Project Team Identify the legal contracting entity, primary contact, project manager, construction superintendent, Connecticut-licensed design professionals, and major subcontractors. Provide license numbers, resumes, responsibilities, availability, and current workload relevant to completing this project. B. Comparable Experience and References Provide three comparable HVAC projects, preferably involving occupied firehouses, public safety buildings, or municipal facilities. Include scope, contract value, completion date, services performed, and owner reference contact information. C. Preliminary Design and Technical Approach Provide a project-specific narrative and preliminary schematic showing equipment, heating and cooling coverage, zoning, ventilation, controls, and distribution routes. Identify equipment to be removed or retained, preliminary load and sizing assumptions, electrical requirements, energy efficiency, service access, and field investigations needed to validate the final design. Explain how the solution meets the required scope and identify deviations. D. Construction Plan and Schedule Provide milestones for investigation, design, Town review, permitting, equipment procurement, installation, commissioning, and completion. Describe phasing, shutdowns, temporary services, occupant protection, dust and air isolation, and measures to maintain firehouse operations and emergency response access. E. Price Proposal Complete all six categories in the portal pricing table. Their sum is the firm lump-sum base price. Include the complete scope and applicable prevailing wages, fringe benefits, and required wage adjustments. No separate pricing upload is required. F. Assumptions and Exceptions Provide one consolidated statement of assumptions, exclusions, deviations, and exceptions to the scope and contract requirements; if none, state None. Identify inaccessible conditions observed at the mandatory walkthrough and their effect on the proposal. Submit unresolved scope questions by the inquiry deadline. G. Warranty and Closeout Describe equipment and workmanship warranty coverage, including duration and commencement, testing and commissioning, training, record drawings, and operation and maintenance documents. H. Forms and Acknowledgments Complete required affidavits, statements, confirmations, and addenda acknowledgments. Confirm ability to meet insurance requirements and any bonding requirements expressly stated in this RFP. Preliminary designs are for evaluation; final sealed design, permitting, coordination, and complete construction remain the selected design-builder responsibility. Price Submission Enter pricing only in the portal pricing table described in Section 7. Do not include pricing in technical proposal uploads. Exemptions The Town of Waterford is exempt from paying excise, transportation and sales taxes imposed by the Federal Government and/or the State. Such taxes must not be included in prices. No exemption certificates are required and none will be issued. Bid Security If the total amount of the bid submitted exceeds $50,000, or if the bid contains any add alternates and the combination of the base bid plus all add alternates exceeds $50,000, then the bid must be accompanied by a CERTIFIED CHECK or a BID BOND, signed by a responsible Surety, in the amount of 10% of the total amount of the tendered bid and made payable to the order of the Town of Waterford. All bid checks or bonds, except those of the lower three (3) bidders, will be returned within ten (10) days of the opening of bids. Those of the lower three (3) bidders will be retained by the Town of Waterford until one of the lower three (3) bidders signs the contract or until all bids are rejected; however, in no case will the bid check or bond be retained for more than 90 days unless forfeited in accordance with the applicable bid security instrument. No bidder may withdraw its bid within 90 days after the actual date of the opening thereof. Should there be reasons why the CONTRACT cannot be awarded within the specified period, the time may be extended by mutual agreement between the OWNER and the BIDDER. If the total amount of the bid (or base bid plus all add alternates) submitted is $50,000 or less, then no bid security is required. The Bid Bond and Surety Letter of Intent must be provided by a Surety Company that meets all of thefollowing qualifications as of the date of bid: (1) Licensed to do business in the State of Connecticut; (2) Listed on the current U.S. Treasury T List; and (3) Rated A- or better by A.M. Best. Bonds - A. Performance Bond If the total bid price for the project exceeds $50,000, or if the bid contains any alternates and the combination of the base bid plus all Town-accepted alternates exceeds $50,000, then either of the following is required: 1. The Contractor shall furnish a bond covering faithful performance of the Contract. Surety shall be qualified to do business in the State of Connecticut, listed on the current U.S. Treasury T List, and rated A- or better by A.M. Best. The cost of the bond premium shall be included in the Contract Sum. The amount of the bond shall equal 100 percent of the Contract Sum. OR 2. In lieu of a Performance Bond, security in a form acceptable to the Town (for example, a letter of credit or an assigned passbook) in the amount of 100 percent of the Contract may be substituted. The Contractor shall deliver the required security to the Owner on the date the agreement is entered into. The Contractor shall require the attorney-in-fact who executes the required bond on behalf of the surety to affix a certified and current copy of the power of attorney. Where acceptance of any add alternates would cause the Contract Sum to exceed the $50,000 threshold, the price of the alternate shall include the cost of the required bond or security. Bonds - B. Payment Bond If the total bid price for the project exceeds $100,000, or if the bid contains any alternates and the combination of the base bid plus all Town-accepted alternates exceeds $100,000, then either of the following is required: 1. The Contractor shall furnish a bond covering payment of obligations arising under the terms of the Contract. Surety shall be qualified to do business in the State of Connecticut, listed on the current U.S. Treasury T List, and rated A- or better by A.M. Best. The cost of the bond premium shall be included in the Contract Sum. The amount of the bond shall equal 100 percent of the Contract Sum. OR 2. In lieu of a Payment Bond, security in a form acceptable to the Town (for example, a letter of credit or an assigned passbook) in the amount of 100 percent of the Contract may be substituted, to the extent permitted by applicable law. The Contractor shall deliver the required security to the Owner on the date the Agreement is entered into. The Contractor shall require the attorney-in-fact who executes the required bond on behalf of the surety to affix a certified copy of the power of attorney. Where acceptance of any add alternates would cause the Contract Sum to exceed the $100,000 threshold, the price of the alternate shall include the cost of the required bond or security. If the total bid, or base bid plus Town-accepted alternates, is $100,000 or less, then in lieu of providing security listed in Section 2.6.B, the Contractor may elect to provide certified lien waivers from each supplier and subcontractor affirming that they have been paid for work and materials for which previous payment applications were issued by the Owner and payments received by the Contractor. See the Attachments section of the solicitation for sample Performance and Payment Bonds. Applicable statutory payment bond requirements control over any inconsistent alternative security provision. Prevailing Wage - Special Notice and Annual Adjustments This contract requires payment of applicable Connecticut prevailing wages and fringe benefits for covered construction work in accordance with Connecticut General Statutes Section 31-53. The Town shall obtain and include the project-specific initial Department of Labor wage determination in the solicitation. The wage schedule and applicable annual adjustments form part of the Contract. Professional design services shall be separately identified in the price breakdown. Pursuant to Connecticut General Statutes Section 31-55a, each contractor shall contact the Labor Commissioner on or before July 1 of each year for the duration of the Contract to ascertain the applicable hourly prevailing wages and benefit payments or contributions, and make necessary adjustments effective each July 1. Contractors and subcontractors are responsible for obtaining and paying the applicable annual adjusted rates. Include required wage and benefit adjustments for the proposed construction schedule in the Contract Sum. Obtain current wage information from the Connecticut Department of Labor, Wage and Workplace Standards Division, at https://portal.ct.gov/dol . The Department issues the initial project wage schedule to the contracting agency; contractors shall obtain subsequent annual adjustments directly from the Department. Submit required certified payroll records and comply with applicable wage postings and recordkeeping requirements Construction Safety and Health Training - Section 31-53b Each contractor shall furnish proof with the weekly certified payroll form for the first week each employee begins work that each covered mechanic, laborer, or worker has completed at least ten hours of construction safety and health training approved by OSHA, an approved new miner training program under 30 CFR 46, or, for telecommunications employees, at least ten hours of training under 29 CFR 1910.268, as applicable. For plumbers and electricians subject to Section 20-334d who completed OSHA construction safety training five or more years before beginning work on the project, provide proof of the supplemental refresher training of at least four hours taught by an OSHA-authorized trainer required by Section 31-53b. Provide course completion cards or other proof accepted by the Labor Commissioner. Comply with applicable training-document recency requirements and exceptions under current law. A covered person who has not completed required training is subject to removal from the worksite if acceptable documentation is not provided by the fifteenth day after being found noncompliant. The Labor Commissioner or designee enforces these requirements. Applicable statutory exceptions include publ Source: OpenGov https://procurement.opengov.com/portal/waterfordct/projects/317214 Canonical URL: https://govcontractfinder.com/contracts/jordan-fire-house-hvac-design-and-build-upgrades-opengov-5535-project-317214