Kemah Focused Livable Centers Study State and local opportunity open Houston-Galveston Area Council RFP-TRN26-10 Posted: 2026-10-28T10:00:00.962Z Response deadline: 2026-12-17T18:00:00.000Z H-GAC is seeking qualified contractor services to conduct a study and develop a plan to further the goals of the Livable Centers program in Kemah (referred to as “sponsor” or “local sponsor” in this document). The Contractor will develop a plan that addresses the application of the Livable Centers program goals in the specified study area. Since this project requires a range of research, public engagement, transportation, and planning expertise, a team of specialized firms is permitted. Scope of Work Scope of work The study recommendations will act as a catalyst to transform Kemah’s Downtown area into a vibrant, accessible, and sustainable destination. The study will enhance transportation and walkability and promote mixed-use developments in this area. While the Downtown area is the primary focus, the State Highway 146 (SH146) entry area is also crucial. Enhancing this gateway will guide traffic to the Downtown core, encouraging visitors to explore and engage with the city. Coordinated development efforts will ensure a unified aesthetic and functional experience, making the city more connected and cohesive. Additionally, developing pedestrian and other transportation links between the SH146 entry and the Downtown focused area will improve connectivity, encouraging exploration and economic synergy throughout Kemah. This study will build on past investments, address current challenges, and align with local and regional strategic plans. The City has successfully initiated and executed actions from past plans, including the 2012 Transportation Plan, the 2016 Branding and Identity Plan, the 2021-2026 Strategic Plan, the 2023 5-Year Plan for Projects Direction, Strategy and Implementation, and the 2024 Parks Master Plan. Examining the current state of Kemah, particularly in the focused area, will reveal gaps in the urban environment that demand attention. Pedestrian networks range from inadequate to nonexistent, and there is a pressing need to fully capitalize on the benefits of SH146 bridge rebuild/regional evacuation route. The city's economic foundation requires strengthening, with a focus on broadening local employment opportunities and diversifying housing options. Kemah's new emergency response plan works well for hurricane season, but specific strategies are needed for better preparedness and recovery in extreme events. Desired Outcomes: 1. Reduced Traffic Congestion - Improving transportation infrastructure and promoting multimodal connectivity. 2. Increased Economic Opportunities - Encouraging mixed-use developments and enhancing the local economy. 3. Improved Public Spaces - Creating more attractive and functional urban environments. 4. Enhanced Environmental Sustainability - Incorporating green spaces and promoting eco-friendly practices. The scope of work involves developing a comprehensive plan to advance the goals of The Houston-Galveston Area Council H-GAC’s Livable Centers program. This plan should outline transportation infrastructure investments that support the study's objectives within the designated area. The Livable Center study must integrate the essential elements outlined in components 1-5 below, ensuring that all recommendations are transportation- and land use-focused. The study should emphasize reducing vehicle miles traveled, enhancing air quality, and promoting the live-work-play principles critical to creating a well-connected and accessible community. The plan elements below should inform the project work program and timeline included in the Contractor proposal (see Section 11, Submission Uploads/Required Documents) and should not be interpreted as a prescription of anticipated plan tasks or chapters. Contractors are encouraged to build a work program that is both creative and suited for the specific needs of the project sponsor and the study area. Element 1: Existing Conditions Analysis and Report The Contractor will collect and analyze all relevant data to assess the existing conditions within the study area as they pertain to the goals of the Livable Centers program. Key elements for evaluation include, but are not limited to: Demographic trends Community character Multimodal circulation and connectivity Economic indicators Housing diversity and affordability Community health metrics Placemaking potential In collaboration with H-GAC and the local sponsor, the Contractor will gather targeted data sets essential for evaluating the project's impact. Specific elements to be evaluated include, but are not limited to: Physical conditions (e.g., land use, infrastructure, sidewalk, public realm, natural features) Environmental data Housing and market trends Historical and cultural context Demographic information As part of the existing conditions analysis, the contractor will plan and execute a site visit for contractor, H-GAC, and sponsor staff to view and experience firsthand key locations and conditions within the study area. The Existing Conditions Report must be formatted accordingly. Element 2: Conceptual Plan and Recommendations Based on community feedback, the findings from the needs assessment, and the stated objectives of this study, the Contractor is required to develop a conceptual plan that outlines a vision for the Kemah Focused Livable Center Study and provides recommendations to achieve that vision. The plan must prioritize multimodal circulation and connectivity, with particular attention to land use within and surrounding the study area. Recommendations should recognize current mobility guidelines and principles in place within the Kemah study area. Additionally, the recommendations must promote economic development, housing diversity and affordability, resilience, and placemaking. Key considerations include, but are not limited to, the following: Enhancing multimodal access and connectivity by: Identifying potential sidewalk connections that improve access to transit stops Evaluating areas where sidewalk and roadway modifications could provide the greatest community benefits for connectivity and access. Determining optimal locations for additional pedestrian infrastructure Recommending all other solutions that aim to eliminate barriers and make non-automobile mode choice attractive Supporting resilience and quality of place by: Identifying placemaking opportunities to strengthen civic pride. Identifying methods to reduce the study area’s vulnerability to storm damage, ponding, and flooding Developing safe and equitable infrastructure by: Reviewing existing land use and identifying opportunities for increased flexibility in density and design Identifying opportunities for infill development and the redevelopment of underutilized parcels Promoting economic development and housing diversity by: Exploring options to diversify the housing stock and improve affordability. Exploring opportunities to strengthen economic growth of local small businesses. Leveraging engagement feedback by: Utilizing ongoing input from community advisory groups and other engagement activities. Conducting informal interviews or working sessions with residents and advisory groups. Providing virtual engagement opportunities to accommodate both in-person and remote participation. These considerations are intended to guide the Contractor in crafting a comprehensive and forward-looking plan that aligns with the needs and aspirations of the community. Element 3: Conceptual Renderings for Specific Proposed Recommendations The Contractor must produce at least three (3) visual renderings of select recommendations with design concepts that may include circulation, streetscape design, commercial and residential developments, capital improvements to support non-automobile transportation modes, and other strategies included in the conceptual plan and recommendations. Element 4: Implementation Plan for Proposed Recommendations In collaboration with the project sponsor and advisory group(s), the Contractor is required to prepare an implementation plan that includes, at a minimum, the following elements for each recommendation: General project scope. Policy or code recommendations to support implementation Potential implementation partners Implementation timeline categorized by priority, with anticipated timeframes for short-term (1-5 years), mid-term (6-10 years), or long-term (11+ years) initiatives, as well as a phased implementation strategy that acknowledges budgetary constraints Benefits analysis addressing both individual and aggregate project benefits Generalized implementation costs based on commercially available data, including potential funding sources Clearly highlighted highest priority recommendations, based on public feedback The implementation plan must also inform and prioritize a capital improvement program that aligns with Livable Centers objectives and community goals. Element 5: Public Engagement Plan The Contractor is required to develop a comprehensive public engagement plan to foster meaningful community involvement and ensure participation across all segments of the community. This public engagement plan is a mandatory deliverable. Achieving public buy-in, support, and feedback is essential for the success of the study and the effective implementation of recommended projects. The engagement strategy should be designed to both celebrate and incorporate the local culture, utilizing community members actively in outreach efforts. Engagement efforts should gather insights that build a vision aligning with community needs and reinforcing existing community assets. As community engagement is critical to the study's success, the approach should integrate diverse groups through multiple engagement methods, encouraging active participation, goal setting, vision-building, and community investment in the outcomes. The engagement plan must include a participation target, based on a demographic snapshot and as defined by the project sponsor. Public engagement activities should be scheduled to coincide with existing community events (e.g., neighborhood meetings, school gatherings, church services, city events), rather than as standalone sessions. Following each engagement event or activity, a summary report will be prepared, which will include a description of activities, participant count, engagement reach, and visual documentation. Where surveys are utilized for feedback collection, demographic data should be gathered to assess whether engagement targets are being met. A Community Advisory Group (CAG) will be formed, comprising of at least one representative from each of the following: local schools, community or faith-based organizations, residents, business and property owners, and law enforcement. The community advisory group will also include appointed ex-officio members (subject matter experts) with representatives from city/county staff, H-GAC Transportation, and the Texas Department of Transportation. For the engagement process to be fully inclusive, contractor teams should be prepared to develop engagement materials in English and Spanish. Each phase of the study process should include at least one opportunity for public and community advisory group engagement. The contractor, in collaboration with the study sponsor and H-GAC, will also select and meet with appropriate implementing partner agencies for the purpose of refining and vetting study recommendations to ensure they align with funding sources and partner agency priorities. The Contractor must consider the following: Participation target based on a demographic snapshot and as defined by the project sponsor Multilingual considerations to include public-facing materials in English and Spanish Summary report for each engagement event which will include a description of activities, participant count, engagement reach, and visual documentation Requirements for Deliverables Deliverables require review and final approval from H-GAC and the study sponsor. The final plan must be informed by a combination of meaningful public engagement and the data collected in the existing conditions assessment, must include an implementation plan, and must quantify the benefits of study recommendations. Project Management Plan A Project Management Plan (PMP) will be developed at the beginning of the planning process as the project’s first deliverable, and will contain the following information: Consultant team roles and responsibilities Communication protocols, including points of contact and project meetings Project schedule, in the form of an adaptable Gantt Chart Detailed timeline of tasks to be completed throughout the planning process Quality Control/Quality Assurance Protocols Public Engagement Plan At a minimum, the Contractor is required to create and implement a public engagement plan approved by the project sponsor and H-GAC. This plan must include at least three (3) public meetings, three (3) community advisory group meetings, and a mechanism for ongoing online engagement. Additionally, the plan should define a measurable engagement goal based on a demographic profile of the study area. Implementation Plan At a Minimum, the implementation plan shall, at a minimum, include the following elements: Identification of Recommended Projects, Programs, and Policies: Clearly define each recommendation, including a detailed description of its scope. Project Cost Estimates: Provide planning level cost estimates derived from commercially available data to ensure realistic budgeting. Identification of Potential Partners and Funding Sources: Outline prospective implementation partners and viable funding sources to support project execution. Phasing and Timeline Development: Present a practical timeline for project implementation, including phased stages, anticipated project barriers, and key milestones associated with each recommendation. Quantification of Benefits The plan must, at a minimum, quantify the benefits of the recommendations by estimating the reduction in vehicle miles traveled (VMT) and corresponding emissions reductions within the study area, using H-GAC’s methodology template. Where feasible , the plan should also identify additional anticipated benefits of the recommended projects, including potential health improvements. Final Plan/Report The final study report must be developed based on comprehensive public engagement and data from the existing conditions assessment. It should include an implementation plan and quantify the benefits of the study's recommendations. The Contractor must reference the Livable Centers Report Visual Reference Guide , provided by the H-GAC Project Manager, for more information on visual requirements. The final report deliverable must adhere to specific formatting requirements to ensure clarity and professionalism. All pages should maintain consistent 0.5-inch margins on all sides, allowing for an organized presentation of content. The report can be formatted in either portrait (8.5x11 inches) or landscape (11x8.5 inches) orientation, depending on the nature of the content and should be printed front and back. A clear visual hierarchy is essential; this includes consistent font choices for headings and body text, appropriate use of bold and italics, a structured layout that guides the reader through the document, and at least one full-page study area map. Additionally, the inclusion of maps and figures is mandatory, with each visual element properly labeled and referenced within the text to enhance understanding and engagement. In addition to a table of contents, there must be a list of maps and a list of figures to facilitate easy navigation throughout the report. Contractor shall use WebAIM contrast checker or another accessibility tool to verify and ensure compliance with accessibility standards Public Facing Materials Public facing materials will be prepared in English and at least one additional language, as specified by the project sponsor. The public engagement materials should be creative and engaging, but most importantly should garner meaningful and quantifiable input from the community. All public facing materials, including materials shared with the community advisory group, will require a review period and final approval by both H-GAC and the study sponsor before being shared or printed. Final Expected Deliverables T he Contractor will deliver a completed Livable Centers Plan, inclusive of all deliverables outlined below. All project deliverables must comply with the Americans with Disabilities Act (ADA) and Section 508 standards for digital accessibility. This includes screen reader compatibility, proper heading structures, alt text for images, and accessible formats for public-facing documents. Contractor must ensure that any web-based content meets WCAG 2.1 Level AA requirements. ​ A completed Project Management Plan (PMP) outlining team roles and responsibilities, communication protocols, project schedule, and other relevant project management details. ​​A completed Executive Summary of the final plan that captures the major concepts and recommendations of the plan – at least five (5) hard copies, but not to exceed ten (10), 1 electronic format. Ideally, the executive summary is to be formatted in a way that makes it easy for the project sponsor to download and print additional copies. ​​ A completed final plan and accompanying appendices accomplishing the objectives of the study and meeting the stated needs of H-GAC and the project sponsor – at least five (5) hard copies, but not to exceed ten (10), 1 electronic format. If necessary and reasonable, certain components of the final plan may be delivered as appendices. ​A completed existing conditions report, formatted accordingly. A completed Public Engagement Plan with outlined engagement goal(s) based on population snapshot. Project team agendas, meeting minutes and sign-in sheets/attendance reports/photos from engagement/interested party meetings. ​​​A completed implementation plan, formatted accordingly. ​ Completed Livable Center Program Tracker for future tracking of plan success including projects, policies, and programs to be administered by H-GAC to the Client. Summary matrix of tables, estimated costs, maps, and graphics including page number. Subject area and original file locations must be provided. Original files of the plan and final report in editable format, including graphics and Geographic Information System (GIS) files (to include Adobe files, .shp, gdb, .kmz and .mxd files). All recommendations must be spatially referenced in GIS for future mapping and H-GAC/Client use. All study recommendations will be consolidated to a single polyline shapefile called “StudyName_Rec”. This consolidated shapefile should be separate from the stylized mapping done for the report. Inquiries and Clarifications Respondents must submit questions by the Questions deadline indicated in this Solicitation. Telephone/email inquiries are not accepted. H-GAC will respond as completely as possible to each question. Questions and answers will be posted as soon as available. The names of respondents who submit questions will not be disclosed. All clarifications will be available in the Question and Answer and/or Addenda Sections in OpenGov, only the information in these sections should be used in preparing a response; verbal communications and other written documents intended to clarify and interpret will not legally bind H-GAC. H-GAC does not assume responsibility for the receipt of any clarifying information. Respondent must carefully examine all Solicitation documents and become thoroughly familiar with all requirements before submission to ensure the response meets the intent of this Solicitation. Respondent is responsible for making all investigations and examinations that are necessary to ascertain conditions affecting the requirements of this Solicitation. Failure to make such invest Source: OpenGov https://procurement.opengov.com/portal/h-gac/projects/310784 Canonical URL: https://govcontractfinder.com/contracts/kemah-focused-livable-centers-study-opengov-77027-project-310784