La Palma Alleys Sewer Improvement Project State and local opportunity open The City of Anaheim RCP2023-21228 Posted: 2026-10-29T18:34:14.258Z Response deadline: 2026-12-03T22:00:00.000Z These proposed improvements will address the capacity and operational deficiencies under the existing conditions for the area shown in Exhibit A . The sewer systems were constructed with 6” minimum diameter instead of the City’s current minimum standard 8-inches in diameter. This old 6-inch pipe is experiencing significant maintenance problems such as offset joints and root intrusion and its improvement is a priority for the City. Implementation of this program will improve the overall performance, reduce maintenance costs, ensure capacity for future developments, and maintain the reliability of the sewer system. The City of Anaheim Public Works Operations team has identified a previously unknown sag or siphon between manholes SW070319 and SW071102 in La Palma Ave. This segment has caused operational issues. This project will identify solutions to remove this operational deficiency. City survey shows the 21-inch sewer line on the south side of La Palma at a lower elevation than the 10-inch sewer line. Additionally, this project aims to remove the existing siphon from SW070314 to SW071101 in the intersection of La Palma and Harbor. The identification of any feasible solutions to this removal is requested in the projects Preliminary Design Report (PDR). Project Details Important Instructions for Electronic Submittals The City of Anaheim is accepting electronic bid submissions. Bidders shall create a FREE account with OpenGov Procurement by signing up at https://procurement.opengov.com/signup . Once you have completed account registration, browse back to this page, click on "Draft Response", and follow the instructions to submit the electronic bid. Scope of Work or Project Details Please see the Attachments section for specifications and attachments. Introduction Summary These proposed improvements will address the capacity and operational deficiencies under the existing conditions for the area shown in Exhibit A . The sewer systems were constructed with 6” minimum diameter instead of the City’s current minimum standard 8-inches in diameter. This old 6-inch pipe is experiencing significant maintenance problems such as offset joints and root intrusion and its improvement is a priority for the City. Implementation of this program will improve the overall performance, reduce maintenance costs, ensure capacity for future developments, and maintain the reliability of the sewer system. The City of Anaheim Public Works Operations team has identified a previously unknown sag or siphon between manholes SW070319 and SW071102 in La Palma Ave. This segment has caused operational issues. This project will identify solutions to remove this operational deficiency. City survey shows the 21-inch sewer line on the south side of La Palma at a lower elevation than the 10-inch sewer line. Additionally, this project aims to remove the existing siphon from SW070314 to SW071101 in the intersection of La Palma and Harbor. The identification of any feasible solutions to this removal is requested in the projects Preliminary Design Report (PDR). Timeline Release Project Date: October 29, 2026 Question Submission Deadline: November 19, 2026, 2:00pm Response Submission Deadline: December 3, 2026, 2:00pm Project Contact Joshua Vargas Associate Engineer 200 S Anaheim Blvd Anaheim , CA 92805 Email: jovargas@anaheim.net Phone: (714) 765-5100 Ext: 5835 Evaluation Phases Vendor Questionnaire Attachments Source: OpenGov https://procurement.opengov.com/portal/anaheim/projects/312152 Canonical URL: https://govcontractfinder.com/contracts/la-palma-alleys-sewer-improvement-project-opengov-54-project-312152