Lift Station E-08 Backup Electrical Power Generator (Project No. 25-8071A) State and local opportunity open City of Hollywood IFB-451-27-JM Posted: 2026-11-03T21:36:14.464Z Response deadline: 2026-12-09T20:00:00.000Z The work to be performed includes site, civil, structural and electrical work associated with the construction of LS E-08 Backup Electrical Power Generator Project in the City of Hollywood. The work to be performed includes but is not limited to the removal of existing generator, fuel tank, electrical items, installation of new emergency generator that is designed to be protected against a 500-year flood event, fuel tank, access for maintenance with all ancillary equipment as required, as shown on the plans. The construction activities include but are not limited to survey, locating and protecting existing utilities, maintenance of traffic, soil boring, dewatering, electrical equipment installation, restoration, furnishing and installing emergency generator, temporary MOT, maintaining building access, maintaining continuous sanitary service and property access, coordination with different agencies such as the City, FEMA, AT&T, and FPL, preparation and submittal of shop drawings and record drawings, testing, and other repairs or restorations. Work shall be performed to ensure continuous operation and appropriate performance of all existing water, sewer, stormwater and franchise utilities systems, to minimize impacts to roadway traffic, parking, residents and/or businesses and shall be coordinated with the City in advance. It is the intent of the City to obtain a complete and working installation under this contract and any items of labor, materials or equipment, which may reasonably be assumed as necessary to accomplish this end, should be supplied whether or not specifically shown on the plans or described herein. Maintenance of the existing utility systems is mandated throughout the construction period. SCOPE OF WORK/SERVICES Project Description The work to be performed includes site, civil, structural and electrical work associated with the construction of LS E-08 Backup Electrical Power Generator Project in the City of Hollywood. The work to be performed includes but is not limited to the removal of existing generator, fuel tank, electrical items, installation of new emergency generator that is designed to be protected against a 500-year flood event, fuel tank, access for maintenance with all ancillary equipment as required, as shown on the plans. The construction activities include but are not limited to survey, locating and protecting existing utilities, maintenance of traffic, soil boring, dewatering, electrical equipment installation, restoration, furnishing and installing emergency generator, temporary MOT, maintaining building access, maintaining continuous sanitary service and property access, coordination with different agencies such as the City, FEMA, AT&T, and FPL, preparation and submittal of shop drawings and record drawings, testing, and other repairs or restorations. Work shall be performed to ensure continuous operation and appropriate performance of all existing water, sewer, stormwater and franchise utilities systems, to minimize impacts to roadway traffic, parking, residents and/or businesses and shall be coordinated with the City in advance. It is the intent of the City to obtain a complete and working installation under this contract and any items of labor, materials or equipment, which may reasonably be assumed as necessary to accomplish this end, should be supplied whether or not specifically shown on the plans or described herein. Maintenance of the existing utility systems is mandated throughout the construction period. Technical Specifications Refer to the Technical Specifications included in Attachment D. Contractor Qualifications At the time of submission of the bid, Bidder must possess, and be able to provide City, any and all required Federal, State, County and/or municipal licenses, including but not limited to certificates of competency and occupational licenses. Moreover, upon receipt of the Award of the Contract, Bidder must provide proof of valid licensing for all subcontractors and/or material suppliers hired by the Contractor. When the Bidder is a joint venture, in order to satisfy the construction licensing requirements one member of a Joint Venture must hold a valid state certificate as well as the appropriate county and city license. The Contractor shall be held responsible for assurance that all subcontractors and/or material suppliers hired by the Contractor have the appropriate state certificate and licenses. Any one of the following causes, among others, may be considered as sufficient justification to disqualify a bidder and reject his or her bid: A. Submission of more than one bid for the same work by an individual, firm, partnership or corporation under the same or different names. B. Evidence of collusion. C. Previous participation in collusive bidding on work for the City of Hollywood, Florida. D. Submission of an unbalanced bid in which the prices bid for some items are out of proportion to the prices bid for other items. E. Lack of competency. The Bidder shall provide proof that their past experience can demonstrate similar complexity and size compared to this contract. The Engineer may declare any bidder ineligible, at any time during the process or receiving bids or awarding the contract, if developments arise which, in his opinion, adversely affects the bidder's responsibility. The Bidder will be given an opportunity, by the engineer, to present additional evidence before final action is taken. F. Lack of responsibility as shown by past work judged by the Engineer from the standpoint of workmanship and progress. G. Non-compliance with the City’s Local Preference (when applicable). H. Uncompleted work for which the Bidder is committed by Contract, which is in the judgment of the Engineer, might hinder or prevent the prompt completion of work under this Contract. I. Being in arrears on any existing Contracts with the City, or any taxes, licenses or other monies due the City; in litigation with the City or having defaulted on a previous contract with the City. Deliverable and Objectives Refer to the Technical Specifications included in Attachment D and Drawings included in Attachment E. Project Schedule / Timeline 240 Calendar Days to Substantial Completion and 270 Calendar Days to Final Completion. Refer to Attachment C - Supplementary General Conditions, Section 1, Project Schedule. Questions Refer to IFB Section 5 - BID SUBMISSIONS , Form 15 - Information Required from Bidders. SUMMARY Summary Background Contact Information Timeline INTRODUCTION Purpose The City of Hollywood, Florida (City) is seeking bids from qualified and experienced contractors, hereinafter referred to as the Contractor or Bidder, to provide and install a Backup Electrical Power Generator at Lift Station E-08 for the City, in accordance with the terms, conditions, and specifications contained in this solicitation. Responses to this solicitation are due by Wednesday, December 9, 2026 , by 3:00 pm , and will be opened in a virtual public setting on December 9, 2026, at 3:00 PM EST . Submittals shall be received electronically through OpenGov, the City's eProcurement Portal ("Portal"). Submittals shall be considered a bid on the part of the bidder, which bid shall be deemed accepted upon approval of the City, and in case of default, the City reserves the right to accept or reject any or all bids, to waive irregularities and technicalities, and request new bids The City also reserves the right to award any resulting agreement as it deems will best serve the interests of the city. Submission of a bid shall serve as prima facie evidence that the Bidder has examined this solicitation and is fully aware of all conditions affecting the provision of services and the evaluation criteria and scoring methodology as set forth in this solicitation document. Pre-bid Conference and/or Site Visit There will not be a pre-bid conference or site visit for this solicitation. It will be the sole responsibility of the Bidder to become familiar with the scope of the City’s requirements prior to submitting a bid. No variation in price or conditions shall be permitted based upon a claim of ignorance. Submission of a bid will be considered evidence that the Bidder has familiarized themselves with the nature and extent of the work, equipment, materials, and labor required. OpenGov ("Portal") The City of Hollywood uses OpenGov, the e-Procurement Portal (“Portal”) ( https://procurement.opengov.com/portal/hollywoodfl ) to administer the competitive solicitation process, including but not limited to soliciting bids/proposals, issuing addenda, posting results and issuing notification of an intended decision. The City shall not be responsible for a Bidder's/Proposer’s inability to submit a bid/proposal by the bid/proposal end date and time for any reason, including issues arising from the use of the Portal. Point of Contact For information concerning procedures for responding to this solicitation, contact the Point of Contact within the Office of Procurement Services, Julissa Marcano , Senior Purchasing Agent at jmarcano@hollywoodfl.org or by phone at (954) 710-9956 , or Jean Joinville, Procurement Manager, at jjoinville@hollywoodfl.org or by phone at 954-921-3290. Such contact is to be for clarification purposes only. All questions must be submitted in writing via the Portal by Thursday, November 19, 2026 , by 5:00 pm , in order to receive a timely response. Project Manager: Marta Alonso , Consultant , Public Utilities , email: malonso@hollywoodfl.org , or by phone: (954) 921-3930 Ext: 5617 . For information concerning technical specifications, please utilize the question / answer feature provided by OpenGov at https://procurement.opengov.com/portal/hollywoodfl . Questions of a material nature must be received prior to the cut-off date specified in the solicitation schedule. Material changes, if any, to the scope of services or bidding procedures will only be transmitted by written addendum. (See addendum section of the OpenGov site). Bidders please note: No part of your bid can be submitted via FAX. No variation in price or conditions shall be permitted based upon a claim of ignorance. Submission of a bid will be considered evidence that the Bidder has familiarized themselves with the nature and extent of the work, and the equipment, materials, and labor required. The entire bid response must be submitted in accordance with all specifications contained in this solicitation. The questions and answers submitted in OpenGov shall become part of any contract that is created from this solicitation. It is the sole responsibility of the Bidder to ensure that their bid is submitted electronically through the Portal at https://procurement.opengov.com/portal/hollywoodfl Cone of Silence The City of Hollywood City Commission adopted Ordinance No. O-2007-05, which created Section 30.15(F) imposing a Cone of Silence for certain City purchases of goods and Services. The Cone of Silence refers to limits on communications held between vendors and vendor’s representatives and City elected officials, management and staff during the period in which a Formal Solicitation is open. The Ordinance does allow potential vendors or vendor’s representatives to communicate with designated employees for the limited purpose of seeking clarification or additional information. The names and contact information of those employees that may be contacted for clarification or additional information are included in the solicitation. The Cone of Silence does not prohibit a vendor or vendor’s representative from communicating verbally, or in writing with the City Manager, the City Manager’s designee, the City Attorney or the City Attorney’s designee on those procurement items to be considered by the City Commission. The Cone of Silence does not prohibit a vendor or vendor’s representative from making public presentations at a duly noticed pre-bid conference or duly noticed evaluation committee meeting or from communicating with the City Commission during a duly noticed public meeting. The Cone of Silence shall be imposed when a formal competitive solicitation has been issued and shall remain in effect until an award is made, a contract is approved, or the City Commission takes any other action which ends the solicitation. To view the Cone of Silence, go to the City of Hollywood Code of Ordinance online, and view Section 30.15F All communications regarding this bid should be sent in writing to the Procurement and Performance Management Division as identified in this bid. SPECIAL TERM AND CONDITIONS Addenda, Changes, and Interpretations It is the sole responsibility of each contractor to notify the Point of Contact utilizing the question / answer feature provided by OpenGov and request modification or clarification of any ambiguity, conflict, discrepancy, omission or other error discovered in this competitive solicitation. Requests for clarification, modification, interpretation, or changes must be received prior to the Question and Answer (Q & A) Deadline. Requests received after this date may not be addressed. Questions and requests for information that would not materially affect the scope of services to be performed, or the solicitation process will be answered within the question / answer feature provided by OpenGov and shall be for clarification purposes only. Material changes, if any, to the scope of services or the solicitation process will only be transmitted by official written addendum issued by the City and uploaded to OpenGov as a separate addendum to the solicitation. Under no circumstances shall an oral explanation given by any City official, officer, staff, or agent be binding upon the City and should be disregarded. All addenda are a part of the competitive solicitation documents and each firm will be bound by such addenda. It is the responsibility of each to read and comprehend all addenda issued. Dimensions, Quantities and Subsurface Information Dimensions, quantities, and subsurface information supplied by the City are in no way warranted to indicate true amounts or conditions. Bidders/Contractors shall neither plead misunderstanding or deception nor make claims against the City if the actual amounts, conditions, or dimensions do not conform to those stated. Any "Outside" reports made available by the Engineer are neither guaranteed as to accuracy or completeness, nor a part of the Contract Documents. Trench Safety Form The Trench Safety Form included in the Bid Documents must be completed and signed. Noncompliance with this requirement may invalidate the bid. Changes and Alterations Bidder may change or withdraw a Bid at any time prior to Bid submission deadline; however, no oral modifications will be allowed. Modifications shall not be allowed following the Bid deadline. Bidder’s Costs The City shall not be liable for any costs incurred by Bidders in responding to this solicitation. Pricing/Delivery All pricing must include delivery and installation and be quoted FOB: Destination, unless specified otherwise in the #SCOPE OF WORK/SERVICES section. Price Validity Prices provided in this solicitation shall be valid for at least One-Hundred and Twenty (120) days from time of solicitation opening unless otherwise extended and agreed upon by the City and Bidder. No Exclusive Contract Bidder agrees and understands that the contract shall not be construed as an exclusive arrangement and further agrees that the City may, at any time, secure similar or identical services from another vendor at the City’s sole option. Responsive In order to be considered responsive to the solicitation, the contractor’s bid shall fully conform in all material respects to the solicitation and all of its requirements, including all form and substance. Responsible In order to be considered as a responsible bidder, bidder shall be fully capable to meet all of the requirements of the solicitation and subsequent contract, must possess the full capability, including financial and technical, to perform as contractually required, and must be able to fully document the ability to provide good faith performance. Minimum Qualifications To be eligible for award of a contract in response to this solicitation, the Bidder must demonstrate that they have successfully completed services, as specified in the #SCOPE OF WORK/SERVICES section of this solicitation, are normally and routinely engaged in performing such services, and are properly and legally licensed (if required) to perform such work. Bidder must possess and be able to provide the City with any and all required Federal, State, County and/or municipal licenses, and occupational licenses. Bidder must be able to provide proof of valid licensing for all subcontractors and/or material suppliers hired by the contractor, if requested. In addition, the Bidder must have no conflict of interest with regard to any other work performed by the Bidder for the City. Award of Contract Award may be in the aggregate, or by line Item, or by group, whichever is determined to be in the best interest of the City. Award will be made to the responsive and responsible bidder, quoting the lowest price, for that product/service that will best serve the needs of the City. The Contract will be awarded only to a Bidder, who in the opinion of the Engineer, is fully qualified to undertake the work, quoting the lowest price, for that product/service that will best serve the needs of the City. The City reserves the right before awarding the Contract to require a Bidder to submit such evidence of his qualifications as it may deem necessary and may consider any available evidence of his financial status, technical qualifications, and other qualifications and abilities. The City also reserves the right to accept or reject any or all bids, part of bids, and to waive minor irregularities or variations to specifications contained in bids, and minor irregularities in the bidding process. The City also reserves the right to award the contract on a split order basis, lump sum basis, individual item basis, or such combination as shall best serve the interest of the City. As applicable, the City shall comply with Section 287.05701, Florida Statutes, in not considering or giving preference for an award based on a vendor’s social, political, or ideological interest. The City, in all solicitations or advertisements for purchasing of goods, supplies, materials, equipment and services, will receive consideration from qualified businesses without regard to race, color, religion, sex, sexual orientation, gender identity, or national origin. Execution Of Contract The Bidder awarded the Contract shall, within ten days from the date of award, execute all required documents and submit them electronically, complete with valid signatures and seals. A. The Contract B. Performance and Payment Bond C. Evidence of required Insurance D. Proof of authority to execute the Contract E. Proof of authority to execute the Bond on behalf of the Awardee F. List of Subcontractors, estimated Contract Value for each and proof that such subcontractors possess all required Federal, State, County and/or municipality licenses, including but not limited to certified of competency and occupational license The above documents must be furnished, executed and delivered before the Contract will be executed by the City. The Contract shall not be binding upon the City until it has been executed by the City and a copy of such fully executed Contract is delivered to the Contractor. Failure To Execute Contract, Bid Guaranty Forfeited Should the Bidder to whom the Contract has been awarded refuse or fail to complete the requirements of Section 2.13 above within ten (10) days after Notice of Award, the additional time in days (including weekends) required to CORRECTLY complete the documents will be deducted, in equal amount, from the C Source: OpenGov https://procurement.opengov.com/portal/hollywoodfl/projects/323033 Canonical URL: https://govcontractfinder.com/contracts/lift-station-e-08-backup-electrical-power-generator-project-opengov-954-project-323033