Lincoln Village Neighborhood Street Rehabilitation Project - Phase 1 State and local opportunity open City of Rancho Cordova 80121 Posted: 2026-11-13T19:41:54.892Z Response deadline: 2026-12-10T22:00:00.000Z The City of Rancho Cordova is seeking competitive bids for Lincoln Village Neighborhood Street Rehabilitation Project - Phase 1 . Estimated Construction Cost: $ 6,360,000 Contractor License Required: General Engineering Contractor, Class A or C-8 Concrete Contractor Bids due before 2:00 pm on Thursday, December 10, 2026 . Technical Construction Provisions Mobilization This work shall consist of, but not be limited to, preparatory work and operations, including, those necessary for the movement of personnel, equipment, supplies and incidentals to the project site; for the establishment of all offices, buildings and/or other facilities necessary for work on the project; and for all other work and operations which must be performed or costs incurred prior to beginning work on the various contract items on the project site. This item includes the costs associated with obtaining all necessary permits and any associated fees necessary to perform the work; and includes removal of all construction equipment, personnel, construction related materials, temporary facilities, construction markings/paint, debris, and all other construction related items. The Contractor shall photograph the entire site prior to beginning construction per Section 11-1 of the Sacramento County Standard Specifications. Photographs must be taken no more than two (2) weeks prior to beginning Construction and be submitted to the City prior to receiving the first progress payment thereafter. No separate payment shall be made for photographs. Full compensation for photographs is included in the price paid for Mobilization and no separate payment will be made therefore. Measurement and Payment Mobilization shall be paid for on a LUMP SUM basis. Measurement will be based on the percentage of work completed as determined by the City Engineer. Progress payments shall not exceed 75% until final closeout documents, including record drawing markups, are received and full demobilization, including equipment and material being removed from the site, has occurred. The contract lump sum price paid for Mobilization shall include full compensation for furnishing all labor, materials, tools, equipment and incidentals, and for doing all the work involved in mobilization and demobilization as specified herein, complete and in place, specified in the Standard Specifications, these Special Provisions, and as directed by the City Engineer, and no additional compensation will be allowed. The lump sum bid for Mobilization shall not exceed 10% of the total bid price. Traffic Control Plan Provisions for public convenience and safety, construction area traffic control, and hours of work shall be in accordance with the Standard Construction Specifications. Specific requirements are provided in Sections 6-11, 6-12, 6-13, 6-14, 7-8, and 12 of the of the Standard Construction Specifications. The Contractor shall be responsible for public safety and traffic control within the Project limits and on the approaches to the Project. Prior to performing any work that requires a lane closure, a Traffic Control Plan, prepared by the Contractor, shall be reviewed and approved by the City of Rancho Cordova. Unless otherwise noted in the Technical Provisions or approved by the Agency, traffic control shall be within the following hours: 8:30 AM to 3:30 PM on arterial and collector roadways 8:00 AM to 4:30 PM on residential roadways When working near schools the Contractor shall notify the schools ten (10) working days before lane closure adjacent to schools. It is the Contractor’s responsibility to review bell schedules and be aware of the start and stop times of the schools including minimum days. No lane closures are allowed before 8:45 AM. No lane closures are allowed Monday through Friday between 30 minutes before and after pickup times. At least one-lane of access shall be opened to the school at all times. Any signage required on school property is subject to Contractor receiving school approval. Contractor shall submit a specific Pedestrian Routing Plan (PRP) demonstrating the alternate paths that are to be accessible to all pedestrians when crosswalks or other pedestrian facilities are temporarily closed or relocated. Temporary alternate circulation paths are required to be provided by the Contractor to achieve the maximum accessibility feasible under existing conditions. Accessibility to all includes those with visual impairments. A traffic control plan (or plans) shall be submitted for review for any work requiring modifications of existing traffic patterns. The traffic control plan shall include provisions for vehicular, pedestrian, and bicycle access. Additionally, the traffic control plan shall address traffic signal operation for any work performed within 200 feet of a signalized intersection. Construction shall be suspended and no activities that interfere with public traffic shall be conducted on Martin Luther King Jr. Day, President’s Day, Memorial Day, Independence Day, Labor Day, Veterans Day, during the four-day Thanksgiving weekend and on December 21 through January 1 unless approved by City Engineer. The local Fire Department, Sheriff/Police Department, California Highway Patrol, and Regional Transit (if applicable) shall be notified 24 hours in advance of construction work. Traffic Control Plan shall include installation of City provided signage specifying funding source. Construction area signs shall conform to the requirements of Section 12-3.07 “Construction Signs” of the Standard Construction Specifications. During construction, the Contractor shall not have any parking closures, in the same area, for more than three (3) consecutive working days. With the exception of times during active paving, at least one lane of 10-foot minimum pavement width shall be maintained for each direction of travel during standard construction hours. Lane closure shall not be allowed without an approved traffic control plan, proper advance warning devices, signing and flag person control. Unless otherwise approved by the City of Rancho Cordova construction shall not be permitted on weekends and holidays. Minor deviations from the requirements of this section concerning hours of work which do not significantly change the cost of the work may be permitted upon the written request of the Contractor if in the opinion of the City Engineer, public traffic will be better served and the work expedited. These deviations shall not be adopted by the Contractor until the City Engineer has approved them in writing. All other modifications will be made by contract change order. Pedestrian access facilities that comply with ADA regulations shall be provided through construction areas within the right-of-way as shown on the Plans and as specified herein. Pedestrian walkways shall be provided with surfacing of cold mix or hot mix asphalt concrete, Portland cement concrete, or timber. Surfaces shall be skid resistant and free of irregularities. After grinding, the contractor shall place cutback at curb return to eliminate tripping hazard. Paved pedestrian access to sidewalks shall be maintained during all stages of construction. Walkways shall be maintained in good condition by the Contractor. Walkways shall be kept clear of obstructions. Portable delineators, signs and tapers shall be installed per Section 12-3.13 of the Standard Construction Specifications where temporary drop-offs are created by construction. Full compensation for providing said pedestrian facilities shall be considered as included in the prices paid for the various contract items of work involved and no additional compensation will be allowed therefore. Any closure or detour of pedestrian access for contractor’s convenience shall be approved in writing by the City Engineer prior to scheduling work in the area under question. Any request for temporary closure or detour of pedestrians shall be made in writing and include plans and information showing requested duration, days of the week, routes, signing and safety measures. Approval or rejection of requests will be at the sole discretion of the City Engineer. Additional signing and safety measures for pedestrians approved as part of a pedestrian access modification shall be considered as included in the prices paid for the various contract items of work involved and no additional compensation shall be allowed therefore. PORTABLE CHANGEABLE MESSAGE SIGN(S) Portable changeable message sign(s) shall be furnished, placed, operated, and maintained prior to Storm Water Pollution Prevention Plan (SWPPP) This work shall conform to the requirements in Section 10-4.04, ("Stormwater Pollution Prevention Plan (SWPPP) of the Standard Construction Specifications and these Special Provisions. The Contractor shall be required to prepare a SWPPP in conformance with Section 10-4.04 of the Standard Construction Specifications This Plan will be subject to review and approval by the City Engineer. The Plan shall be submitted to the City Engineer for review at least 5 days prior to the start of construction. During the review process, the Contractor shall revise the Plan as directed by the City Engineer. In no case will the Contractor be allowed to begin the clearing, grubbing, or earthwork operations without an approved SWPPP. If the Contractor’s method fails to prevent erosion or siltation, the Contractor shall revise and adjust the control measures to provide effective control and shall be responsible for any damage resulting from erosion or siltation originating on the work site. The Contractor shall furnish all of the labor, materials, tools, equipment and incidentals necessary to implement the erosion and sediment control measures as shown on the Contractor prepared and City approved SWPPP. All monitoring, inspections, testing, and reporting activities shall be performed by the Contractor. For bidding purposes, the SWPPP is assumed to Risk Level 2. All fees and security deposits required for the preparation and completion of the SWPPP will be the responsibility of the Contractor. The City of Rancho Cordova will obtain the necessary General Construction Storm Water Permit from the State of California and the Contractor will be required to conform to permit requirements. Measurement and Payment Conformance with all applicable erosion and sediment control requirements shall be included in the LUMP SUM Price. Measurement will be based on the percentage of work completed as determined by the City Engineer. SWPPP shall include full compensation for furnishing all labor materials, tools, equipment and incidentals for doing the work involved and no additional compensation shall be allowed therefore. Construction Staking The Contractor’s attention is directed to Section 5-9.03 “Contractor Surveys – Construction Staking and Survey Monuments” of the Standard Construction Specifications. The Contractor shall be responsible for providing all necessary construction stakes and marks to establish the lines and grades for the construction and completion of the work, including but not limited to, control and base lines, offset lines, cut/fill grade stakes, and temporary survey stakes. The Contractor shall employ a person authorized to perform Land Surveying in the State of California to perform all necessary construction staking and survey work. All construction stakes and marks set by the Contractor’s Land Surveyor or Civil Engineer, shall be carefully preserved by the Contractor. In case such stakes and marks are destroyed or damaged, they shall be promptly replaced, at the direction of the City Engineer, at no additional cost to the City. Work performed under this bid item shall include as-built information for any storm water improvements (DI Invert and grate elevations and locations, flow line for laterals, alignment of lateral connections to manhole, etc.) that deviate from the Project Plans. The as built information shall be provided within 5 working days of completion of the survey, and the data shall be formatted to be imported in ArcGIS. The Contractor will be provided CAD files to assist the construction staking effort. The City will provide reference files containing project control lines, aerial photogrammetric mapping of existing facilities (without digital terrain model), and proposed roadway improvements only. CAD files for plan sheets, electrical facilities, planting, and survey control will not be provided. These electronic files will be provided to the contractor upon contractor request once notice to proceed has been given. Measurement and Payment Construction Staking shall be paid for by LUMP SUM Price and shall include full compensation for furnishing all labor materials, tools, equipment and incidentals for doing the work involved in establishing the lines and grades, as shown on the plans, as specified in the Standard Construction Specifications, State Standard Specifications and these special provisions, and as directed by the Engineer, and no additional compensation shall be allowed therefore. Remove Base and Surfacing Removal of base, asphalt concrete, concrete curb, gutter, and sidewalks shall conform to Section 39-3.05 “Remove Base & Surfacing” and Section 15-1.03B “Removing Concrete” of the State Specifications, Section 13-2.08 “Existing Facilities: Concrete” and Section 14-4, “Restoration of Surfaces: Concrete,” of the Standard Construction Specifications, these Special Provisions, and as directed by the City Engineer. The Contractor shall remove base, asphalt concrete, and concrete at the locations shown on the Project Plans. The quantities shown on the Project Plans assume that the Contractor will remove 2 feet of roadway along areas of new curb and gutter to provide for adequate working space. The Contractor shall not be paid for any area of removed roadway base and surfacing in excess of these 2 feet, unless otherwise directed by the City Engineer. The Contractor will only be paid for the removal of base and surfacing as shown on the Project Plans. The removal of base and surfacing in all other areas will be paid for through other various bid items. The Contractor shall protect existing concrete structures that are not shown for removal on the Project Plans. Any concrete structures damaged by the Contractors activities that are not shown to be removed on the Plans shall be repaired at the Contractor’s expense. The City Engineer may remove locations of work or specify additional project locations. Additional locations shall be paid for at the contract unit price of the appropriate bid items and no additional compensation will be allowed therefore. Should lawn sod removed during excavation operations not be suitable for replacement in its original location due to Contractor negligence, new sod shall be furnished and placed by the Contractor at his expense to the satisfaction of the City Engineer. The City Engineer shall determine if new sod shall be required. Yard drain pipes and sprinkler heads and lines located near the existing back of sidewalk shall be protected from damage. Sewer cleanouts located near the existing back of sidewalk shall also be protected from damage and remain free of debris. Any damage shall be repaired at the Contractor's expense to the satisfaction of the City Engineer. Measurement and Payment: The contract unit price paid per SQUARE FOOT of Remove Base & Surfacing shall include full compensation for furnishing all labor, materials, tools, equipment, incidentals, and for doing all work involved in removing base and surfacing including, but not limited to, sawcutting, excavation, disposal of excess materials, and protecting facilities and structures not shown for removal as specified in the Standard Construction Specifications, these Special Provisions, and as directed by the City Engineer and no additional compensation will be allowed therefore. Unsuitable Material Excavation & Backfill (Contingency) Unsuitable material excavation and backfill shall conform to the provisions in Section 18-5 of the Standard Construction Specifications and as specified in these Special Provisions. If the Contractor encounters unsuitable material in the subgrade, the material shall be removed as directed by the City Engineer. Backfill to replace unsuitable material removed shall be placed and compacted as specified in Section 18-5.02 of the Standard Construction Specifications. Suitable backfill material shall include the following: Roadway excavation material approved by the City Engineer. Class 2 Aggregate Base. Approved combination of A and B The selection of the proper backfill shall be at the discretion of the City Engineer. All backfill materials listed above shall be paid for under the Unsuitable Material Excavation & Backfill bid item. Measurement and Payment Unsuitable Material Excavation & Backfill shall be paid for on a per CUBIC YARD basis. Measurement will be based on the actual cubic yards of Unsuitable Material Excavation & Backfill removed as determined by the volume of excavated material. The contract unit price paid for shall include, but is not limited to, full compensation for furnishing all labor, tools, equipment, incidentals, and for doing all work involved in removal and disposal of excavated material, subgrade preparation, backfill, aggregate base, and compaction, and no additional compensation will be allowed thereof. The Contractor’s attention is directed to Section 8, “Measurement and Payment” of the Standard Construction Specifications. The estimated quantity for Unsuitable Material Excavation and Backfill is for bidding purposes only. The quantity may be extended, reduced or deleted at the discretion of the City Engineer, with no change in unit price. Class 2 Aggregate Base Aggregate base (AB) shall be Class 2 and shall conform to Section 22-2, “Aggregate Base,” of the Standard Construction Specifications, Section 26, “Aggregate Bases,” of the State Specifications, and these Special Provisions. Aggregate base shall be produced from commercial quality aggregate consisting of broken stone, crushed gravel, clean, rough-surfaced gravel and sand, or a combination thereof. The grading of the material shall be three-fourth inch (3/4”) maximum. Spreading and compacting shall be performed by methods that will produce a uniform base when firmly and properly compacted free from pockets of course or fine material. Curb, Gutter, and Sidewalk Ramp Class 2 aggregate base shall be placed conforming to Detail 4-30 of the Standard Drawings in the Standard Construction Specifications and as directed by the City Engineer. Class 2 aggregate base used in the construction of the curb, gutter, and sidewalks shall be paid for under the unit prices for the Concrete Sidewalk and Concrete Curb & Gutter bid items. Roadway Class 2 aggregate base shall be placed conforming to the callouts and details on the Plans, to the Standard Drawings in the Standard Construction Specifications, and as directed by the City Engineer. Class 2 aggregate base used in the construction of the Remove DI, DI (Type B), Remove & Replace with DI (Type B), Remove & Replace with DI (Type C), SDMH (48” Pre-Cast), SDMH (48” Cast-in-Place), 12” SD Pipe, and Remove & Replace with 12” SD Pipe shall be paid for under the unit prices for DI (Type B), Remove & Replace with DI (Type B), Remove & Replace with DI (Type C), SDMH (48” Pre-Cast), 12” SD Pipe, and Remove & Replace with 12” SD Pipe bid items. Measurement and Payment : There is no separate bid item for Class 2 aggregate base. Full compensation for aggregate base used for the construction of this project shall be included in the prices paid for the various contract items of work and no additional compensation shall be allowed therefore. Tree Root Con Source: OpenGov https://procurement.opengov.com/portal/cityofranchocordova/projects/322123 Canonical URL: https://govcontractfinder.com/contracts/lincoln-village-neighborhood-street-rehabilitation-project-p-opengov-3013-project-322123