Lompoc Valley Transportation Needs Study State and local opportunity open Santa Barbara County Association of Governments 2026-RFP-036 Posted: 2026-11-02T20:51:44.424Z Response deadline: 2026-12-05T01:00:00.000Z The Lompoc Valley Transportation Needs Study will comprehensively examine transportation conditions across the Lompoc Valley in west-central Santa Barbara County, an area that includes the City of Lompoc, the unincorporated communities of Mission Hills and Vandenberg Village, and Vandenberg Space Force Base (VSFB), and recommend improvements to the transportation network. The study area extends beyond the Valley itself along two state highways: SR 1 from US 101 to the City of Lompoc, a roughly 18-mile rural, largely two-lane corridor, and SR 246 from the City of Lompoc to Domingos Road. Within these limits, the study will focus on a number of locations with known safety, congestion, or circulation concerns, including the Santa Lucia Canyon Road/SR 1 intersection, San Antonio Road West at SR 1, the VSFB California Boulevard, Solvang, and South Base gates, Lompoc Gate, a connection from Central Avenue to SR 246, Harris Grade Road connecting the Valley to SR 135, and the West Ocean Avenue corridor, where VSFB gate locations are expected to change in the coming years. The study will also evaluate key bicycle, pedestrian, and transit connections, including routes serving Allan Hancock College, and will examine regional and interregional freight access, given the Valley's lack of a direct connection to US 101 and its substantial agricultural sector. The effort is multimodal in scope and will run from early 2027 through mid-2028, culminating in a planning study document identifying a suite of improvements. Scope of Work Overall Project Objectives The objective of the Lompoc Valley Transportation Needs Study is to identify the transportation improvements necessary to improve safety conditions and accommodate growth in the Valley. The study should be built upon analysis and public and stakeholder input, consider growth and changing travel patterns, and develop implementable recommendations to position the Valley for the future. The public process should be well-planned, meaningful, professionally executed, and account for approximately 30 percent of the project budget. The tasks listed below comprise the proposed scope of work. Offerors may propose modifications to the scope of work and, given their experience with similar projects, are encouraged to suggest additional tasks that would benefit the project. Essential Elements and Key Considerations: Areas of concern: While the public process and an existing conditions’ analysis will identify areas of concern for further analysis, several issues exist that must be addressed. The locations for each area of concern is shown on the attached study area map. 1.Traffic flow at VSFB gates, including options to improve circulation and reduce congestion, particularly where gate congestion blocks a roadway. Volume data for each gate will likely need to be collected in collaboration with VSFB. 2.Safety concerns at SR 1 and San Antonio Road West 3.A long-term solution for the SR 1 and Santa Lucia Canyon Road intersection, as well as speed and safety recommendations for Santa Lucia Canyon Road 4.Traffic flow patterns associated with changes to gate infrastructure and locations along Ocean Avenue west of Lompoc 5.Safety along SR 1 between Lompoc and US 101 at Las Cruces 6.Safety and capacity along SR 246 east of Lompoc 7.Long-term high-capacity access to the City of Lompoc from Central Avenue to SR 246 8.Long-term safety and capacity improvements to Harris Grade Road and Purisma Road. Project Timeline: It is anticipated that the project will take 18 months to complete, beginning in February 2027 and extending through August 2028. Flexibility should be provided in the event the project lasts beyond August 2028 due to the scheduling of meetings or other unforeseen circumstances. Budget: SBCAG has budgeted a maximum of $350,000 for the consultant aspect of this project. Task 1: Manage and Administer Project The offeror shall be responsible for overall management and administration of the project, including the following tasks: Prepare and monitor a project delivery schedule; update the schedule as needed; Prepare and submit invoices and progress reports to SBCAG; Provide internal quality control of data and deliverable; Schedule, coordinate, and facilitate meetings with the Project Advisory Committee (bi-weekly, as needed); Prepare meeting agendas, minutes, and related materials for Project Advisory Committee and Stakeholder Advisory Committee meetings; and Attend meetings as described above. Deliverables: Project delivery schedule with details for each task; Schedule updates (as needed); Invoices and progress reports; Meeting participation as described above; and Other project documentation as appropriate. Task 2: Existing Conditions The project team will collaborate to gather resources and prepare the existing conditions report. Sources of existing conditions are expected to come via project and stakeholder advisory committees, and initial public outreach. Data collection includes safety statistics and traffic counts, among others. The project team may need to work with Caltrans to gain encroachment permits to perform traffic counts. The existing conditions report will include a review of current facilities within the project corridor, including a broad description of roadway geometrics, sidewalks, bicycle facilities, transit stops, and mobility hubs, if applicable. The analysis will also review major planned developments within the project area, such as planned subdivisions and affordable housing projects, and identify relevant locations within nearby spheres of influence. In addition, the existing conditions analysis will document planned transportation improvements and planned economic development activity that may affect future corridor needs. Task 2 sub-tasks:Review Plans and Studies Review of previous plans and studies in the corridor. Initial Outreach Initial outreach to the public, stakeholders, and advisory committees to address issues and concerns in the study area. Data Collection Collect necessary data to perform traffic modeling, as needed. Deliverables: Draft Existing Conditions report Final Existing Conditions report Task 3: Analysis The Study will have three main focus areas of analysis, identified in separate subtasks below. Task 3 sub-tasks: Existing Conditions Analysis Using the data collected in Task 2, the project team, working with the project and stakeholder advisory committees, will analyze existing conditions and identify existing transportation issues and areas of concern within the corridor. Conduct Demographic Analysis This Study will incorporate economic and demographic forecasts in its planning strategies to consider the needs of present and future generations. Develop Policies and Strategies The Project Team will work with the project and stakeholder advisory committees to develop a list of policies and strategies (conceptual improvements) for transportation system improvements in the corridor, including considerations for active transportation and transit. The policies and strategies will be applied to the issues of the corridor to identify a list of improvements that fit the needs of the community. The policies and strategies will come from what was gathered during the existing conditions analysis and initial outreach. Deliverables: Demographic analysis Draft policies and strategies Task 4: Public Outreach Public outreach is a key component of the Study. The offeror shall implement the Public Engagement Plan described in the Public Process section of this RFP. Outreach shall use multiple methods tailored to the communities being reached and provide opportunities to engage populations and interests that may otherwise be underrepresented in the planning process. The public process will use multiple outreach methods to attract greater participation. These methods will be both in-person and virtual, including: online surveys or other input tools, flyers, a project website with space for public comments and feedback, virtual presentations, pop-up or tabling opportunities, targeted stakeholder interviews or small-group discussions, outreach through community-based organizations and project partners, and at least two phases of in-person presentations/workshops—one following the completion of the existing conditions task and the second when draft policies and strategies are completed. All outreach materials will be developed in both English and Spanish, and English-Spanish interpretation provided by qualified professional language interpreters will be available for all in-person and/or virtual presentations to the public. Translation shall be performed by qualified professional translators familiar with transportation terminology. The project team will conduct public outreach to gather input on the existing issues in the study area and to present the Study's recommended improvements. There will be three opportunities for public input during this Study, as follows: Task 4 sub-tasks: Phase 1 Public Outreach Initial Public Outreach will be conducted via multiple means, including web-based and in-person public workshops. Input received during the initial outreach will be included in and inform the Existing Conditions Report (Task 2). Stakeholder Engagement The project team will identify key stakeholders, community-based organizations and other groups in the study area and conduct targeted interviews, small-group discussions or other appropriate engagement activities. The project and ideas for improvements will be discussed. Phase 2 Public Outreach Following completion of draft strategies and policies, a second formal phase of the public process will be conducted. This phase will involve presenting draft strategies and policies and seeking feedback on both. In-person public workshops will be held, along with an update to the project website to offer a similar, though online, option for those unable to attend in person. Following the public process, the offeror will prepare a summary of the public outreach process and the feedback received. Distribution and Review of Draft Study The draft study will be distributed to stakeholders and those who have participated in the public process for review. In addition, the draft study will be made available for review and comment on the project website. The draft study will be presented to the SBCAG Board of Directors, Lompoc City Council, and other governing boards upon request. The subsequent sections provide detailed expansion of the task information summarized above, including specific requirements and expectations. Public Process: Public participation is a central component of the Study and should be integrated throughout the planning process. The process should provide clear and timely information, gather community experiences and priorities, and create meaningful opportunities for public and stakeholder input to inform the identification of transportation needs, development of potential solutions and refinement of study recommendations. Using an engagement spectrum adapted from the International Association for Public Participation (IAP2), the engagement approach should use a combination of Inform, Consult and Involve strategies, with opportunities for Co-Create where participants can meaningfully contribute to developing potential solutions. The process should clearly communicate what is open to public influence, how input will be considered and how participants will be informed of what was heard and what happens next. A project Public Engagement Plan shall be developed early in the Study in collaboration with the Project Advisory Committee, SBCAG project manager(s) and SBCAG’s Director of Government Affairs and Public Information. The Public Engagement Plan shall be consistent with applicable SBCAG Title VI requirements and should be informed by SBCAG’s draft Public Participation Plan. The plan shall identify intended audiences, including communities and populations that may be affected by the Study or underrepresented in traditional transportation planning processes; engagement objectives; outreach and participation methods; language and accessibility needs; roles and responsibilities; methods for documenting and evaluating participation; and how the project team will report back on what was heard and how public input informed the Study. The plan should consider the geographic, demographic, linguistic, socioeconomic and transportation-related characteristics of the study area and identify strategies for reaching audiences that may otherwise be missed. The public process shall include two rounds of in-person engagement, with more than one opportunity to participate during each round, such as events held on consecutive days or at different times or locations. Virtual or online participation shall also be available for those unable to attend in person. Engagement should not rely solely on formal public meetings. The engagement approach should include a mix of methods, such as pop-up or tabling opportunities, online surveys or other input tools, targeted stakeholder interviews or small-group discussions, and outreach through community-based organizations and project partners. The offeror should consider existing community events and other opportunities to reach people where they already gather, particularly disadvantaged and underserved comm Task 5: Advisory and Stakeholder Committee Meetings The offeror will organize bi-weekly, as needed, Project Advisory Committee meetings. These meetings are anticipated to be conducted online and be used to gather input, review work products, and guide the study’s progress. A Stakeholder Advisory Committee will be formed and appointed by the SBCAG Board. The offeror will schedule these meetings in collaboration with SBCAG, prepare meeting agendas, minutes, and materials. Four meetings are expected. Meetings are anticipated to be held in person within the study area, and the offeror shall include associated venue rental costs in its budget, although low- or no-cost meeting space may be available through project partners. The subsequent sections provide detailed expansion of the task information summarized above, including specific requirements and expectations. Stakeholder Advisory Committee (SAC): A Stakeholder Advisory Committee (SAC) will be formed and appointed by the SBCAG Board of Directors to provide ongoing input throughout the Study. The SAC will review key work products, share community and stakeholder perspectives, help identify transportation needs and issues, and provide input on potential policies, strategies and recommendations. The SAC will serve in an advisory capacity; final decision-making authority remains with the SBCAG Board of Directors. The offeror shall budget for four SAC meetings over the course of the Study and coordinate meeting timing with key project milestones. Meetings should be structured to provide meaningful opportunities for SAC members to review information, discuss issues and provide input before key study decisions and recommendations are finalized. The offeror shall coordinate with SBCAG staff to schedule and facilitate SAC meetings and shall prepare agendas, presentations, meeting materials, minutes and other materials necessary to support the committee's work. SAC meetings are anticipated to be held in person within the study area. The offeror shall include SAC meeting venue rental costs in its budget, although low- or no-cost meeting space may be available through project partners. Offeror participation should be in person unless otherwise approved by SBCAG. Meetings: The offeror shall include in its budget the staff time, preparation, travel and other costs necessary to participate in the following anticipated project meetings. Meeting schedules and participation will be coordinated with SBCAG project manager(s). The offeror shall be responsible for preparing agendas, minutes and other meeting materials for Stakeholder Advisory Committee and Project Advisory Committee meetings. For all other meetings, the offeror shall prepare presentations and supporting materials as needed in coordination with SBCAG staff. Project Advisory Committee: Biweekly meetings, as needed, throughout the Study. Meetings are anticipated to be held virtually. The offeror shall participate in meetings and provide technical information and materials as needed to support project coordination and review. Stakeholder Advisory Committee: Four meetings are anticipated during the Study. Offeror participation shall be in person unless otherwise approved by SBCAG. Meeting preparation, facilitation, materials and other responsibilities are described in the Stakeholder Advisory Committee section above. SBCAG Transportation Technical Advisory Committee (TTAC): Two meetings. Meeting participation may be held virtually. The offeror shall prepare and present project information and respond to questions and feedback. North County Subregional Planning Committee: Three meetings. Meetings are anticipated to be held in person. The offeror may coordinate with SBCAG on virtual participation options when appropriate. The offeror shall prepare and present project information and respond to questions and feedback. Lompoc City Council: Two meetings. Offeror participation shall be in person unless otherwise approved by SBCAG. The offeror shall prepare and present project information and respond to questions and feedback. SBCAG Board of Directors: One meeting to present the Draft Study and respond to questions and feedback. Offeror participation shall be in person unless otherwise approved by SBCAG. Deliverables: Agendas, minutes, meeting materials Task 6: Draft and Final Study Using prior work and considering stakeholder and public input, a draft study document will be prepared. The draft will document the study process, public outreach, how public input informed the study, and study recommendations, including high-level cost estimation. The draft will be presented to the SBCAG Board, Lompoc City Council, and other governing bodies if requested. The draft will also be provided for public review (Task 4). Upon completion of a draft review period, a final study will be prepared. Deliverables: Draft Study Final Study Task 7: Board Review/Approval The final will be considered for approval by the SBCAG Board. Once approved, the final Study will be distributed to project stakeholders, posted to the SBCAG website, and used to inform future planning and programming activities. Deliverables: Slide deck Introduction Summary Background Contact Information Timeline Proposal Submittal Information Proposal Submittal Offerors must submit Electronic Responses via the SBCAG e-Procurement Portal https://secure.procurenow.com/portal/SBCAG before 5:00 pm on the Friday, December 4, 2026 . Proposals shall be held in confidence and shall not be available for public review until the conclusion of the negotiation process. Thereafter, all proposals shall become public record. SBCAG reserves the right to retain all proposals submitted and use any idea in a proposal regardless of whether that proposal is selected. Proposals will not be returned. Submission of a proposal indicates acceptance by the offeror of the conditions contained in this request for proposal unless clearly and specifically noted in the proposal submitted and confirmed in the contract between SBCAG and the offeror selected. Submittal Questions, Addendum(s), Clarification and Revisions Offerors shall submit all inquiries regarding this bid via the SBCAG e-Procurement Portal located at https://secure.procurenow.com/portal/SBCAG. Please note the deadline for submitting questions. All answers to questions received by the deadline will be posted on the SBCAG e-Procurement Portal. Offerors may also click “Follow” on this RFP (bid) to receive an email notification when answers are posted. It is the responsibility of the offe Source: OpenGov https://procurement.opengov.com/portal/sbcag/projects/313168 Canonical URL: https://govcontractfinder.com/contracts/lompoc-valley-transportation-needs-study-opengov-805-project-313168