Lower Spring Branch Stormwater Improvements State and local opportunity open City of Clearwater 14-0048-EN Posted: 2026-09-30T13:00:00.999Z Response deadline: 2026-12-09T19:00:00.000Z Project consist of stormwater improvements to provide flood reduction with the replacement of bridges on Springtime Avenue and Overbrook Avenue and a double concrete box culvert on Douglas Avenue. The Contractor shall provide copies of a Current License/Registration with the state of Florida and Pinellas County (if applicable) in the bid response. The Contractor shall provide fixed project signs as described in Section III, Section 23 of the Contract Documents. The final number of project signs will be determined at the beginning of the project based on the Contractor's schedule of work submitted for approval. Additional project signs may be required at no additional cost to the city due to the Contractor's schedule of work. Contract Period: 548 Consecutive Calendar Days Lower Spring Branch Stormwater Improvements-Douglas Avenue Mobilization Work Zone, Traffic Control Sediment Barrier Floating Turbidity Barrier Clearing and Grubbing (Includes removal of guardrail, handrail, pavement, etc.) Removal of Existing Structures (Box Culverts, Endwalls, and Inlet Structures) Removal of Existing Concrete Regular Excavation Embankment Concrete Class IV, (Double 12' X 9' RCBC, Wingwalls, and Headwalls) Reinforcing Steel, Roadway Riprap, Sand-Cement Bags Riprap, Rubble, F&I, Ditch Lining Bedding Stone Utility Fittings, DI/CI F&I Elbow, 6" Ductile Iron Pipe (6" DIP for Potable Water Main Restoration) Utility Fixture, TEAM Valve, Furnish and Install, 6" Utility Fixture, Mechanical Joint Restraint, Furnish and Install, 6" Inlets, Curb, Type P-6, 10' (Pinellas County RC-4) Pipe Culvert, Optional Material, Round 18" S/CD Sheet Piling Steel (For Cofferdam) Subgrade - Type B Stabilization (12", LBR 40) Base - Optional Base (8", Base Group 06, Limerock LBR 100) Asphaltic Concrete (2", Type SP-12.5) Milling of Existing Asphalt Pavement Pipe Handrail - Guiderail, Aluminum Bullet Rail, Double Rail Concrete Curb and Gutter, Type F Shoulder Concrete Barrier Wall, Curb and Gutter Barrier Concrete Sidewalk (6' Width, 4" Thick) Fencing, Wood Fence, 5.1-6.0' Fencing, Vinyl Fence, 5.1-6.0' Fence Gate, Wood, Single, 6.1-12.0' Opening Single Column Ground Sign Assembly, F&I Ground Mount, Less Than 12 SF Thermoplastic, Standard, Yellow, Solid 6" Thermoplastic, Standard, White, Skip 6" Raised Pavement Marker, Type B (Without Final Surface Markings) Object Marker, Type 3 Tree Barricades Root Pruning Lower Spring Branch Stormwater Improvements Contingency- Douglas Avenue This contingency is solely for the pricing table for Douglas Ave. Owners Contingency-10% of the above total for Douglas Avenue Lower Spring Branch Stormwater Improvements-Springtime Avenue Mobilization Work Zone Traffic Control Sediment Barrier Floating Turbidity Barrier Clearing and Grubbing (Includes removal of guardrail, handrail, pavement, etc.) Removal of Existing Structures/Bridges (Bridge Span, Endwalls, and Inlet Structures) Regular Excavation Embankment Concrete Class IV, Substructure (Concrete Cap and Footers) Reinforcing Steel, Roadway Riprap, Rubble, F&I, Ditch Lining Bedding Stone Utility Structure, Below Ground, Adjust/Modify (Includes bypass pumping) Gravity Sewer Pipe (8" DIP for Sanitary Sewer Restoration) Ductile Iron Pipe (6" DIP for Potable Water Main Restoration) Utility Fittings, DI/CI F&I Elbow, 6" Utility Fixture, Mechanical Joint Restraint, Furnish and Install, 6" Utility Fixture, TEAM Valve, Furnish and Install, 6" Sheet Piling Steel (For Cofferdam) Sheet Piling Steel, F&I Permanent Pipe Culvert, Optional Material, Round 18" S/CD Inlets, Curb, Type P-6, 10' (City of Clearwater, Wing Inlet) Conspan Series O326 Bridge 26' X 8.5' Arch (Includes Installation and Headwalls/Wingwalls) Pipe Handrail - Guiderail, Aluminum Fencing, Vinyl Fence, 0.0-5.0' Fencing, Wood Fence, 5.1-6.0' Base - Optional Base (8", Base Group 06, Limerock LBR 100) Subgrade - Type B Stabilization (9", LBR 40) Asphaltic Concrete (2", Type SP-12.5) Concrete Curb and Gutter, Type F Concrete Sidewalk (4' Width, 4" Thick) Milling of Existing Asphalt Pavement American Muscle Docks and Fabrication Lift Ladder (Five step, 4" step width) Traffic Rail Texas Classic - Type T411 Standard (Mod.) Tree Removal Performance Turf, Sod Tree Barricades Root Pruning Tree Mitigation Lower Spring Branch Stormwater Improvements Contingency-Springtime Avenue This contingency is solely for the pricing table for Springtime Ave. Owners Contingency-10% of the above total for Springtime Avenue Lower Spring Branch Stormwater Improvements-Overbrook Avenue Mobilization Work Zone Traffic Control Sediment Barrier Floating Turbidity Barrier Clearing and Grubbing (Includes removal of guardrail, handrail, pavement, etc.) Removal of Existing Structures/Bridges (Bridge Span, Endwalls, and Inlet Structures) Regular Excavation Embankment Concrete Class IV, Substructure (Concrete Footers) Reinforcing Steel, Roadway Riprap, Rubble, F&I, Ditch Lining Bedding Stone Ductile Iron Pipe (6" DIP for Potable Water Main Restoration) Utility Fixture, VAC/AIR Assembly, Furnish and Install, 2" (Air Release Valve) Utility Fittings, DI/CI F&I Elbow, 6" Utility Fixture, Mechanical Joint Restraint, Furnish and Install, 6" Utility Fixture, TEAM Valve, Furnish and Install, 6" Sheet Piling Steel (for Cofferdam) Pipe Culvert, Optional Material, Round 18" S/CD Inlets, Curb, Type P-6, 10' (City of Clearwater, Wing Inlet) Conspan Series O224 Bridge - 24' X 11' Arch (Includes Installation and Headwalls/Wingwalls) Pipe Handrail - Guiderail, Aluminum Concrete Sidewalk (5' Width, 4" Thick) Base - Optional Base (8", Base Group 06, Limerock LBR 100) Subgrade - Type B Stabilization (9", LBR 40) Asphaltic Concrete (2", Type SP-12.5) Concrete Curb and Gutter, Type F Milling of Existing Asphalt Pavement Traffic Rail Texas Classic - Type T411 Standard (Mod.) Tree Removal Performance Turf, Sod Tree Barricades Root Pruning Tree Mitigation Lower Spring Branch Stormwater Improvements Contingency- Overbrook Avenue This contingency is solely for the pricing table for Overbrook Ave. Owners Contingency-10% of the above total for Overbrook Avenue SUPPLEMENTAL TECHNICAL SPECIFICATIONS - Section IVA Supplemental Technical Specifications See Attachment A-Lower Spring Branch Stormwater Improvements-Bid Phase Supplemental Technical Specifications INSTRUCTIONS TO BIDDERS SECTION II INSTRUCTIONS TO BIDDERS 1. COPIES OF BIDDING DOCUMENTS 1.1. Bid Documents, any attachments and addenda are available for download at: https://procurement.opengov.com/portal/myclearwater/projects/304326 . Bidding Documents may include, but are not limited to, plans, specifications, bond forms, contract form, affidavits, bid/proposal form, and addendums. 1.2. Complete sets of Bidding Documents must be used in preparing bids. Neither the City nor the Engineer shall be liable for errors or misinterpretations resulting from the use of incomplete sets of Bidding Documents, by Bidders, sub-bidders, or others. 2. QUALIFICATION OF BIDDERS 2. 1 Each prospective Bidder must pre-qualify to demonstrate, to the complete satisfaction of the City of Clearwater, that the Bidder has the necessary facilities, equipment, ability, financial resources and experience to perform the work in a satisfactory manner. An application package for pre-qualification may be obtained by contacting the City of Clearwater, Engineering Division by phone at (727) 562-4750. Pre-qualification requirement information is also available on the City of Clearwater Website at address: www.myclearwater.com/government/city-departments/engineering/construction-management . Contractors wanting to pre-qualify to bid on a project as a General Contractor must do so two weeks (ten workdays) prior to the bid opening date. Bidders currently pre-qualified by the City do not have to make reapplication. It is the Contractor’s responsibility to confirm pre-qualification status before a Bid Opening. The Contractor shall include copies of their current license/registration with the State of Florida and Pinellas County (if applicable) with their bid response. 3. EXAMINATION OF CONTRACT DOCUMENTS AND SITE 3.1.It is the responsibility of each Bidder, before submitting a Bid, to (a) examine the Contract Documents thoroughly; (b) visit the site to become familiar with local conditions that may in any manner affect cost, progress, performance or furnishing of the work; (c) consider and abide by all applicable federal, state and local laws, ordinances, rules and regulations; and (d) study and carefully correlate Bidder's observations with the Contract Documents, and notify Engineer in writing of all conflicts, errors or discrepancies in the Contract Documents. 3.2.For the purposes of bidding or construction, bidder may rely upon the accuracy of the technical data contained in reports of explorations and tests of subsurface conditions at the site which have been utilized by the Engineer in the preparation of the Contract Documents, but not upon non‑technical data, interpretations or opinions contained therein or for the completeness thereof. Drawings relating to physical conditions of existing surface and subsurface conditions (except Underground Facilities) which are at or contiguous to the site and which have been utilized by the Engineer in preparation of the Contract Documents, may be relied upon by Bidder for accuracy of the technical data contained in such drawings but not upon the completeness thereof for the purposes of bidding or construction. 3.3.Information and data reflected in the Contract Documents with respect to Underground Facilities at or contiguous to the site are based upon information and data furnished to the City and Engineer by owners of such Underground Facilities or others, and the City does not assume responsibility for the accuracy or completeness thereof unless expressly provided in the Contract Documents. 3.4.Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders on subsurface conditions, Underground Facilities, other physical conditions, possible conditions, and possible changes in the Contract Documents due to differing conditions appear in the General Conditions. 3.5. Before submitting a Bid, each Bidder shall, at Bidder's own expense, make or obtain any additional examinations, investigations, explorations, tests and studies and obtain any additional information and data which pertain to the physical conditions (surface, subsurface and Underground Facilities) at or contiguous to the site or otherwise which may affect cost, progress, performance or furnishing the work in accordance with the time, price and other terms and conditions of the Contract Documents. 3.6. On request in advance, City will provide each Bidder access to the site to conduct such explorations and tests at Bidder's own expense as each Bidder deems necessary for submission of a Bid. Bidder shall fill all holes and clean up and restore the site to its former condition upon completion of such explorations and tests. 3.7. The lands upon which the Work is to be performed, rights-of-way and easements for access thereto and other lands designated for use by the Contractor in performing the Work are identified in the Contract Documents. All additional lands and access thereto required for temporary construction facilities or storage of materials and equipment are to be provided by the Contractor. Easements for permanent structures or permanent changes in existing structures are to be obtained and paid for by the City unless otherwise provided in the Contract Documents. 3.8. The submission of a Bid will constitute an unequivocal representation by the Bidder that the Bidder has complied with every requirement of these Instructions to Bidders and that, without exception, the Bid is premised upon performing and furnishing the Work required by the Contract Documents by such means, methods, techniques, sequences or procedures of construction as may be indicated in or required by the Contract Documents, and that the Contract Documents are sufficient in scope and detail to indicate and convey understanding of all terms and conditions of performance and furnishing of the work. 4. INTERPRETATIONS AND ADDENDA 4.1. All questions as to the meaning or intent of the Contract Documents are to be directed in writing to the Engineer. Interpretations or clar GENERAL CONDITIONS Section III - General Conditions can be found on the City's website at: https://www.myclearwater.com/Business-Development/Doing-Business-with-the-City/Engineering-Construction-Bid-Information/Contract-Specifications TECHNICAL SPECIFICATIONS SCOPE OF WORK Project Name: Lower Spring Branch Stormwater Improvements Project Number: 14-0048-EN Scope of Work: Project consist of stormwater improvements to provide flood reduction with the replacement of bridges on Springtime Avenue and Overbrook Avenue and a double concrete box culvert on Douglas Avenue. The Contractor shall provide copies of a Current License/Registration with the state of Florida and Pinellas County (if applicable) in the bid response. The Contractor shall provide fixed project signs as described in Section III, Section 23 of the Contract Documents. The final number of project signs will be determined at the beginning of the project based on the Contractor's schedule of work submitted for approval. Additional project signs may be required at no additional cost to the city due to the Contractor's schedule of work. Contract Period: 548 Consecutive Calendar Days Section IV - Technical Specifications Section IV - Technical Specifications can be found on the City's website at: https://www.myclearwater.com/Business-Development/Doing-Business-with-the-City/Engineering-Construction-Bid-Information/Contract-Specifications Section V - Contract Documents Section V - Contract Documents can be found on the City's website at: https://www.myclearwater.com/Business-Development/Doing-Business-with-the-City/Engineering-Construction-Bid-Information/Contract-Specifications PRICING SHEET It is the City of Clearwater's intent to award one bidder for all three locations. SUBMITTAL REQUIREMENTS Source: OpenGov https://procurement.opengov.com/portal/myclearwater/projects/304326 Canonical URL: https://govcontractfinder.com/contracts/lower-spring-branch-stormwater-improvements-opengov-172-project-304326