Maintenance Facility Painting Project State and local opportunity open Greater Dayton Regional Transit Authority GD 26-53 Posted: 2026-10-16T12:00:23.274Z Response deadline: 2026-12-01T16:00:00.000Z The Greater Dayton Regional Transit Authority (RTA) is soliciting Bids for Maintenance Facility Painting Project . The successful bidder shall provide all labor, supervision, materials, equipment, tools, transportation, permits, and incidentals necessary to prepare and paint designated RTA facilities and structures. SCOPE OF WORK Scope of Work 1.0 PROJECT INFORMATION A. Provide all labor, supervision, materials, equipment, tools, transportation, permits, and incidentals necessary to prepare and paint designated RTA facilities and structures. The Work shall improve facility appearance, protect surfaces from deterioration, and extend the service life of Authority assets. B. Related Documents 1 . Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections per RTA Requirements, apply to this Section. C. Summary 1. Work Includes: a. Interior and exterior painting. b. Surface preparation. c. Protective coatings. d. Utility pipe identification painting. e. Protection of existing facilities and equipment. f. Cleanup and closeout requirements. g. Coordination with active transit operations. 2. Project Locations a. 600 Longworth Street, Dayton, Ohio 45402 b. 601 Longworth Street, Dayton, Ohio 45402 c. 901 Ludlow Street, Dayton, Ohio 45402 Refer to contract drawings for areas included in the Work. 3. Field Verification a. Contractor shall verify all dimensions, quantities, and existing conditions. Measurements shown on drawings are for reference only. It shall be the responsibility of the Contractor to field verify all measurements and conditions prior to bidding. b. Each facility shall be made available for inspection during the pre-bid walkthrough and thereafter by appointment through the RTA Project Manager. c. Attendance at the pre-bid walkthrough is strongly encouraged. D. Project Manager Julie Hoffman Director of Capital Management Greater Dayton Regional Transit Authority Phone: (937) 425-8362 Email: jhoffman@greaterdaytonrta.org E. Contractor Qualifications 1 . Contractor shall have a minimum of five (5) years of documented experience performing commercial and industrial painting and coating work of similar size, complexity, and operational constraints. 2 . RTA prefers the Contractor to have successfully completed a minimum of five (5) comparable projects within the last five (5) years involving occupied commercial, industrial, transportation, maintenance, or municipal facilities. Project Reference Sheet provided in Bid Requirements under requirement 24. All comparable projects must be uploaded in this section accordingly and include the following: 3 . Contractor shall provide project references including: a. Project name and location. b. Owner contact information. c. Contract value. d. Description of work performed. e. Date of completion. 4 . Personnel performing coating work shall be trained and experienced in industrial surface preparation and application of commercial coating systems. 2.0 PAYMENT PROCEDURES, INFORMATIONAL SUBMITTALS, RFIs, AND PROJECT MEETINGS A. Section includes administrative and procedural requirements for: 1 . Preparation and submission of the Schedule of Values. 2 . Applications for Payment. 3 . Informational Submittals. 4 . Requests for Information (RFIs). 5 . Project Meetings. B. Related Requirements 1 . Section 012600 "Contract Modification Procedures" for administrative procedures governing changes to the Contract. 2 . Section 017700 "Closeout Procedures" for administrative requirements related to Substantial Completion and Final Payment. C. Definitions 1 . Schedule of Values (SOV): A statement prepared by the Contractor allocating portions of the Contract Sum to various portions of the Work and used as the basis for reviewing Applications for Payment. 2 . Request for Information (RFI): A written request submitted by the Contractor seeking clarification, interpretation, or additional information regarding the Contract Documents. D. Schedule Of Values 1 . Coordinate preparation of the Schedule of Values with the Contractor's Construction Schedule. 2 . Coordinate Schedule of Values line items with activities identified in the Construction Schedule. 3 . Submit the Schedule of Values to the RTA Project Manager no later than seven (7) days prior to submission of the initial Application for Payment. 4 . Where the Work is phased, provide separate Schedule of Values breakdowns for each phase of the Work. 5 . Format and Content a. Use the following list as a guide for establishing Schedule of Values line items. i. Interior Areas 1. Mechanical Rooms 2. Maintenance Bays 3. Vehicle Storage Areas 4. Shop Ceilings 5. Structural Steel 6. Storage Rooms 7. Utility and Industrial Components 8. Exposed Piping ii. Exterior Areas 1. Bollards 2. Exterior Doors and Frames 3. Exterior Louvers b. Provide at least one line item for each applicable Specification Section. c. Arrange the Schedule of Values in a format consistent with AIA Document G703 or an approved equivalent. d. Include the following information for each line item: i. Related Specification Section or Division. ii. Description of Work. iii. Applicable Change Order Numbers. iv. Dollar Value of Work. 6 . Provide separate identification of: a. Labor b. Materials c. Equipment 7 . Provide a breakdown of the Contract Sum in sufficient detail to facilitate review of Applications for Payment and progress reports. 8. Include separate line items for materials or equipment purchased and stored but not yet installed. a. Differentiate between materials stored on-site and materials stored off-site. 9 . Include all applicable overhead and profit costs proportionately distributed throughout the Schedule of Values. 10 . Revise the Schedule of Values whenever Contract Modifications, Change Orders, or Construction Change Directives alter the Contract Sum. E. Applications For Payment 1 . Applications for Payment following the initial Application shall be consistent with previously approved applications and payments. 2 . Submit Applications for Payment monthly unless otherwise approved by RTA. a. Payment Application Schedule i. The payment period shall extend from the first day through the last day of each month. ii. First submit a “Pencil Copy” to the Project Manager for review before (5) Contract Terms 1. Contract Pricing This is a fixed price contract. All prices offered and accepted are firm for the duration of the contract. Contractors may not change or negotiate contract prices. Except as provided in this contract, no special fees or expenses shall be charged directly to the RTA. 2. Contract Duration The duration or term of this contract shall be for until final receipt after project completion. RTA reserves the right to award this contract to one or more contractors. The Greater Dayton Regional Transit Authority may extend the term of this contract by written notice to the Contractor within 30 days, provided that the RTA shall give the Contractor a preliminary written notice of its intent to extend at least 60 days before the contract expires. The preliminary notice does not commit the RTA to an extension. 3. Quantity and Delivery Requirements There is no set quantity nor delivery schedule for this contract. Goods and/or services shall be provided as required by RTA. Awarded vendors responsible for meeting all requirements for the awarded items over the contract period. No guarantee is made or implied as to the minimum quantities that may be ordered for the duration of the contract. Letter to Bidders RELEASE DATE: Friday, October 16, 2026 DEAR PROSPECTIVE BIDDER: Re: Construction Initiation for Bid (CIFB) Maintenance Facility Painting Project CIFB No. GD 26-53 The Greater Dayton Regional Transit Authority (RTA) is soliciting bids for Maintenance Facility Painting Project . Your firm is invited to submit a bid. A pre-bid conference has been scheduled for Tuesday, November 3, 2026 at 9:00 am at 901 Ludlow Street, Dayton, Ohio 45402, Training Conference Room . Please make arrangements to attend. You may email clarification questions to the undersigned prior to the pre-bid conference. Public Bid Opening: Greater Dayton RTA will be hosting a public bid opening for this project at 4 S Main Street., Dayton, OH 45402. Bids will be opened on Tuesday, December 1, 2026 at 11:00 am . Attendance is not required, but if you plan on attending, please arrive at least ten minutes prior to the time of the bid opening. Bids are required to be submitted via OpenGov and paper or emailed bids will not be accepted. All bids and related documents shall be subject to a financial assistance contract between the RTA and the United States Department of Transportation under the Urban Mass Transportation Administration Act of 1964, as amended, terms and conditions established under the Act will apply. All bidders will be required to certify they are not on the U.S. Comptroller General's Consolidated list of ineligible contractors. Manufacturers appearing on said list will be considered ineligible. In accordance with the drawings and specifications on file at the Greater Dayton Regional Transit Authority (RTA). Pursuant to Section 153.54 et seq. of the Ohio Revised Code, the bidder shall submit a Bid Guaranty in the form of either: A bond for the full amount of the bid conditioned that if the bid is accepted, the bidder after the awarding or the recommendation for awarding the contract, will enter into a proper contract based upon the bid; or A certified check, cashier's check, or letter of credit pursuant to Chapter 1305, Ohio Revised Code, in the amount of 10 percent of the base bid amount. If a 10% GUARANTY is submitted, provided that the bid is accepted, the bidder will, after the awarding or recommendation for awarding the contract, enter into a proper contract and indemnify the RTA against all damages suffered by failure to perform the contract by supplying a performance bond in accordance with Section 153.54(2) et. seq. of the Ohio Revised Code for the full amount of the bid. RTA hereby notifies all bidders that, in regard to any contract entered into pursuant to this procurement, advertisement or solicitation, disadvantaged business enterprises will be afforded full opportunity to submit bids in response and will not be subjected to discrimination on the basis of race, color, sex or national origin in consideration for an award. DBE Participation: It is the policy of the Department of Transportation (DOT) that DBEs, as defined in 49 CFR, parts 23 and 26, shall have the maximum opportunity to participate in the performance of contracts financed in whole or in part with federal funds under this Agreement. The DBE goal for this procurement is 0 %, RTA welcomes DBE participation. Please Note: This procurement package and any addenda are available on OpenGov, https://procurement.opengov.com/portal/greaterdaytonrta . In order to ensure that you receive all updates and addenda, please be sure to follow this project on OpenGov. Should you have any questions or comments concerning the procurement, please submit through the Q&A Section of the posting on OpenGov prior to the due date and time for questions. The award for this procurement is based on the lowest responsive and responsible bidder as determined by Greater Dayton RTA. Should you have any questions or comments concerning the procurement, please submit through the Q&A Section of the posting on OpenGov prior to the due date and time for Questions/Inquiries. Sincerely, Michelle Collier Senior Purchasing Agent Instructions to Bidders Greater Dayton RTA Background History RTA is an independent political subdivision of the State of Ohio organized pursuant to Ohio Revised Code Section 306.30 through 306.71, inclusive, as amended. The RTA was created on September 6, 1971, pursuant to the Revised Code, by ordinances of the Councils of the City of Dayton and the City of Oakwood. After completing the purchase of the assets of City Transit, the major privately owned public transportation system in the area, the RTA became operational on November 5, 1972. In September 1980, after the approval in the preceding April by the voters of the County of a one-half percent sales and use tax of unlimited duration for all purposes of the RTA, the boundaries of the RTA were extended to be co extensive with the boundaries of Montgomery County and parts of Greene County. Governing Body All power and authority of the RTA is vested in and exercised by its nine (9) member Board of Trustees. Bid Submission Instructions The Greater Dayton Regional Transit Authority, hereinafter called "RTA", requests bids for Maintenance Facility Painting Project , hereinafter called "above-named project" or by the specific project name, under the following requirements and conditions, which shall be considered an essential part of the contract documents. 1. Submission and Modification Submissions are due electronically by 11:00 am , Dayton (Eastern) time on Tuesday, December 1, 2026 , through OpenGov. Any submission received after the exact date and time specified will not be considered. Submissions may be modified online through OpenGov prior to the due date and time by unsubmitting a bid or proposal and making modifications and then re-submitting. In addition, any costs incurred while preparing a bid or proposal submission, including site visits, will not be reimbursed by RTA. If Bonding requirements are being met via a certified check made out to "Greater Dayton Regional Transit Authority", please mail the certified check to 4 S Main Street, Dayton, OH 45402. 2. Requests for Clarification All requests for clarifications or changes must be submitted through the Q&A Section of the project on OpenGov prior to the stated due time and date. Any new or relevant information given to any one contractor will be furnished to all contractors as addenda to this procurement. 3. Administration of Sealed Bids Sealed bids shall be submitted through the appropriate project in the official Greater Dayton RTA OpenGov site prior to the advertised due date and time. At which time the bids will be publicly opened at 4 S Main St., Dayton, OH 45402 in the 8th floor conference room. Any bid received after the time referred to will not be considered. Any bid received and opened may not be withdrawn by the bidder for sixty (60) days from the date on which the bids were opened. Because bids and offers can at times be ambiguous, the RTA reserves the right to request additional information before making an award. The RTA also reserves the right to seek clarification from any bidder or offeror about any statement in its bid or proposal that the RTA finds ambiguous. The RTA reserves the right, as the interests of the RTA may require, to postpone, accept or reject all bids and to waive defects or irregularities in bids received and to award a contract(s) in the best interest of the RTA. In determining the successful bidder, consideration will be given to the price, the experience of the bidder, responsibility of the bidder including financial responsibility, responsiveness to these specifications, and the bidder's record as an equal opportunity employer. All bids submitted are subject to instructions and general conditions, and any special conditions and specifications contained herein, all of which are made a part of this bid by reference and constitute the contract documents and shall become a part of any agreement and/or purchase order between the RTA and the successful bidder. 4. Contract Award Contract awards are based on the lowest responsive and responsible bidder as determined by the Greater Dayton Regional Transit Authority (RTA). The RTA reserves the right, as the interests of the RTA may require, to postpone, accept or reject all bids and to waive defects or irregularities in the bids received. In awarding a contract(s), the RTA reserves the right to consider all elements entering the determination of the responsibility of the bidder. Any bid which is incomplete, conditional, obscure, or which contains additions not called for or irregularities of any kind, may be cause for rejection of the bid. Contract(s) for the purchase of goods and/or services will be awarded within ninety (90) calendar days from the date upon which bids were opened to the lowest bidder the RTA deems responsive and responsible. The successful bidder will be required to execute the attached contract within five (5) calendar days after notification of award. In the event a single bid is received, the RTA will conduct a price and/or cost analysis of the bid. Price analysis is the process of examining and evaluating a price submitted without examining in detail the separate cost elements and the profit included in the cost bid. It should be recognized that a price analysis through comparison to other similar procurements must be based on an established or competitive price of the elements used in the comparison. The comparison must be made to a purchase of similar quantities and involving similar specifications. Where a difference exists, a detailed analysis must be made of this difference and costs associated thereto. RTA has the right to enter into a negotiated procurement should only a single bid be received. Where it is impossible to obtain a valid price analysis, it may be necessary for the RTA to conduct a cost analysis of the bid price. 5. Funding The proposed contract shall be funded in part from the Federal Transit Administration (FTA) and the Ohio Department of Transportation (ODOT). Each vendor shall examine all contract documents noting particularly all requirements, which will affect the contractor's work. 6. Specified Material and "Approved Equals" Contractors shall furnish with their submission, as an integral part thereof, complete descriptions and specifications of the product they propose to furnish. When the descriptions and specifications of the product meet the description and specifications provided in the solicitation document, no additional submission is required. Where brand names or specific items or processes are used in the specifications, consider the term "or approved equal" to follow. However, a request for approval for any proposed substitution as an equal must be submitted in writing. For all items listed and which are described or defined by dimensions or another measure of physical characteristics or performance, it is understood that such information indicates the character of the required items and so strict interpretations with resp Terms & Conditions The Greater Dayton RTA's General Terms and Conditions and Construction Terms and Conditions are attached to this solicitation as Attachments B and C respectively. FTA Required Clauses - Construction No Federal Government Obligation to Third Parties The RTA and Contractor acknowledge and agree that, notwithstanding any concurrence by the Federal Government in or approval of the solicitation of this Contract, absent the express written consent by the Federal Government, the Federal Government is not a party to this Contract and shall not be subject to any obligations or liabilities to the RTA, Contractor or any other party (whether or not a party to that Contract) pertaining to any matter resulting from the Contract. Contractor shall include the above clause in each subcontract financed in whole or in part with Federal assistance provided by the FTA. It is further agreed that the clause shall not be modified, except to identify the subcontractor who will be subject to its provisions. Incorporation of FTA Terms The preceding provisions include, in part, certain Standard Terms and Conditions required by the U.S. Department of Transportation (DOT), whether or not expressly set forth in the preceding contract provisions. All contractual provisions required by DOT, as set forth in FTA Circular 4220.1F, and are hereby incorporated by reference. Anything to the con Source: OpenGov https://procurement.opengov.com/portal/greaterdaytonrta/projects/309862 Canonical URL: https://govcontractfinder.com/contracts/maintenance-facility-painting-project-opengov-4742-project-309862