Malibu Canyon - Las Virgenes Road Pipeline and Pump Station Conceptual Engineering Feasibility and Fatal Flaw Analysis Study State and local opportunity open Las Virgenes Municipal Water District, CA 2026-RFP-051 Posted: 2026-11-04T23:03:57.801Z Response deadline: 2026-12-04T23:00:00.000Z The Las Virgenes Municipal Water District is seeking Proposals for Malibu Canyon - Las Virgenes Road Pipeline and Pump Station Conceptual Engineering Feasibility and Fatal Flaw Analysis Study . Proposals are to be submitted through the Procurement Portal at https://procurement.opengov.com/portal/lvmwd , no later than 3:00 pm on Friday, December 4, 2026 . SCOPE OF SERVICES A general outline of the scope of work is provided below. It is the District’s expectation that the proposer uses their expertise to customize the scope of work below, as appropriate, to meet the project objectives in a cost-effective manner. The District does not own any AutoCAD drawings for this area and the selected proposer is expected to use available TIFF/PDF files as the basis of their study. Proposers may identify additional tasks as needed to meet the project objectives or may offer optional tasks as appropriate. Task 1 – Project Initiation and Existing Conditions Conduct a kickoff meeting with District staff. Review available District studies, maps, hydraulic models, record drawings, geotechnical information, utility information, property information, and other relevant documents. Establish preliminary design criteria, flow requirements, hydraulic conditions, and points of connection. Identify information and data gaps requiring additional investigation. Coordinate with applicable agencies, utilities, and stakeholders as necessary to confirm key feasibility assumptions. Establish “fatal flaw” methodology and screening criteria. Task 2 – Alignment and Fatal Flaw Analysis Evaluate potential pipeline alignments from PCH through Malibu Canyon Road and Las Virgenes Road, as well as other reasonable alternatives identified by the Consultant. The evaluation shall consider: Available right-of-way and roadway width. Pipeline diameter and hydraulic requirements (16” – 54” range). Topography and existing infrastructure. Constructability and access. Utility conflicts. Required utility separation. Environmental constraints. Property and easement requirements. Pump station locations. Traffic and roadway impacts. Construction staging. Permitting requirements. Schedule and cost. The Consultant shall identify and document fatal flaws, major constraints, and significant unresolved risks for each alignment or alternative presented. Task 3 – Geotechnical and Constructability Analysis Conduct a desktop evaluation of available geological and geotechnical information, with particular emphasis on anticipated hard-rock conditions along the Malibu Canyon corridor. Evaluate the feasibility and relative applicability of construction methods, including both conventional open-cut construction as well as trenchless methods (including but not limited to horizontal directional drilling, micro tunneling, jack-and-bore, and other appropriate methods). The evaluation shall consider anticipated excavation difficulty, rock conditions, slope stability, groundwater, staging, access, spoil removal, construction duration, environmental impacts, roadway impacts, contractor availability, risk, and cost. The Consultant shall identify locations where specific construction methods may be required and whether geotechnical conditions could constitute a fatal flaw. Task 4 – Utility and DDW Separation Analysis Identify existing utilities within the potential pipeline corridors and evaluate potential conflicts with the proposed pipeline. The analysis shall include a preliminary utility screening of the potential alignments, including: The presence of water, sewer, storm drain, gas, electrical, telecommunications, and other known utilities. Required horizontal and vertical separation. Applicable California Division of Drinking Water (DDW) requirements. Anticipated major utility crossings and parallel installations. Potential utility relocations, replacements, protection, or bypass needs. Potential impacts of utility relocation on cost and schedule. The Consultant shall determine whether the pipeline can reasonably be constructed while maintaining required utility separations within the available corridor and identify conflicts that could constitute a fatal flaw. Task 5 – Traffic, Roadway, and Construction Staging Evaluate the impacts of pipeline construction on Malibu Canyon Road, PCH, and other affected roadways. The evaluation shall include a planning-level analysis of roadway and traffic considerations for each proposed alignment, including: Whether construction can occur while maintaining traffic. Whether partial or full roadway closures would be required. Potential duration and location of necessary closures. Traffic control and detour requirements. Emergency access requirements. Construction access and staging limitations. Impacts associated with pipe delivery, excavation, equipment, and spoil removal. Potential nighttime, weekend, phased, or trenchless construction approaches. The Consultant shall identify roadway and traffic conditions that could constitute a fatal flaw. Task 6 – Pump Stations, Property, and Electrical Power Evaluate the approximate number, location, size, and overall feasibility of pump stations required to meet the hydraulic requirements of the pipeline. The evaluation shall include: Hydraulic requirements and pumping head. Potential pump station locations. Site size and access requirements. Property ownership and acquisition requirements. Permanent and temporary easements. Environmental and neighborhood constraints. Operational and maintenance requirements. Electrical service requirements. Availability and capacity of Southern California Edison (SCE) power. Potential electrical infrastructure upgrades. Preliminary energy consumption and operating costs. SCADA communication between facilities. The Consultant shall coordinate with SCE, as appropriate, to determine whether adequate electrical service can reasonably be provided at potential pump station locations. Task 7 – Environmental, Permitting, and Other Project Constraints Identify major environmental constraints and anticipated permits and approvals, including, as applicable: CEQA. California Coastal Commission. Caltrans. Regional Water Quality Control Board. California Department of Fish and Wildlife. U.S. Army Corps of Engineers. City of Malibu and Los Angeles County. Biological, cultural, archaeological, and tribal cultural resources. Watercourses, wetlands, habitat, trees, and other sensitive resources. The Consultant shall also identify other planned or ongoing projects that could affect the pipeline's alignment, construction, schedule, or cost, including, at a minimum, Rindge Dam removal and SCE undergrounding projects. Task 8 – Hydraulic Analysis and Conceptual Engineering Perform conceptual hydraulic analysis sufficient to establish: Pipeline diameter alternatives and hydraulic requirements (anticipated 16” to 54” diameter range) based on the information available. Design flows. Approximate hydraulic grade line and anticipated pressures. Pumping requirements. Number and approximate location and sizing of pump stations. Surge and operational considerations. Potential connection requirements. Task 9 – Cost, Schedule, and Risk Analysis Prepare planning-level estimates of: Capital costs. Operations and maintenance costs. Energy costs. Utility relocation costs. Pump station costs. Traffic control and roadway restoration costs. Environmental/permitting costs. Property and easement costs. Engineering and construction management. Appropriate contingencies. Develop a conceptual project schedule addressing design, environmental review, permitting, property acquisition, utility relocation, SCE coordination, procurement, and construction. Identify major cost and schedule risks and their potential impacts. Task 10 – Final Conceptual Engineering Feasibility and Fatal Flaw Analysis Report Prepare a conceptural engineering report documenting the study findings. The report shall include, at a minimum: Executive summary. Existing conditions. Design criteria and assumptions. Alignment alternatives. Hydraulic analysis. Geotechnical and constructability evaluation. Utility and DDW separation analysis. Traffic and roadway analysis. Pump station, property, and electrical evaluation. Environmental and permitting constraints. Other project conflicts. Capital, O&M, and energy cost estimates. Conceptual schedule (construction durations). Risk assessment. Fatal Flaw Matrix. Conclusions and recommended next steps. The Fatal Flaw Matrix shall identify, for each alternative, whether significant issues are: No identified fatal flaw; A significant constraint requiring mitigation; A major unresolved risk; A potential fatal flaw; or A condition that makes the alternative not reasonably feasible. The Consultant shall clearly identify alternatives that should be eliminated, alternatives requiring additional investigation, and alternatives that appear sufficiently feasible to warrant further project development. For alternatives that remain feasible following the fatal flaw analysis, prepare conceptual engineering exhibits showing the proposed alignment, major facilities, pump stations, major crossings, trenchless sections, utility conflicts, and other significant features. PROJECT OBJECTIVE AND CONSULTANT APPROACH The District expects the Consultant to approach this assignment as an independent due-diligence and feasibility investigation, rather than as an effort to advance a predetermined project. The study shall place particular emphasis on determining whether the combination of hard-rock construction, constrained roadway conditions, traffic impacts, utility conflicts and DDW separation requirements, potential utility relocations, pump station siting, SCE power availability, property acquisition, environmental permitting, conflicts with other major projects, construction schedule, energy consumption, and project cost creates conditions that make the project impractical. If the Consultant determines that the proposed pipeline is not reasonably feasible, the report shall clearly document the technical basis for that conclusion and identify any alternative alignment, construction method, or conveyance approach that may warrant further consideration. DELIVERABLES The Consultant shall provide, at a minimum: Project Work Plan and Schedule. Existing Conditions/Data Gap Memorandum. Preliminary Alignment and Alternative Exhibits. Hydraulic and Conceptual Engineering Analysis. Geotechnical/Constructability Evaluation. Utility and DDW Separation Analysis. Traffic and Roadway Impact Evaluation. Pump Station, Property, and SCE Power Feasibility Evaluation. Environmental and Permitting Constraints Evaluation. Capital, O&M, and Energy Cost Estimates. Project Schedule and Risk Register. Fatal Flaw Matrix. Draft Conceptual Engineering Feasibility and Fatal Flaw Analysis Report. Final Conceptual Engineering Feasibility and Fatal Flaw Analysis Report. Presentation of findings to District staff and/or Board, as requested. OPTIONAL SERVICES The Consultant shall identify optional services that may be required to resolve significant data gaps or potential fatal flaws identified during the study. These may include, but are not limited to the following: Geotechnical borings and rock coring. Utility potholing/subsurface utility engineering. Topographic or boundary survey. Detailed traffic analysis. Environmental field surveys. Property appraisals. Additional hydraulic modeling. Detailed SCE engineering studies. Additional alignment or alternative analysis. The Consultant shall identify the purpose, estimated cost, and decision that would be supported by each optional service. INTRODUCTION General Information The Las Virgenes Municipal Water District (District) serves the western edge of Los Angeles County including the cities of Agoura Hills, Calabasas, Hidden Hills and Westlake Village. The District occupies 122 square miles and services a population of approximately 70,000. The District provides potable water, recycled water, and sanitation (wastewater) services to its customers through three separate enterprise funds. The sanitation and recycled water services are provided through a Joint Powers Authority with the Triunfo Sanitation District. Las Virgenes Municipal Water District is organized under the Municipal Water District Act of 1911 (California Water Code 7100). A five-member board of directors, each elected by geographic divisions, provides governance. Directors serve overlapping four-year terms, and every two years - concurrent with installation of the newly elected board – they select board officers. The board also selects a local representative from LVMWD to serve on the Board of Directors of the Metropolitan Water District of Southern California. The District is requesting proposals from qualified firms to provide a Conceptual Engineering Feasibility and Fatal Flaw Analysis Study to determine whether the proposed pipeline is technically feasible, constructible, permittable, and reasonably achievable from a property, schedule, operational, and cost perspective. . To be considered, the proposal must be received electronically, through the Procurement Portal by 3:00 pm on Friday, December 4, 2026 . Proposals received after the above date and time will not be considered. Submitters will receive an email confirmation of receipt of the proposal. The District is not responsible for emails that fail to deliver regardless of the cause of the failure. Email confirmations will be sent when proposals are received. Background The Las Virgenes Municipal Water District (District) is considering the development of a treated water transmission pipeline connecting the Pacific Coast Highway (PCH) area to the District's service area at Agoura Rd. via Malibu Canyon - Las Virgenes Road. The pipeline could potentially support future conveyance of treated ocean desalination water and/or provide an interconnection with Los Angeles County Waterworks District 29. The purpose of this assignment is to prepare a Technical Feasibility, Conceptual Engineering and Fatal Flaw Analysis Study to determine whether the proposed pipeline is technically feasible, constructible, permittable, and reasonably achievable from a property, schedule, operational, and cost perspective. Construction of the pipeline and the supporting infrastructure is expected to be particularly challenging. Hard bedrock is expected at shallow depths throughout the canyon, the roadway is relatively narrow, and the road is heavily travelled. A primary objective of the study is to conduct a comprehensive fatal flaw analysis. The Consultant shall objectively identify conditions that could prevent or substantially impair construction or operation of the project and shall not assume that the project is viable. The study shall provide the District with sufficient information to assist in determining whether the project should proceed to additional design and project development phases. Proposal Timeline Release Project Date: November 4, 2026 Pre-Proposal Meeting (Non-Mandatory): November 18, 2026, 10:00am Virtual via teams, email smathews@lvmwd.gov to RSVP Question Submission Deadline: November 25, 2026, 5:00pm Proposal Submission Deadline: December 4, 2026, 3:00pm ADDITIONAL CONDITIONS Minimum Consultant Qualifications Consultant shall provide information to verify the following minimum qualifications: Design and construction engineering experience related to the proposed project, with a value of at least $200,000. Professional liability insurance in the amount of $1 million. Project manager shall have sufficient experience in the assessment, design, and construction of similar projects, with a minimum of 5 years’ experience. Project manager must be a registered Professional Engineer in the State of California with established experience related to the proposed project. PROPOSAL REQUIREMENTS General Requirements Inquiries Inquiries concerning the request for proposals must be received through the Procurement Portal by 5:00 pm on Wednesday, November 25, 2026 . Answers to questions received will be posted through the Procurement Portal. It is the proposer’s responsibility to ensure that they access and review any questions and answers posted. The District is not responsible to notify individual potential bidders of the availability of questions and answers beyond this notice. CONTACT WITH PERSONNEL OF THE DISTRICT OTHER THAN ABOVE REGARDING THIS REQUEST FOR PROPOSALS MAY BE GROUNDS FOR ELIMINATION FROM THE SELECTION PROCESS. Addenda – The District may post addenda to the RFP, through the Procurement Portal. It is the potential proposer’s responsibility to access any addenda and ensure that stated requirements are met. Submission of Proposals The following material is required to be received by 3:00 pm , Friday, December 4, 2026 for a proposing firm to be considered: Title Page Title page showing the request for proposals' subject; the firm's name; the name, address and telephone number of a contact person; and the date of the proposal. Table of Contents Transmittal Letter A signed letter of transmittal briefly stating the proposer's understanding of the work to be done, the commitment to perform the work within the time period, a statement why the firm believes itself to be best qualified to perform the engagement and a statement that the proposal is a firm and irrevocable offer for 90 days. Key Personnel Describe the staffing model your firm will use to fulfill the Scope of Work. Provide resumes of all key personnel who will be assigned to the District. Any changes to the key personnel must be approved by the District prior to award. References List a minimum of three (3) references for whom comparable services were provided. Provide current contact information including names, email, and direct phone as well as a brief summary of the project, including costs and key results achieved. Qualifications and Experience Describe your firm’s qualifications to complete this Scope of Work. Explain why your firm is the best to deliver this Scope of Work and provide examples of your firm’s work. Detailed proposal The detailed proposal should follow the order in Section II – Scope of Services and should provide sufficient detail to understand how the scope will be accomplished. Legal Issues and Potential Conflicts of Interest The proposal must provide any pending investigations of the firm and any enforcement, settlement, or disciplinary actions taken within the last five years against the firm or any proposed key personnel and any known potential conflicts of interest related to this engagement. Costs Costs proposals must include a “Not to Exceed” amount for each item in SCOPE OF SERVICES section as well as a breakdown of hourly rates by position that will be assigned to the District. Any cost not explicitly proposed will be ineligible for payment. Each proposal shall be limited to no more than 25 pages, excluding resumes. The cover page, divider pages, and estimated hours and fee will be excluded from the total page count. Each page of text and/or figures will count as a page; blank pages used for layout spacing purposes will not be included in the total page count. Figures or graphics on 11x17 paper will be allowed and will count as 1 page. EVALUATION PROCEDURES Review of Proposals Proposals submitted will be evaluated by key District personnel. The District reserves the right to retain all proposals submitted and use any idea in a proposal regardless of whether that proposal is selected. Oral Presentation During the evaluation process, the District may, at its sole discretion, request any one, all, or no firms to make oral presentations. Such presentations will provide firms with an opportunity to answer any questions the District may have on a firm's proposal. Not all firms may be asked to make such oral presentations Source: OpenGov https://procurement.opengov.com/portal/lvmwd/projects/306162 Canonical URL: https://govcontractfinder.com/contracts/malibu-canyon-las-virgenes-road-pipeline-and-pump-station-co-opengov-14773001-project-306162