Master Planning, Design, and Construction Support Services for the West Sacramento Fire Training Facility State and local opportunity open City of West Sacramento 26-073-RFP Posted: 2026-11-13T22:57:52.241Z Response deadline: 2027-01-08T22:00:00.000Z STATEMENT OF PURPOSE The City of West Sacramento is soliciting proposals from qualified firms or individuals ("Proposer") to provide design services for the West Sacramento Fire Training Facility. More details on the City's needs for this work are provided in the Scope of Work . Each qualified Proposer is to submit a proposal in conformity with the terms of this Request for Proposal ("RFP") by the deadline below ("Proposal"). The Proposer selected by the City pursuant to the terms of this RFP and the City's contracting procedures, if any is selected, is referred to herein as "Contractor." SYNONYMOUS TERMS Unless the use indicates otherwise, as used throughout this bid and its attachments, the following terms are synonymous: a. Firm, Consultant, Supplier, Vendor, Contractor, Successful Bidder, Offeror b. Purchase Order, Contract, Agreement c. Services, Work, Scope, and Project d. Pricing proposal/sheet, Cost proposal/sheet, Rate table/sheet Scope of Work Scope of Work The City of West Sacramento ("City") is soliciting proposals from qualified architectural and engineering consulting firms to provide comprehensive professional services for the planning, environmental review, design, permitting, bidding, and construction support of a new Fire Training Facility located on City-owned property within the Port of West Sacramento. The project has two primary objectives. First, the Consultant shall develop a comprehensive master plan for the long-term development of the Fire Training Campus, establishing a vision for future expansion, site circulation, utilities, training facilities, and supporting infrastructure. The master plan shall identify a phased approach to future development while ensuring that initial improvements do not preclude or negatively impact future expansion opportunities. Second, the Consultant shall design and prepare complete construction documents for Phase 1 of the project. Phase 1 is anticipated to include the construction of a new permanent training building and associated site improvements, together with all supporting utilities, environmental documentation, permitting, bidding assistance, and construction administration services necessary to deliver the project through construction. The existing site currently contains two operational fire training burn structures consisting of a multi-story burn tower and a single-story burn building. A former modular classroom building previously serving the facility has been demolished. The City's vision is to transform the site into a permanent, modern fire training campus that supports current operational needs while providing flexibility for future growth and evolving training requirements. The selected Consultant shall provide all professional services necessary to successfully complete both the master planning effort and the design and implementation of Phase 1 improvements. All Phase 1 improvements shall be designed to be compatible with, and supportive of, the long-term Fire Training Campus Master Plan. Task 1 - Project Management, Coordination, and QA/QC The Consultant shall provide overall project management and coordination throughout the duration of the project, including but not limited to: Project kickoff meeting. Development and maintenance of project schedule. Biweekly design coordination meetings during active design, unless otherwise approved by the City. Coordination with City staff, the Fire Department, the Port of West Sacramento, utility providers, regulatory agencies, and other stakeholders. Monthly progress reports and project status updates. Quality Assurance / Quality Control (QA/QC) The Consultant shall implement and maintain a documented Quality Assurance/Quality Control (QA/QC) program throughout the duration of the project to ensure that all deliverables are complete, coordinated, accurate, and internally consistent prior to submission to the City. The Consultant shall identify, in its proposal, the individual responsible for overseeing the QA/QC program. The identified QA/QC Manager shall be independent of the day-to-day production of the work to the maximum extent practicable and shall be responsible for verifying that all required quality reviews have been completed prior to each design submittal. The Consultant shall prepare and maintain a QA/QC Matrix identifying the required quality reviews to be performed at each design milestone, including, at a minimum: Conceptual Design 30% Design 60% Design 90% Design 100% Construction Documents The QA/QC Matrix shall identify: Required interdisciplinary coordination reviews between architectural, civil, structural, mechanical, electrical, plumbing, fire protection, and other applicable disciplines. Constructability reviews. Code compliance reviews. Specification and drawing coordination reviews. Cost estimate reconciliation with the current design. Completion of internal quality reviews prior to each submittal to the City. The individual(s) responsible for completing each review. The Consultant shall certify that each design submittal has undergone the required QA/QC review prior to submission to the City. Task 2 - Existing Conditions Evaluation The Consultant shall perform all necessary investigations to evaluate existing site conditions, including: Site reconnaissance. Topographic and boundary survey sufficient to support project design. Research and evaluation of existing site infrastructure and available utility records. Coordinate and provide all geotechnical engineering services and investigations necessary to support project design. Verification of existing site constraints and opportunities. Evaluate existing water, sewer, storm drainage, electrical, gas, and communication utilities serving the site. Determine the capacity of existing utilities to support the proposed facility and anticipated future buildout identified in the site master plan. Identify any required utility upgrades or extensions. Verify existing utility locations, depths, sizes, points of connection, and other characteristics necessary to support design, including field verification or subsurface investigation where necessary. Identification of permitting requirements. The Consultant shall initiate coordination with applicable utility providers during the Existing Conditions Evaluation to identify available capacity, service requirements, anticipated utility improvements, and potential schedule or cost impacts prior to advancement of the Phase 1 design. Task 3 – Programming, Master Planning, and Conceptual Design Working closely with City staff and the Fire Department, the Consultant shall develop a programming document identifying project requirements and operational needs. 3.1 Programming The programming effort shall include, at a minimum: Space needs assessment. Operational workflow. Building layout alternatives. Site circulation. Vehicle access. Apparatus movements. Future expansion opportunities. 3.2 Programming Workshop The Consultant Term of Contract The initial term of the Contract is at the City's discretion and may be up to 3 years. The City also reserves the right to extend the Contract for up to 2 additional 1-year terms (individually, “Extension”) upon the same terms and conditions as parties agreed to in the Contract. Thus, parties agree the Contract may be for a total of 5 years upon the same terms and conditions as parties agreed in the Contract. Notwithstanding the foregoing, the City is not obligated to extend the Contract for any amount of time. If there is outstanding work within the Scope of Work at the end of the term of the Contract and the City requires time to solicit for and secure an alternative contractor, Contractor shall continue to provide the services within the Scope of Work on a month-to-month basis, not to exceed six (6) months, at the same cost, terms, and conditions in effect at the termination of the Contract. The City shall give Contractor at least thirty (30) days written notice of such a need and the anticipated timeline to secure an alternative contractor. Introduction Summary Please state the Statement of Purpose of this Solicitation, being as descriptive as possible. Background Contact Information Timeline Proposal Requirements Proposal Format & Content Proposer Questionnaire must include each of the following sections to be uploaded in the Proposer Questionnaire section. Proposal Transmittal Letter Proposer's Mandatory Qualifications and Experience Technical Project Approach Cost Proposal Specific content and format requirements for each section are detailed below. Each section shall be uploaded in the Proposer Questionnaire section of this RFP. Proposal Transmittal Letter A Proposer is required to provide a written transmittal letter and offer in the form of a standard business letter ("Proposal Transmittal Letter" or "Letter"). The Proposal Transmittal Letter shall reference and respond to the following subsections in sequence and have attached to it corresponding documentation, as required. A Proposal Transmittal Letter is mandatory and failure to provide the required information may result in the proposal being considered nonresponsive and rejected. Proposer's Name and Contact. The Letter shall state the complete name, or business name, of the Proposer making the Proposal. The Letter shall state the name, title, mailing address, email address, and telephone number of the person the City should contact regarding the Proposal. Statement of Offer. The Letter shall state that the Proposal is an offer to complete the Scope of Work and the offer, including the Cost Proposal rates and budget, remains valid for at least ninety (90) business days after the Proposal due date. Conflict of Interest. The Letter shall state whether the Proposer, or any individual who shall perform work under the Contract, has a possible conflict of interest and, if so, the nature of that conflict. The City reserves the right to terminate the Contract if its execution would or could create, or give the appearance of creating, a conflict of interest. The City, at its sole discretion, shall make all determinations on the existence or appearance of a conflict of interest. City Contract Terms. The Letter shall include a statement of acknowledgement that the City’s standard contract and insurance (Included in Attachments ) have been reviewed and accepted by the Proposer with or without qualification. If the Proposer has qualifications, the Proposer shall download a copy of the standard contract and re-upload a version of the document in the Proposer Questionnaire under Standard City Contract Qualifications identifying the contract language at issue and Proposer's suggested adjustment or modification. If no qualifications are identified, Proposer is presumed to have accepted the City' standard contract and be capable of completing the Scope of Work, as well as all reasonably associated managerial tasks, without reservation or qualification. Subcontractors. The Letter shall state whether the Proposer intends to use subcontractors, subconsultants, or other contracting parties to complete the Scope of Work (collectively, "Subcontractors"). If so, the Letter shall clearly identify the name of each proposed Subcontractor, their mailing address, email address, and telephone number as well as the service related to the Scope of Work that the Subcontractor is anticipated to perform. NOTE: The Contractor must obtain written approval from the City prior to the use of any Subcontractor, even after a Contract is executed. Signature and Authority. The Letter shall be signed by a person empowered to bind the Proposer to the provisions of the RFP, and any contract awarded pursuant to it. Evidence demonstrating authority to bind the Proposer shall be included or attached to the Letter, such as a statement describing the signatory's role with or relationship to the Proposer. Proposer's Mandatory Qualifications and Experience A Proposal shall demonstrate that the Proposer holds the qualifications and experience required to complete the Scope of Work by referencing and responding to the following subsections in sequence and attaching corresponding documentation, as required ("Mandatory Qualifications and Experience"). The qualifications and experience listed below are mandatory and failure to provide the required information may result in the proposal being considered nonresponsive and rejected. Organization. A brief description of Proposer's background, years in business, organizational history, and client base. Briefly state Proposer's total number of employees and list all relevant licenses, specialties, and trainings held by Proposer and/or employees. List office location(s) and identify the office(s) from which services will be performed. Experience. A brief statement of how long Proposer has been performing the services required to complete the Scope of Work. Proposer shall have a minimum of five (5) years of experience providing the services required to complete the Scope of Work to public agencies in California. If the Proposer has been in business for less than five years, the experience of its principals may be used to meet this requirement. Public Agency Experience. A description of no more than ten (10) public sector projects completed within the last five (5) years that demonstrates Proposer's experience performing services to complete the Scope of Work, including a statement as to whether Proposer has experience working for the City of West Sacramento, or a public agency similar in size to the City. Note key personnel involved in each project and if they are proposed for this Proposal and if applicable, differentiate which work was performed by subcontractor. List any contractual relationships with the City existing now or within the past five (5) years. Personnel. A narrative description, resume, and organizational structure chart of personnel to be assigned to complete tasks within the Scope of Work, clearly indicating where Subcontractors will be used, if applicable. The narrative description or resume shall list, at least, each individual’s title, education, relevant experience and duration, professional licenses, and demonstrated accomplishments. Identify the individual who will lead the day-to-day work effort and serve as the primary contact to the City. References. A list of five (5) references for whom the services required to complete the Scope of Work have been performed by Proposer within the last three (3) years. The list of references shall include name, mailing address, email address, brief description of services completed relevant to this RFP, and point of contact who can attest to the quality and effectiveness of the services. Local Benefit. A statement describing any and all local benefit the Proposer would bring to the Contract. For example, local benefit may include but is not limited to local vendors, suppliers, labor or subcontractors used in support of the project as well as fees or taxes paid to the City. To the extent practical, the local benefit described with the Proposal should be measurable. At the end of the Contract, the Contractor shall be required to provide a report detailing the measures taken to enhance the local benefit and whether or not stated goals were met. For purposes of this section, a local vendor or service provider is one located within the City limits and in possession of a West Sacramento business license. If the solicitation has Federal funds, there will be no Local Benefit considered. History. A statement as to whether there have been any mergers, acquisitions, or sales related to Proposer's organizational structure within the last three (3) years. If so, attach an explanation providing relevant details. Legal Challenges .A statement as to whether there is any pending litigation against the Proposer. If such litigation exists, attach an opinion of counsel as to whether the pending litigation will impair the Proposer's ability to perform the Contract. Fiscal Viability . A statement as to whether, in the last ten (10) years, the Proposer has filed (or had filed against it) any bankruptcy or insolvency proceeding, whether voluntary or involuntary, or undergone the appointment of a receiver, trustee, or assignee for the benefit of creditors. If so, attach an explanation providing relevant details. Business License. Registration with the Secretary of State to conduct business in the State of California. Attach a copy of a proof of registration. Technical Project Approach A document detailing the operational and/or organizational approach the Proposer will take to timely fulfill the Scope of Work shall be submitted with the Proposal ("Technical Project Approach"). The Technical Project Approach shall be a comprehensive narrative describing how the Proposer will complete the Scope of Work, communicate with the City throughout the work, advance the project objectives, and provide continuity on work efforts. Cost Proposal A document detailing all costs associated to complete the Scope of Work shall be submitted with the Proposal ("Cost Proposal"). For sealed bids, the Cost Proposal shall be opened after and separately from the rest of the Proposal. Cost Proposal shall include all applicable federal, state, and local taxes and must be all-inclusive of project expenses, as no additional charges shall be allowed, except for additional services as requested by the City, if any. There shall be no additional reimbursement for travel time or expenses, telephone costs, copying costs, etc. If applicable, the Cost Proposal shall separately delineate costs for optional term extensions and/or optional services. Proposer agrees to maintain pricing pursuant to the Cost Proposal for the duration of the Contract, and any optional extensions. General Information Proposal Submission All Proposals, including any attachments, exhibits, or amendments, shall be submitted through the City's E-Procurement Portal, which will deliver Proposals to the City of West Sacramento staff overseeing the solicitation. Proposals not submitted through the City's E-Procurement Portal shall be deemed nonresponsive and rejected. Proposals may not be delivered orally, by paper, by email, by facsimile transmission, or by any other means. All proposals shall be submitted through the City’s e-Procurement Portal no later than: Friday, January 8, 2027 at 2:00 pm . A Proposer shall respond to the RFP and any exhibits, attachments, or amendments. A Proposer's failure to submit a Proposal in compliance with the procedures and timelines set forth in the RFP shall cause the Proposal to be deemed nonresponsive and rejected. A late Proposal shall not be accepted. Additional time to respond shall not be granted to any Proposer. Questions and/or Objections It is to the City and Proposer's benefit that questions and objections are brought to the City's attention so it may issue necessary amendments to the RFP and help prevent the opening of defective proposals upon which the City could not award a Contract. Proposer should carefully review this RFP and all attachments for comments, questions, defects, objections, or any other matter requiring clarification or correction (collectively, “Questions”). A Proposer may submit Questions related to this RFP to the City through the City’s e-Procurement Portal at or before: Monday, January 4, 2027 at 5:00 pm . Questions shall be considered waived and invalid if not brought to the attention of the City in conformity with this subsection. Questions not submitted through the City's e-Procurement Portal will not be accepted or responded to. Questions submitted after the deadline will not be accepted or responded to. Questions and answers will be posted on the City's e-Procurement Portal and visible to all. Any revisions to the Standard Contract should be in the Proposal Transmission Letter and shown in redline, as described above Source: OpenGov https://procurement.opengov.com/portal/cityofwestsacramento/projects/288213 Canonical URL: https://govcontractfinder.com/contracts/master-planning-design-and-construction-support-services-for-opengov-279-project-288213