Myrtle Grove Fire Station 11 - Pre-Engineered Metal Building System State and local opportunity open Escambia County PD 26-27.010 Posted: 2026-11-03T19:14:49.207Z Response deadline: 2026-12-03T16:00:00.000Z The Escambia County Board of County Commissioners ("County") invites sealed bids from qualified and properly licensed vendors for furnishing all labor, materials, equipment, engineering, fabrication, delivery, erection, supervision, coordination, and incidental work necessary to provide a complete Pre-Engineered Metal Building (PEMB) System for the new Myrtle Grove Fire Station 11, in accordance with the Contract Documents. The Work generally consists of providing a complete, engineered PEMB structural system for the new Myrtle Grove Fire Station, including, but not limited to: Primary structural framing and portal frames (utilize straight frames, not tapered); Secondary framing; Roof purlins; Standing seam metal roof panel system; Wall girts; Metal wall panels for brick back-up; Fascia panels; Soffit panels; Ceiling liner panels; Anchors and connection bolts; Bracing; Vinyl backed insulation; Miscellaneous structural components associated with the PEMB system; Engineering; Shop drawings; Fabrication; Delivery; and Erection. The PEMB shall be fully coordinated with the architectural, structural, mechanical, electrical, plumbing, fire protection, and other requirements indicated in the Contract Documents. The County intends to award the Work to the lowest responsive and responsible bidder whose bid complies with the requirements of the solicitation and is determined to be in the best interest of Escambia County. Myrtle Grove Fire Station 11 - Pre-Engineered Metal Building System Base Bid 10% Owner's Contingency Scope of Work Scope of Work The Base Bid shall include all labor, materials, engineering, fabrication, delivery, erection, equipment, supervision, temporary work, coordination, and incidental items necessary to provide the complete Pre-Engineered Metal Building (PEMB) system described by the Contract Documents. The Bidder shall carefully review the entire Construction Document set. No additional compensation will be allowed for work reasonably inferable from the Contract Documents or necessary to provide a complete and code-compliant PEMB system. The Work shall include, but is not necessarily limited to, the following: Delegated Engineering by Contractor or Manufacturer's Engineer of Record (EOR) Provide complete structural engineering and delegated design of the PEMB system by Contractor's or Manufacturer's EOR. Contractor or Manufacturer's EOR must be a Professional Engineer currently licensed in the State of Florida. Engineering shall include, at minimum: Primary rigid frames; Columns; Rafters; Secondary framing; Purlins; Girts; Eave struts; Bracing; Flange bracing; Portal frames where required; Rod, cable, or other approved bracing systems; Framed openings; Roof framing; Wall framing associated with the PEMB; Connections; Base plates; Anchor-bolt requirements; Equipment support framing where indicated; Canopies and miscellaneous PEMB-supported elements where indicated; Load paths; Structural reactions; and Other components necessary to provide a complete structural system. Engineering calculations and shop drawings shall be signed and sealed by the Florida-licensed Professional Engineer responsible for the PEMB design. Design Criteria The PEMB shall be designed in accordance with the currently adopted Florida Building Code and all applicable referenced standards, codes, and regulations identified in the Contract Documents. The facility is an essential public-safety facility. The PEMB manufacturer and Contractor shall carefully review the structural design criteria established by the Engineer of Record, including applicable: Risk Category; Ultimate design wind speed; Exposure category; Internal pressure coefficient; Components and cladding pressures; Roof live loads; Dead loads; Collateral loads; Rain loads; Seismic criteria; Deflection criteria; and Other environmental or structural loads. The PEMB supplier shall not assume design criteria based solely upon its standard building system. The Contract Documents and Engineer of Record's structural criteria shall govern . Where conflicts exist, the more stringent requirement shall apply unless otherwise directed in writing by the Engineer of Record. Primary Structural Frames Provide all rigid frames, columns, rafters, moment-frame components, connections, stiffeners, plates, bolts, and associated components required for the complete structural system. Column locations shall conform to the Construction Documents. Interior columns shall not be relocated into apparatus circulation areas, apparatus parking areas, operational spaces, or other locations without prior written approval. Where indicated by the Construction Documents, columns shall be located outboard or otherwise configured to maintain required clearances within the apparatus bays. Secondary Framing Provide all required: Purlins; Girts; Eave struts; Bridging; Sag rods; Flange braces; Framed openings; Supplemental members; Blocking; and Secondary structural components. Secondary framing shall be coordinated with all architectural finishes and building systems. Building Bracing Provide a complete lateral bracing system. Bracing locations shall be coordinated with the architectural plans and shall not interfere with: Doors; Windows; Apparatus-bay doors; Mechanical equipment; Ductwork; Electrical equipment; Plumbing systems; Fire-protection systems; Interior partitions; Casework; Ceiling systems; Access paths; or Required operational clearances. Bracing shall not be relocated into architecturally or operationally sensitive locations without approval of the Architect and Structural Engineer of Record. Framed Openings Provide structural framing necessary for all openings indicated in the Construction Documents, including openings associated with:• Apparatus-bay doors; Apparatus-bay doors, including (2) jamb tubes and (1) head tube for each of the three four-fold doors, in addition to 8” girt jambs and head per details; Personnel doors; Windows; Louvers; Mechanical penetrations; Exhaust systems; Intake systems; Equipment; Architectural features; and Other building-system penetrations. Special attention shall be given to framing and clearances required for the apparatus-bay door systems. Roof System Coordination The PEMB framing shall accommodate the roof system indicated in the Contract Documents. The PEMB supplier shall coordinate roof slopes, ridges, eaves, valleys, drainage conditions, gutters, downspouts, penetrations, curbs, equipment supports, insulation assemblies, and architectural roof conditions. No rooftop mechanical equipment shall be introduced unless specifically shown or authorized by the Contract Documents. Exterior Wall Coordination The building incorporates architectural exterior materials independent of or supplemental to the PEMB structural system. The PEMB supplier shall coordinate structural framing and attachment requirements for exterior assemblies indicated by the Construction Documents, including brick veneer and associated backup/support systems. Provide supplemental framing, girts, clips, connections, and other components specifically assigned to the PEMB scope by the Contract Documents. The PEMB manufacturer shall account for applicable loads imposed by exterior wall assemblies upon the PEMB structure. Apparatus Bays The PEMB system shall maintain all required clear dimensions within the apparatus bays. Structural members, bracing, connections, bolts, girts, or other components shall not encroach upon required: Apparatus parking clearances; Vehicle circulation; Door operatin PEMB Manufacturer Qualifications The proposed PEMB manufacturer shall: Have a minimum of ten (10) years documented experience manufacturing comparable pre-engineered metal building systems; Regularly manufacture buildings of comparable size, complexity, wind exposure, and occupancy; Maintain an established engineering department or retain qualified structural engineers experienced in PEMB design; Be capable of providing signed and sealed engineering documents by a Florida-licensed Professional Engineer; Demonstrate successful experience with high-wind or hurricane-region construction; and Maintain recognized industry quality-control certification appropriate to the work. The County reserves the right to request documentation demonstrating compliance with these requirements. Contractor Qualifications The Bidder shall be properly licensed to perform the Work in the State of Florida and Escambia County at the time required by applicable law and the Contract Documents. The Bidder shall demonstrate experience successfully completing comparable PEMB projects. Upon request, the Bidder shall provide: Contractor license information; Minimum of three comparable project references; Proposed PEMB manufacturer; Proposed erection subcontractor; Proposed delegated structural engineer; Evidence of insurance; Bonding capacity; and Other information reasonably requested by the County. Project Schedule The successful Contractor shall coordinate its engineering, shop drawings, fabrication, delivery, and erection activities with the overall construction schedule. Within [10] calendar days following Notice of Award or as otherwise directed, the Contractor shall provide a detailed PEMB schedule identifying, at minimum: Engineering commencement; Initial shop-drawing submission; Review period; Resubmittal period; Release for fabrication; Fabrication duration; Anchor-bolt/template delivery; Material delivery; Erection commencement; and Erection completion. The Bidder shall identify with its Bid the anticipated number of calendar days required from approved shop drawings to delivery of the structural system. Anticipated PEMB Lead Time: 90 Calendar Days Schedule of Values Within three (3) business days following notification that the Bidder is the apparent lowest responsive and responsible Bidder, the Bidder shall provide a detailed Schedule of Values if requested by the County. At minimum, the Schedule of Values shall separately identify: PEMB engineering; Shop drawings; Primary structural steel; Secondary structural steel; Bracing; Connections and fasteners; Anchor bolts/templates; Coatings and finishes; Fabrication; Freight/delivery; Crane and erection equipment; Erection labor; Temporary bracing; Field welding/bolting; Project management; Closeout documents; and Other significant cost components. The total Schedule of Values shall equal the submitted Bid Price. Coordination Requirement The successful Bidder is responsible for coordination of the PEMB system with all other portions of the Work. Discovery after award that the proposed PEMB system conflicts with architectural dimensions, structural requirements, MEP systems, apparatus-bay doors, exterior finishes, foundations, or other Contract requirements shall not, by itself, constitute entitlement to additional compensation. The Bidder shall identify known exceptions, exclusions, or deviations prior to Bid through the formal RFI process. Silence shall constitute the Bidder's representation that its proposed PEMB system can be provided in accordance with the Contract Documents for the submitted Bid Price. Warranty Provide the manufacturer's standard structural warranty and all warranties required by the Technical Specifications. The Contractor shall warrant its labor and installation for not less than one (1) year following Substantial Completion or for the longer period required by the Contract Documents. Warranty obligations shall include correction of defective materials, fabrication, connections, erection, and workmanship. Closeout Documents Prior to Final Completion, provide: Final signed and sealed PEMB drawings; Final structural calculations; Record drawings reflecting approved field modifications; Manufacturer's warranties; Contractor warranties; Material certifications; Inspection documentation; Special-inspection documentation assigned to the PEMB Contractor; Engineer letters or certifications required by the Building Official; Operation and maintenance information where applicable; and Other closeout documentation required by the Contract Documents. Introduction Summary Background Contact Information Timeline Attachments Solicitation Terms and Conditions Normal ITB Solicitation Terms and Conditions Submission of a bid in accordance with these Terms and Conditions and the General Terms and Conditions provided in Section IV below constitutes a binding offer from the bidder. The Terms and Conditions incorporated herein will become a part of the written agreement between the parties. Pre-Bid Inquiries All inquiries concerning the solicitation, including, but not limited to, the scope of work, specifications, additional requirements, attachments, general or supplemental terms and conditions, must be submitted to the Office of Purchasing through the e-procurement portal hosted by OpenGov. All questions or inquiries must be received no later than the last day for questions stated on the cover page of the solicitation. Any modification to the bid documents will be in the form of a written addendum issued by the County not less than five (5) days prior to the date and time of bid closing. Addenda will be provided to each bidder via email and posted to the Escambia County website at Escambia County Solicitations ( https://procurement.opengov.com/portal/escambiacountyfl ). Such written addenda or modification shall be part of the solicitation documents and shall be binding upon each bidder. Each bidder is required to submit with the bid a written acknowledgment to confirm receipt of any and all addenda. No bidder may rely upon any verbal modification to or interpretation of the solicitation documents, and no interpretation shall be considered binding unless provided in writing by the Office of Purchasing as provided in this provision. Examination of Documents and Site Before submitting a bid, the bidders shall familiarize themselves with the nature and extent of the work and any local conditions that may in any manner affect the work to be done and the equipment, materials, and labor required. Bidders shall also examine all drawings, specifications, addenda, and other relevant documents to be thoroughly informed regarding any and all conditions and requirements that may in any manner affect the work to be performed under the contract. Preparation of Bid A bid form is included in these specifications. The bidder shall submit bids in accordance with the bid documents. The individual who signs the bid form must be listed as an authorized representative with the records on file with the Florida Division of Corporations website (Sunbiz) with the principal address provided below the signature, or by Board letter authorizing a signatory. All blanks in the bid documents shall be completed by printing in ink or by computer with the amounts extended, totaled and the bid signed. No changes shall be made to the phraseology of the form or in the items mentioned therein. Any bid which contains any omissions, erasures, alterations, additions, irregularities of any kind, or items not called for which shall in any manner fail to conform to the conditions of the solicitation may be rejected. The bid shall include evidence of bidder’s authority and qualification to do business in the State of Florida. As applicable, a state contractor license # for the State of Florida shall also be included on the bid form. Bidder shall be licensed in accordance with the requirements of Chapter 489, Florida Statutes. The bid shall be based upon the completion of the Scope of Work according to the drawings and specifications, together with all addenda thereto. Bids must include lump sum pricing. All proposed fees and costs must be broken down and disclosed in the bid. Integrity of Documents Bidders shall use the original bid documents provided by the Office of Purchasing and enter information only in the spaces where a response is requested. Bidders may use an attachment to the bid documents if sufficient space is not available. Any modifications or alterations to the original bid documents by the bidder, whether intentional or otherwise, may constitute grounds for rejection of a bid. Any such modification or alteration that a bidder wishes to propose must be clearly stated in the form of an addendum to the original bid documents. Submittal of Bid A bid shall be submitted no later than the date and time prescribed in the Invitation to Bid and shall be accompanied by the bid security and other required documents. Applicable bond documents may be uploaded, but any physical checks presented must be delivered to the Office of Purchasing prior to the Bid Opening. It is the bidder’s responsibility to ensure that its bid is delivered at the proper time and place. Offers by email, facsimile, or telephone will NOT be accepted. Each bidder’s submittal shall include all the items listed in the Vendor Submissions section. The Purchasing Department reserves the right to extend the solicitation due date within ten ( 10 ) minutes of the bid opening when the required number of bids has not been received. Any extension will be determined by the Purchasing Department and communicated prior to the scheduled bid opening to prospective respondents through OpenGov. Withdrawal of Bids A bidder may withdraw its bid, either personally or by written request, at any time prior to the scheduled time for Bid Opening. Requests to alter or withdraw a bid must be submitted in writing to the Purchasing Director. Bids may not be altered or unilaterally withdrawn by the contractor after the scheduled time for bid opening. All bids not so withdrawn shall constitute an irrevocable offer and will remain subject to acceptance or rejection by the County for a period of 90 calendar days. Bids to Remain Subject to Acceptance All bids will remain subject to acceptance or rejection by Escambia County for ninety (90) calendar days after the day of the bid opening. The County may, in its sole discretion, release any bid and return the bid security prior to the end of this period. Conditional or Incomplete Bids Escambia County specifically reserves the right to reject any conditional or incomplete bid. Addition/Deletion of Item(s) The County reserves the r General Terms & Conditions Any and all Supplemental Terms and Conditions and specifications referenced within the solicitation that vary from these General Terms and Conditions shall have precedence. Submission of an offer in accordance with these General Terms and Conditions and Supplemental Terms and Conditions constitutes a binding offer from the offeror. The terms and conditions incorporated herein will become a part of the written agreement between the parties. Prospective offerors may utilize the Office of Purchasing Home Page to obtain Vendor Information and Solicitation Information, including Bid/Proposal Tabulations, Recommended Award(s), etc. In order to participate in a solicitation, offerors must establish an account via the e-procurement portal of the County’s vendor management software hosted by OpenGov. Once the vendor registration is completed, the offeror will receive all notifications relating to the relevant solicitation via e-mail to the address registered with the account. Sealed Solicitations: All solicitation forms shall be executed and submitted in the e-procurement portal of the County’s vendor management software. The file name shall contain the solicitation number and title and the contractor/vendor’s name. All solicitations are subject to the terms and conditions specified herein. Solicitation offers which do not comply with these terms and conditions are subject to rejection. Execution of Solicitation: Solicitation forms shall be manually or electronically signed by an authorized representative in the space provided. Persons signing on behalf of a corporate entity must be identified as President or Vice President with the records on fi Source: OpenGov https://procurement.opengov.com/portal/escambiacountyfl/projects/322452 Canonical URL: https://govcontractfinder.com/contracts/myrtle-grove-fire-station-11-pre-engineered-metal-building-s-opengov-3340-project-322452