New AC Units for DAFT Building and Secondary Building at WRF State and local opportunity open City of Pueblo 26-050 Posted: 2026-11-17T15:38:05.110Z Response deadline: 2026-12-09T18:30:00.000Z The awarded Contractor for this project shall assess both sites at the Wastewater Reclamation Facility (WRF), remove the Secondary Building’s existing swamp cooler, install new electrical for the units and thermostats, and install new 1-ton rooftop air-conditioning units at each building (Daft and Secondary Buildings) using the existing roof openings where applicable. Contractor shall complete all work as outlined within this Invitation for Bid. Submitted prices must include furnishing of all labor, materials, and equipment for the supply, delivery, installation, manufacture, testing, warranty, and other materials and services required for the work of this project. Workmanship and material to be first quality throughout; in the absence of comment on particular points, industry standard practice should be presumed to prevail. All standard factory equipment shall be included; no deletions of standard factory equipment will be permitted unless specifically superseded in these specifications. Accessories not specifically mentioned herein, but necessary to furnish complete units ready for use, shall also be included. ADVERTISEMENT FOR BIDS (AS PUBLISHED) The City of Pueblo is soliciting bids for the following project. Project No.: 26-050 Project Name: New AC Units for DAFT Building and Secondary Building at WRF In general, this project will consist of installation of a new 1 ton rooftop air-conditioning unit for the Daft Building, removal of the existing swamp cooler at the Secondary Building, and installation of a new 1 ton rooftop air-conditioning unit for the Secondary Building at the Wastewater Reclamation Facility (WRF) as detailed in this Invitation for Bid. Complete solicitation information can be obtained on the City of Pueblo Purchasing Department website at www.pueblo.us/purchasing or the OpenGov portal at https://procurement.opengov.com/portal/pueblo . Published: Tuesday, November 17, 2026 , in The Pueblo Chieftain Newspaper INTRODUCTION Summary Background Contact Information Timeline SPECIAL PROVISIONS GENERAL INSTRUCTIONS All specifications included in the Special Provisions shall have precedence over and will govern in the event of a conflict with other sections contained in this document. Bidders are responsible for obtaining, reading, and carefully examining the entire Contract Documents package, including any Addenda, prior to submitting a bid. Failure to do so will not relieve a Bidder from any obligation or responsibility to understand and comply with all requirements and conditions for this project. Bidders shall inform themselves of the conditions of the project site and the requirements of the project's scope of work before submitting their bid. No allowances shall be made by reason of any matter or thing concerning which they might not have been fully informed prior to the bidding. No Bidder will be heard after the opening of bids to assert that there was any misunderstanding as to the nature of the operation expected in this solicitation. If a pre-bid meeting is held, Bidders should make every effort to attend. If the pre-bid meeting is mandatory and the Bidders cannot attend, it is imperative that someone else attend as a representative of the company, otherwise, their bid will not be accepted at the time of bid opening. Downloaded plans/drawings must be printed as “Actual Size”; scaling is NOT correct when printed using other options. It is the Bidder’s sole responsibility to ensure plans are printed correctly and to inform third-party printers of this information. The City is not responsible for bidding errors resulting from Bidder’s failure to follow this requirement. Each bid must be accompanied by a certified check, cashier's check, money order or bid bond in the amount of five (5) percent of the grand total bid, plus all alternates if applicable, payable to the City of Pueblo as a guarantee that if the bid is accepted, the bidder will execute and file the proposed contract and bonds within ten (10) days from the date of the Notice of Award. The City is accepting electronic bid submissions. Bidders shall create a FREE account with OpenGov by signing up at OpenGov Procurement . Once you have completed account registration, browse back to this page, click on "Submit Response", and follow the instructions to submit the electronic bid. Bidders must follow the submittal procedures outlined in the bid documents. The City reserves the right to reject any or all bids for any or all items covered in the Invitation for Bid, to waive informalities or defects in bids, or to accept such bids as it shall deem to be in its best interest. RESPONSIBILITY AND CAPACITY TO PERFORM CONCURRENT WORK In determining responsibility, the City may review each Bidder’s capacity to perform multiple City projects concurrently, including staffing, equipment, bonding, financial resources, current workload, and performance history. Bidder’s failure to adequately demonstrate such capacity shall be grounds for determining bidder not responsible. STANDARD CONSTRUCTION SPECIFICATIONS AND STANDARD DETAILS The 2026 Standard Construction Specifications and Standard Details for City of Pueblo, Colorado , adopted January 12, 2026, and as most recently amended, shall control the construction and quality of materials for this project except where specifically modified by the Special Provisions. Unless specifically modified by the Special Provisions, the 2026 Standard Construction Specifications and Standard Details shall control with respect to any inconsistencies with the Plans. The 2026 Standard Construction Specifications and Standard Details are not included in this bid package but are available on the City of Pueblo’s website at 2026 Standard Construction Specifications and Standard Details . By submitting a bid, the Contractor acknowledges possession of a copy of said document. SPECIFICATION LANGUAGE Specifications may be written in abbreviated style with incomplete sentences. Omission of words such as “The General Contractor shall”, “Conforming to”, “shall be”, etc., are intentional; omitted words shall be supplied by inference. Where words “approved”, “satisfactory”, “directed”, “submitted”, etc., are used it shall be assumed that the words “Project Manager” follows, such as “approved by the Project Manager”. DEFINITION OF ENGINEER The term “Engineer” as used in Sections GENERAL PROVISIONS Authority of Engineer (a) and (b), of GENERAL PROVISIONS , shall mean "City Engineer" or "Project Manager" with respect to all questions relating to the conformance of the work with the technical requirements of the plans and specifications, interpretation of the technical requirements of the plans and specifications, and with respect to the rejection of work and materials which do not conform. With respect to all other uses of the term “Engineer” in Section GENERAL PROVISIONS Authority of Engineer, the term shall mean the Director of Public Works. In Sections TERMINATION FOR CAUSE, FINAL ACCEPTANCE OF THE WORK, COMMENCEMENT AND COMPLETION OF WORK and UNCORRECTED WORK and TERMINATION FOR CONVENIENCE of GENERAL PROVISIONS , all references to Engineer shall mean the Director of Wastewater. All other references to Engineer in GENERAL PROVISIONS not specifically addressed in this section shall mean the Consulting Engineer. INCONSISTENCIES Any inquiries regarding seeming inconsistencies between the Plans and Specifications for this project must be made by Tuesday, December 1, 2026 at 4:00 pm (MT). PREPAYMENT OF CITY SALES AND USE TAX (This section applies to public improvement construction projects $100,000 and over.) The Contractor shall make application for, and prepayment of, City sales and use tax on the estimated percentage basis being forty percent (40%) of the total Project bid as awarded, including Base Bid plus those Alternates selected. Application and prepayment shall be made within fourteen (14) days of the date authorized to proceed with construction of the Project as set forth in the Notice to Proceed. All applications and prepayments shall be coordinated directly with City’s Division of Sales and Use Tax, Attention: Tax Audit Manager, 1 City Hall Place, Pueblo, Colorado 81003. Finance Department policy sets the threshold at $100,000. Any contractual obligations below this amount will not generally be required to make a pre-payment of Use Tax. PERA LIABILITY Contractor shall reimburse the City for the full amount of any employer contribution required to be paid by the City of Pueblo to the Public Employees’ Retirement Association (“PERA”) for salary or other compensation paid to a PERA retiree performing contracted services for the City under this Agreement. Awarded Contractor will be required to submit a completed Colorado PERA Questionnaire form. This form is available to view at Colorado PERA Questionnaire and is included by reference in this Contract. CONTRACTOR EVALUATION The performance of the awarded Contractor will be evaluated using the Contractor Evaluation Form. This form is available to view at Contractor Evaluation Form and is included by reference in this Invitation for Bid. The evaluation will be utilized to review Contractor’s performance, increase communication, and foster positive business relationships. The completed evaluation form will serve to document Contractor’s overall performance. Material failure to perform in accordance with the terms of one or more contracts, or materially unsatisfactory performance of one or more contracts, may be justification for disqualifying future bids by Contractor pursuant to Pueblo Municipal Code, Title 1, Chapter 10, Section 1-10-4(d). SITE INVESTIGATION By submitting a bid, Contractor acknowledges the nature and location of the work, the general and local conditions, particularly those bearing upon transportation, disposal, handling and storage of materials, availability of labor, water, electric power, uncertainties of weather, physical conditions at the site, the character/quality of surface and subsurface materials to be encountered, the character of equipment and facilities needed prior to and during the work, and all other matters which can in any way affect the work or the cost thereof under this Contract. Failure by Contractor to acquaint themself with all the available information concerning these conditions will not relieve them from responsibility for estimating properly the difficulty or cost of successfully performing the work. PRE-CONSTRUCTION CONFERENCE The Contractor shall attend a pre-construction conference with the Project Manager, City employees, representatives of the utility companies, and/or other interested parties prior to any construction. Preconstruction meeting will be scheduled 7-10 days after notice of award is issued. Documents Required to be submitted at Pre-Construction Conference: Safety Data Sheets for all parts and materials used for the work outlined in this contract. All manufacturer data on material to be used (i.e. properties, preparation, storage, installation/application & curing). Parts and equipment order information including shipping dates, etc. (This information may be utilized to determine actual work start date.) Proposed Work Schedule (to be reviewed and altered with City to determine actual order, work, and completion dates). SAFETY REGULATIONS The Contractor shall be aware of and shall comply with all State and Federal Safety regulations which are applicable to the work included under this Contract. Enforcement will be by the proper State and Federal regulatory agencies. If any construction activity is deemed to be unsafe for inspection, Contractor shall, upon notification, discontinue work until the deficiencies are corrected and the job can be properly inspected. EMERGENCY REPAIR OR PROTECTIVE WORK BY THE CITY OF PUEBLO As referenced in PROTECTION OF THE PUBLIC, WORK, AND PROPERTY and ACCIDENT PREVENTION of the GENERAL PROVISIONS , it is the Contractor’s responsibility to provide adequate barricades, protective devices and safety measures, and to employ other precautionary means for the adequate protection of the public, the work, and public/private property from injury or loss. Should the City become aware of any condition or circumstance arising from the work, or with respect to any excavation or areas disturbed by Contractor which, in the opinion of the Project Manager, creates or results in any imminent or unreasonable risk to the health/safety of the public or to public/private property, the City may undertake emergency work or repairs. Such work may include, by way of illustration, provision of barricades, traffic control devices or flagmen, deployment or warning signs, repair of lines under construction, repair of collapsed excavations or sinkholes, placement of sandbags or dams, and other emergency efforts. The determination of the necessity during the construction and warranty periods for the City to do any such emergency work or repairs shall rest entirely with the Project Manager. The cost of emergency work done by the City, including the actual cost of labor, equipment, and materials, plus 100 percent, shall be deducted from any amounts otherwise owed to Contractor, or may be invoiced to Contractor, or the same amount shall be recovered from Contractor’s performance bond. REPRESENTATIVE AVAILABLE FOR EMERGENCY CALLS The Contractor shall provide the name, address and phone number of a representative who may be reached at any time during the life of the Contract regarding repairs, detours, barricading, etc. This information shall be furnished in writing to the Project Manager. DUST PREVENTION During construction and until final acceptance by the Project Manager, Contractor shall be responsible for controlling dust emissions in the construction area. No earthwork activities shall be performed when the wind speed exceeds thirty (30) miles per hour. All fill areas shall be compacted on a daily basis to 95% minimum compaction. Any mud or dirt carry out onto paved surfaces shall be cleaned up on a daily basis. Contractor shall promptly comply with all directives from the Project Manager relating to dust control. If Contractor fails to comply or provide adequate means to control dust, a stop-work order will be issued until the problem is corrected. SITE RESTORATION AND CLEANUP Contractor shall maintain and/or repair any damage done to all existing properties, public or private, adjacent to site improvements, including but not limited to, asphalt, base course, utilities, sod, irrigation systems and landscaped areas. In general, disturbed areas shall be replaced to the lines, grades, thickness, and like materials of the existing conditions unless otherwise stated on the plans. Restoration shall be consistent with that of areas adjacent to the limits of construction. Any grass, plant, landscaped, sloped, irrigated, or rocked areas damaged during Contractor's storage of materials, construction vehicle use, etc. (as applicable) must match the existing areas as they were prior to Contractor's use at Contractor's expense. Site restoration and cleanup will not be measured or paid separately but shall be included in the unit prices for each bid item. Partial payments will not be made on any bid item until the restoration and cleanup associated with that item is satisfactorily complete and acceptable to the Project Manager. UTILITY LOCATIONS The accuracy of information furnished in regard to underground utilities is not guaranteed. The utility locations are approximate and may not include all utilities. Contractor shall determine the exact location of all utilities before commencing work. Contractor shall be fully responsible for any damage which might occur due to Contractor’s failure to locate and protect all utilities. Contractor shall repair or have repaired, at no cost to the City, any damage to utilities. Existing utilities include gas, water, service lines, meters, meter cans, buried telephone cables, buried power lines, pedestals, utility poles, sanitary sewer, manholes and services, and any other existing utility. ABANDONED UTILITIES If during construction an abandoned utility is encountered Contractor shall contact and coordinate with the Project Manager to arrange for the removal of the utility. If Contractor elects to remove the utility without contacting the Project Manager, Contractor shall do so at no cost to the City. OVERHEAD AND/OR UNDERGROUND HIGH VOLTAGE POWER LINES Unless danger against contact with high voltage overhead and/or underground lines has been effectively guarded against, Contractor shall not perform any function/activity upon any land, building, highway, or other premises if at any time during the performance of any function/activity it could move or be placed within ten (10) feet of any high voltage overhead and/or underground line. If work is to be performed within ten (10) feet of high voltage overhead and/or underground lines, the public utility must first be notified to arrange for safety provisions. Contractor may perform the work only after arrangements, including coordination and payment of fees, if applicable, have been made with the utility company. COORDINATION OF CONSTRUCTION ACTIVITIES Contractor and subcontractors shall coordinate work with all other construction activities and contractors; and cooperate with them to facilitate general progress of the work. Each trade shall afford other trades every reasonable opportunity for installation and storage of materials. WORK BY OTHERS Contractor shall coordinate work on the project with all work shown on the plans which is to be done by “others”. It is the Contractor’s responsibility to coordinate work with each entity and incorporate it into the project schedule. COMPLETE WORK ON TIME Failure to complete the work by the allotted 60 calendar days shall result in the assessing of liquidated damages according to GENERAL PROVISIONS . LAYING OUT WORK Contractor shall locate all general reference points and take such action as necessary to prevent their destruction. Contractor shall lay out their own work and be responsible for all lines, elevations, and measurements of the building, grading, utilities, and other work executed under this Contract. Contractor shall exercise proper precaution to verify figures shown on the drawing before laying out work and will be responsible for any error resulting from failure to exercise such precautions. HOURS OF WORK The Project Manager and the Inspection Division are available from 7:00 a.m. to 12:00 p.m. and 1:00 p.m. to 4:00 p.m., Monday through Friday, excluding holidays. Any work done outside of these hours must be approved by the Project Manager. MOBILIZATION This item shall consist of mobilizing of personnel, equipment, and supplies to the project site in preparation for work on the project. Mobilization must be included in each line item and shall not be paid as a separate item. PERMITS AND FEES It shall be the Contractor’s responsibility to investigate and assess the requirements for all necessary environmental, drainage, and construction permits. The total cost of all permits or fees which may be required shall be included in the bid proposal. No additional payment shall be allowed for any permits or fees required to complete the project. Contractor shall comply with all conditions of the permits. City and/or other agency fines are the sole responsibility of the Contractor. Following is a list of potential permits required for the project. Contractor shall be responsible for verifying this list and adding/obtaining any additional permits needed for the project. Air Quality Permit Permitting Agency: Pueblo County/Colorado Department of Public Source: OpenGov https://procurement.opengov.com/portal/pueblo/projects/320193 Canonical URL: https://govcontractfinder.com/contracts/new-ac-units-for-daft-building-and-secondary-building-at-wrf-opengov-1996-project-320193