North Coast Connector State and local opportunity open City of Cleveland Posted: 2026-10-01T18:47:37.778Z Response deadline: 2026-12-31T05:00:00.000Z Project Overview The North Coast Connector will bridge the divide that has separated Cleveland’s city center from Lake Erie for generations — making the lakefront more accessible for residents and visitors while unlocking substantial economic development potential along one of the nation’s most promising urban waterfronts. The North Coast Connector is a proposed land bridge connecting the downtown to the lakefront. It will span over the railroad tracks and the Shoreway (State Route 2) to restore access and repair more than a century-old divide, opening up new land for community gatherings and future economic development. State Route 2 will be converted from a limited access freeway to a safer lower-speed local boulevard. The North Coast Connector will advance through multiple phases. Phase 1 includes the Shoreway conversion from approximately West 9th Street to east of East 9th Street, and associated infrastructure improvements, including the land bridge. Phase 2 will run from east of East 9th Street to the Innerbelt Curve and will advance once the city obtains construction funding. Phase 1 will include the Shoreway conversion to a boulevard between West 9th Street and east of East 9th Street, construction of a Land Bridge, W. 3rd Street Bridge improvements, dedicated Port access, demolition work, retaining walls, sidewalks, multi-use paths, and related infrastructure needed before later project elements can move forward. The City is currently coordinating NEPA approval, identifying major utility relocations, identifying necessary ROW parcels, acquiring key permits, and preparing a financial plan, which includes FHWA funding. The North Coast Connector is poised to create significant opportunities for businesses located in Cleveland, Northeast Ohio, and across the United States. Proposed Procurement Approach The City anticipates delivering the Project under a Progressive Design-Build (PDB) procurement model (subject to change at the City’s discretion). Industry Forum Event The City held an industry forum event on October 28 th , 2026 at the Huntington Convention Center of Cleveland, followed by one-on-one meetings with interested design build teams with experience delivering comparable projects in the role of prime. The slide deck used for the presentation and the attendee list can be found in the attachments on this project listing. Reference Information Project Website: https://clevelandnorthcoast.com/projects/north-coast-connector Newsletter: Sign up on the project website for update emails Office of Equal Opportunity: www.clevelandohio.gov/city-hall/departments/law/divisions/office-equal-opportunity The City will use this OpenGov portal for all procurement-related activities, such as release of the procurement documents and for procurement submissions. More information will be provided as it becomes available. City of Cleveland Project Manager The contact person for this procurement is: Keshia Chambers Interim Project Manager, North Coast Connector Project Assistant Director, Mayor's Office of Capital Projects 601 Lakeside Ave E. Cleveland Ohio, 44114 Phone: 216-664-2618 Email: kchambers3@clevelandohio.gov Overview Summary Background Contact Information Timeline Source: OpenGov https://procurement.opengov.com/portal/clevelandoh/projects/310813 Canonical URL: https://govcontractfinder.com/contracts/north-coast-connector-opengov-4214-project-310813