On-Call Construction, Site and Hazardous Material Testing and Inspection Services for Miscellaneous Projects State and local opportunity open City of Seattle FAS 2026-036 Posted: 2026-11-19T22:45:01.594Z Response deadline: 2027-01-05T22:00:00.000Z The City of Seattle is seeking qualifications for On-Call Construction, Site and Hazardous Material Testing and Inspection Services for Miscellaneous Projects . Qualifications are due no later than 2:00 pm on Tuesday, January 5, 2027 . All questions are to be submitted through the e-procurement portal at https://procurement.opengov.com/portal/seattle no later than 5:00 pm on Tuesday, December 8, 2026 . Scope of Work Each project will have a different list of required services. The following lists represent the most common tasks, though not a definitive list for all potential tasks. Testing Methods including but not limited to Inspections -- visual and physical procedures to verify the constructed conditions are in compliance with the permit and specification requirements. Destructive tests -- sacrifice specimens to measure limits (e.g., compressive strength, tensile tests Non-destructive tests -- assess without damage (e.g., ultrasound, rebound hammer, X-ray Construction Materials Testing and Inspection Provides the systemic evaluation of the physical and chemical properties of building materials to ensure they meet required standards for strength, durability and performance, thereby safeguarding safety and project quality. On-site and lab testing. Quality control/assurance programs. Special inspections including soil, concrete, masonry, steel and welding. Digital field data collection for real-time deviation tracking. Best Practices Test before, during and after construction. Follow applicable standards for the region and project type. Use both destructive and non-destructive methods for comprehensive data. Maintain accurate records for compliance and future reference. Common Materials Tested including but not limited to: Concrete -- workability, compressive strength, air content, temperature. Steel reinforcement -- tensile strength, yield point, impact resistance. Aggregates - gradation, abrasion resistance, moisture content. Soil -- load-bearing capacity (CBR), compaction, permeability. Asphalt/bitumen - mix performance, durability, temperature stability. Sample construction sites from CD's portfolio Fire Station 31 Replacement Seattle Municipal Tower Floors 44-50 Tenant Improvement Site Material Testing and Inspection Detailed investigation that tests soil, groundwater and sometimes soil vapor to confirm presence, extent and source of contamination suspected to be on site. This Scope of Work defines the services, responsibilities and standards for testing of existing site material when requested during preliminary design phases and/or construction activities. It ensures that all testing is performed in compliance with applicable federal, state and local regulations including but not limited to the EP, NESHAP, WorkSafeBC and other relevant environmental health and safety standards. On site and lab testing. Quality control/assurance programs. Special inspections including soil, concrete, masonry, steel and welding. Digital field data collection for real-time deviation tracking. Common Materials Testing including but limited to: Soil testing Groundwater testing Soils vapor testing Surface water analysis Sample construction sites from CD's portfolio Fire Station 31 Replacement Bakun Building Renovation Airport Way Center Building C SDOT Forestry Facility- West Seattle Hazardous Materials Testing, Inspection and Monitoring This Scope of Work defines the services, responsibilities and standards for testing of existing site material when requested during preliminary design phases and/or construction activities. It ensures that all testing is performed in compliance with applicable federal, state and local regulations including but not limited to the EP, NESHAP, WorkSafeBC and other relevant environmental health and safety standards. Testing Asbestos-containing materials (ACMs) -- visual assessment and bulk sampling of suspect materials, with samples sent to a certified laboratory for analysis. Mold - health detriment but not currently regulated. Lead-based paint (LBP) -- visual inspection and, if required, paint chip csampling using XRF analysis factoring in the Lead Renovation, Repair and Painting Rule. Mercery, PCBs, universal wastes, flammable/explosive materials and other regulated substances -- visual inspection and sampling Industrial hygiene surveys - air quality monitoring and hazard identification for hazardous material abatement projects Monitoring and Clearance Report (if required) Coordination for abatement permits Abatement monitoring. Clearance Report Sample construction sites from CD's portfolio ADA Barrier Removal Seattle Municipal Tower floors 44-50 Tenant Improvement Fire Station 2 Window Replacements Seattle Fire Department Headquarters Elevator Modernization Procurement Contact Information Procurement Contact: Margo Robb , Sr. Contracts Administrator, margo.robb@seattle.gov Qualifications are to be submitted through the e-Procurement portal at https://procurement.opengov.com/portal/seattle , no later than 2:00 pm on Tuesday, January 5, 2027 . Unless authorized by the Procurement Contact, no other City official or employee may speak for the City regarding this solicitation until award is complete. Any Respondent contacting other City officials or employees does so at Respondent’s own risk. The City is not bound by such information. Purpose and Background The City of Seattle Department of Finance and Administrative Services (FAS), Capital Development division (CD) owns and maintains 120 building across the City. As such, there is a continuous need for consultant teams to provide construction, site and hazardous material testing and inspection services to ensure the safety and functionality of these facilities. Selected firms may be large or small and can include sub-consultants for any of the above-mentioned services. CD is responsible for conducting public works projects and associated planning and studies for government and other FAS owned and managed facilities. The portfolio of City-owned real estate includes City Hall, the Seattle Justice Center, the Seattle Municipal Tower, police precincts, fire stations, shops and yard facilities, and others. CD uses on-call contracts to address a volume of emergent needs for a variety of projects and clients in a timely manner. Upon contract execution, individual projects and scopes of work will be developed and authorized by CD on an as-needed basis, according to available City funding. For consultants selected for on-call contracts, specific projects, their exact scope of work, and the fee for the work will be determined by mutual agreement between the City and the consultant and issued by Letter of Authorization (LOA) to spend down the respective contract. Any such LOA will also detail the City’s project manager assigned to the work. The contracts will be open for five (5) years through 2032. The City anticipates executing two to three contracts as a result of this process. The maximum amount for each contract for the contract term shall not exceed $2,000,000. The City makes no guarantee of full or partial contract usage. Solicitation Objectives The City expects to achieve the following outcomes through this consultant solicitation: This RFQ process will provide the opportunity to select 2-3 experienced teams for construction, site and hazardous materials testing and inspection services. A selected consultant team would be immediately available for new on-call work. A consultant team would have the resources to respond to emergency or deemed urgent on-call work. A consultant team would have the skill, personnel, processes, administration to design and advance on-call work to City standards and expectations. Minimum Qualifications Minimum qualifications are required for a Consultant to be eligible to submit a proposal response. Your submittal response must show compliance to these minimum qualifications. Those that are not responsive to these qualifications shall be rejected by the City without further consideration: Consultant has completed at least 3 projects that included Construction and Site Materials Testing and Hazardous Material Testing and Monitoring Services in the last ten (10) years. Provide three (3) reference, previous clients/owners/architectural partners that have worked with your firm in the last ten (10) years to demonstrate client satisfaction. Include contact name, phone number and address and name of project(s). Lead team members for the prime consultant, as well as any subconsultants, must work in an office within 50 miles of downtown Seattle. Contract Modifications The City consultant contract is attached (See Attachments Section). Consultants submit proposals understanding all Contract terms and conditions are mandatory. Response submittal is agreement to the Contract without exception. The City reserves the right to negotiate changes to submitted proposals and to change the City's otherwise mandatory Contract form during negotiations. If the Consultant is awarded a contract and refuses to sign the attached Contract form, the City may reject the Consultant from this and future solicitations for the same work. Under no circumstances shall Consultant submit its own boilerplate of terms and conditions. Procedures and Requirements This section details City instructions and requirements for your submittal. The City reserves the right in its sole discretion to reject any Consultant response that fails to comply with the instructions. Registration into the City's Procurement Portal If you have not previously done so, register at: https://procurement.opengov.com/portal/seattle , then subscribe to the City’s Procurement Portal. The Procurement Portal is used by City staff to identify companies for future solicitation lists and check certifications. Women- and minority-owned firms are asked to self-identify their business as such in OpenGov. Registration in the City's Procurement Portal is required to submit a response to this solicitation. Pre-Submittal Conference The City offers an optional pre-submittal conference at the time, date and location on the Timeline. Respondents are highly encouraged to attend but not required to attend to be eligible to submit their qualifications. The meeting answers questions about the solicitation and clarifies issues. This also allows Respondents to raise concerns. Failure to raise concerns over any issues at this opportunity will be a consideration in any protest filed regarding such items known as of this pre-submittal conference. Questions Respondents may submit their questions through the Procurement Portal. Respondents may also email questions to the Procurement Contact until the deadline stated in the Timeline. Failure to request clarification of any inadequacy, omission, or conflict will not relieve the Consultant of responsibilities under any subsequent contract. It is the responsibility of the interested Consultant to assure they receive responses to questions if any are issued. Changes to the RFQ The City may make changes to this RFQ if, in the sole judgment of the City, the change will not compromise the City’s objectives in this solicitation. Any change to this RFQ will be made by formal addendum issued by the City, through the Procurement Portal at https://procurement.opengov.com/portal/seattle and shall become part of this RFQ. Receiving Addenda and/or Question and Answers It is the obligation and responsibility of the Consultant to learn of addenda, responses, or notices issued by the City, through the Procurement Portal. Some third-party services independently post City of Seattle solicitations on their websites. The City does not guarantee that such services have accurately provided all the information published by the City. All submittals sent to the City may be considered compliant with or without specific confirmation from the Consultant that any and all addenda was received and incorporated into your response. However, the Project Manager reserves the right to reject any submittal that does not fully incorporate Addenda that is critical to the project. Qualifications Submittal Responses must be received by the City no later than the date and time in the Timeline, except as revised by Addenda. The submitter has full responsibility to ensure the response is submitted to the City's Procurement Portal within the deadline. The Procurement Portal will not allow vendors to upload submissions past the deadline. Respondent Responsibility to Provide Full Response It is the Respondent's responsibility to respond in a manner that does not require interpretation or clarification by the City. The Respondent is to provide all requested materials, forms and information. The Respondent is to ensure the materials are submitted properly and accurately reflect the Respondent’s qualifications. During scoring and evaluation (prior to interviews if any), the City will rely upon the submitted materials and shall not accept materials from the Respondent after the RFQ deadline; this does not limit the City’s right to consider additional information (such as references that are not provided by the Respondent but are known to the City, or past City experience with the consultant), or to seek clarifications as needed. Prohibited Contacts Respondents shall not interfere in any way to discourage other potential and/or prospective consultants from submitting or considering participation in the submittal process. Prohibited contacts includes but is not limited to any contact, whether direct or indirect (i.e. in writing, by phone, email or other, and by the Respondent or another person acting on behalf of the Respondent) to a likely firm or individual that may discourage or limit competition. If such activity is evidenced to the satisfaction and in sole discretion of the City department, the Respondent that initiates such contacts may be rejected from the process. License and Business Tax Requirements The Consultant must meet all applicable licensing requirements immediately after contract award or the City may reject the Consultant. Companies must license, report and pay revenue taxes for the Washington State business License (UBI#) and Seattle Business License, if required by law. Carefully consider those costs before submitting an offer, as the City will not separately pay or reimburse such costs. Seattle Business Licensing and associated taxes If you have a “physical nexus” in the city, you must obtain a Seattle Business license and pay all taxes due before the Contract can be signed. A “physical nexus” means you have physical presence, such as: a building/facility/employee(s) in Seattle, you make sales trips into Seattle, your own company drives into Seattle for product deliveries, and/or you conduct service work in Seattle (repair, installation, service, maintenance work, on-site consulting, etc). We provide a Consultant Questionnaire Form in our submittal package items later in this RFP/RFQ, and it will ask you to specify if you have “physical nexus”. All costs for any licenses, permits and Seattle Business License taxes owed shall be borne by the Consultant and not charged separately to the City. The apparent successful Consultant(s) must immediately obtain the license and ensure all City taxes are current, unless exempted by City Code due to reasons such as no physical nexus. Failure to do so will cause rejection of the submittal. The City of Seattle Application for a Business License and additional licensing information can be found this page here: https://www.seattle.gov/city-finance/business-taxes-and-licenses/business-licenses For Questions and Assistance, call the Revenue and Consumer Protection (RCP) office which issues business licenses and enforces licensing requirements. The general e-mail is tax@seattle.gov . The main phone is 206-684-8484. Self-Filing You can pay your license and taxes on-line https://www.filelocal-wa.gov/Default_FileLocal.aspx If a business has extraordinary balances due on their account that would cause undue hardship to the business, the business can contact the License and Tax Administration office at tax@seattle.gov or 206-684-8484 to request additional assistance. Those holding a City of Seattle Business license may be required to report and pay revenue taxes to the City. Such costs should be carefully considered by the Consultant prior to submitting your offer. When allowed by City ordinance, the City will have the right to retain amounts due at the conclusion of a contract by withholding from final invoice payments. State Business Licensing Before the contract is signed, you must have a State of Washington business license (a “Unified Business Identifier” known as a UBI#). If the State of Washington has exempted your business from State licensing (some foreign companies are exempt and sometimes, the State waives licensing because the company has no physical presence in the State), then submit proof of that exemption to the City. All costs for any licenses, permits and associated tax payments due to the State because of licensing shall be borne by the Consultant and not charged separately to the City. Instructions to apply for a business license can be found at https://dor.wa.gov/open-business/apply-business-license and the State of Washington Department of Revenue contact help page at https://dor.wa.gov/contact . Federal Excise Tax The City is exempt from Federal Excise Tax. No Guaranteed Utilization The City does not guarantee utilization of any contract(s) awarded through this RFQ process. The solicitation may provide estimates of utilization; such information is for Consultant convenience and not a usage guarantee. The City reserves the right to issue multiple or partial awards, and/or to order work based on City needs. The City may turn to other appropriate contract sources or supplemental contracts to obtain these same or similar services. The City may re-solicit for new additions to the Consultant pool. Use of such supplemental contracts does not limit the right of the City to terminate existing contracts for convenience or cause. Expansion Clause The contract limits expansion of scope and new work not expressly provided for within the RFQ. Expansion for New Work (work not specified within the original Scope of Work Section of this Agreement, and/or not specified in the original RFQ as intended work for the Agreement) must comply with the following: (a) New Work is not reasonable to solicit separately; (b) is for reasonable purpose; (c) was not reasonably known by the City or Consultant at time of solicitation or was mentioned as a possibility in the solicitation (i.e. future phases of work, or a change in law); (d) is not significant enough to be regarded as an independent body of work; (e) would not attract a different field of competition; and (f) does not change the identity or purpose of the Agreement. The City may make exceptions for immaterial changes, emergency or sole source conditions, or other situations required in City opinion. Certain changes are not subject to these limitations, such as additional phases of Work anticipated during solicitation, time extensions, and Work Orders issued on an On-Call contract. Expansion must be mutually agreed and issued by the City through written Addenda. New Work performed before an authorizing Amendment may not be eligible for payment. The City reserves the right to independently solicit and award any New Work to another firm when deemed appropriate or required by City policy. Effective Dates of Offer Solicitation responses are valid until the City completes award. Should any Respondent object to this condition, they must object prior to the Q&A deadline in the Timeline. Cost of Preparing Submittals The City is not liable for costs incurred by the Respondent to prepare, submit and present qualifications, interviews and/or demonstrations Source: OpenGov https://procurement.opengov.com/portal/seattle/projects/286884 Canonical URL: https://govcontractfinder.com/contracts/on-call-construction-site-and-hazardous-material-testing-and-opengov-12-project-286884