On-Call Electrical Maintenance, Repair, and Emergency Services for County Facilities State and local opportunity closed County of San Benito PWB-2644 Posted: 2026-10-30T17:30:00.705Z Response deadline: 2026-11-13T22:00:00.000Z The County of San Benito, through its Public Works Department, is soliciting proposals from qualified and licensed electrical contractors to establish a three-year, on-call contract for electrical maintenance, repairs, troubleshooting, and emergency response services at County-owned and operated facilities. Services will be provided on an as-needed basis to support routine facility operations, address electrical deficiencies, and respond to unexpected electrical failures and emergencies. The selected contractors shall provide qualified personnel, supervision, equipment, tools, materials, and technical expertise to perform electrical services, including electrical distribution system repairs, generator and automatic transfer switch (ATS) troubleshooting, temporary power connections, and emergency power restoration. Contractors must demonstrate the ability to provide timely services, including 24-hour emergency response availability during weekends, holidays, severe weather events, and utility power outages. The County intends to establish agreements with multiple qualified contractors to ensure adequate service coverage, timely response, and continuity of essential County operations. Work will be assigned as needed and authorized by the County, with no guarantee of a minimum quantity of work or expenditure. Individual work assignments shall not exceed $75,000 per project, subject to applicable provisions of California Public Contract Code Section 22032 under the California Uniform Public Construction Cost Accounting Act (CUPCCAA). Projects exceeding this threshold shall be procured separately in accordance with applicable County purchasing policies and public contracting requirements. Work shall not be divided into smaller assignments to circumvent competitive bidding requirements, pursuant to Public Contract Code Section 22033. On-Call Electrical Services – Schedule of Rates Routine Electrical Service Call – Includes mobilization and first 2 hours of labor Additional Electrical Labor – Beyond Initial 2 Hours Emergency Electrical Service Call – After Hours, Includes Mobilization and First 2 Hours Emergency Electrical Service Call – Weekend/Holiday, Includes Mobilization and First 2 Hours Additional Emergency Electrical Labor Generator / ATS Troubleshooting – Regular Hours, Includes Mobilization and First 2 Hours Generator / ATS Emergency Troubleshooting – After Hours, Weekends, and Holidays, Includes Mobilization and First 2 Hours of Labor Materials Markup Subcontractor Markup Cover Page County of San Benito Public Works Department REQUEST FOR PROPOSALS On-Call Electrical Maintenance, Repair, and Emergency Services for County Facilities Three-Year, Multiple-Award On-Call Electrical Services Contract Countywide Electrical Services Supporting Critical Facilities, Operational Continuity, and Emergency Power Restoration 24/7 Emergency Response Availability PWB-2644 County of San Benito 481 4th Street Hollister, CA 95023 RESPONSE / PROPOSAL DUE DATE: Friday, November 13, 2026 , 2:00 pm QUESTIONS / RESPONSE MUST BE SUBMITTED ELECTRONICALLY AT: https://secure.procurenow.com/portal/cosb Introduction Summary Background Contact Information Timeline Project Details / Scope of Work Project Documents and Specifications The County of San Benito is soliciting proposals from qualified electrical contractors to establish three-year, on-call contracts for electrical maintenance, repair, troubleshooting, and emergency response services at County-owned and operated facilities. The scope of services, contractor qualifications, emergency response requirements, pricing requirements, and other applicable terms and conditions are outlined in this Request for Proposals (RFP). Proposers shall carefully review all requirements and specifications contained in this RFP before submitting their proposals. Additional information can be found in project document(s) available below for download: Attachment(s): Draft Contract (Sample) Documents Required from Selected Contractor(s) Prior to Contract Execution Pricing Table Evaluation Criteria / Process Evaluation Criteria / Process: The County will evaluate proposals based on contractor qualifications, relevant experience, technical capabilities, emergency response availability, and proposed pricing. An Evaluation Committee will review and score proposals using the criteria below. Proposal Evaluation Criteria (100 Points) Evaluation Criteria Points Relevant Experience in Electrical Maintenance, Repairs, Emergency Services, Including Experience with Government and Public Facilities 30 Emergency Response Availability and Mobilization Capability 20 Technical Qualification, Staffing, and Equipment Resources 20 Proposed Pricing and Cost Competitiveness 20 References and Past Performance 10 Total 100 The County will evaluate and rank proposals based on the established evaluation criteria. As part of the selection process, the County may request additional information, verify references, or conduct interviews, as deemed necessary. The County reserves the right to select one or more qualified contractors whose proposals best meet the County's operational needs, technical requirements, and cost considerations. Final selection and contract award shall be subject to successful negotiations and applicable County approval requirements. Terms and Conditions The following Terms and Conditions apply to this Request for Proposals (RFP) and any resulting agreement(s) for On-Call Electrical Maintenance, Repair, and Emergency Services for County Facilities. 1. Contractor Licensing and Qualifications Contractors shall possess and maintain a valid California Contractors State License Board (CSLB) Class C-10 Electrical Contractor License and all applicable licenses, certifications, and registrations required to perform the services. The County reserves the right to verify contractor qualifications, experience, references, and available resources. 2. Prevailing Wage and DIR Registration Contractors and subcontractors shall comply with applicable California prevailing wage laws and Department of Industrial Relations (DIR) registration requirements for work classified as public works. Applicable labor compliance requirements shall be satisfied for each authorized assignment. 3. Pricing and Compensation Proposers shall submit pricing in accordance with the electronic Schedule of Rates included in this RFP. Proposed rates shall include applicable labor, mobilization, travel, and other charges as specified in the pricing schedule. Materials and approved subcontractor services shall be billed in accordance with the accepted markup rates. No additional charges shall be permitted without prior County authorization. 4. Contract Term and Work Authorization The anticipated contract term shall be three (3) years from the effective date of the executed agreement. Services shall be provided on an as-needed basis and only upon authorization by designated County representatives. The County does not guarantee any minimum quantity of work or expenditure. All assignments shall be subject to available funding and applicable procurement requirements. Individual work assignments shall not exceed $75,000 per project, subject to applicable provisions of California Public Contract Code Section 22032 under the California Uniform Public Construction Cost Accounting Act (CUPCCAA). Projects exceeding this threshold shall be procured separately in accordance with applicable County purchasing policies and public contracting requirements. Work shall not be divided into smaller assignments to circumvent competitive bidding requirements, pursuant to Public Contract Code Section 22033. 5. Emergency Response and Availability Contractors shall maintain the emergency contact information and response capabilities specified in the Scope of Work. Emergency services may be required outside regular business hours, including weekends and holidays. Contractors shall promptly notify the County if they are unable to meet the required response time. 6. Labor, Materials, and Equipment Contractors shall furnish all qualified personnel, supervision, materials, tools, equipment, transportation, and other resources necessary to perform authorized services. Materials and equipment shall be new, free from defects, and suitable for their intended use unless otherwise approved by the County. 7. Subcontractors The use of subcontractors shall require prior written authorization from the County. Subcontractors shall maintain all applicable licenses, certifications, and registrations. The prime contractor shall remain responsible for the performance, quality, safety, and coordination of all subcontracted services. 8. Safety and Regulatory Compliance All services shall comply with applicable federal, state, and local laws, electrical codes, Cal/OSHA regulations, and County safety requirements. Contractors shall implement appropriate electrical safety procedures, including lockout/tagout and safe isolation of electrical equipment. 9. Insurance and Bonding Contractors shall maintain insurance coverage in accordance with County contract requirements. Performance bonds, payment bonds, and other applicable securities may be required for individual work assignments in accordance with California law and County requirements. 10. Work Documentation and Invoicing Contractors shall provide service documentation identifying the work performed, personnel assigned, labor hours, materials used, and applicable charges. Invoices shall reference the County's authorization and include supporting documentation as required. Charges exceeding authorized amounts shall require prior County approval. 11. Governing Law and Venue This RFP and any resulting agreement shall be governed by the laws of the State of California. Jurisdiction and venue for disputes shall be in the appropriate courts serving San Benito County, California. 12. County Rights and Reservations The County reserves the right to accept or reject any or all proposals, request additional information, waive minor irregularities to the extent permitted by law, cancel or modify the solicitation, and negotiate with qualified proposers. Issuance of this RFP does not obligate the County to award a contract or reimburse any proposal preparation costs. 13. Standard County Agreement Selected contractors shall be required to execute the County's standard agreement and comply with all applicable contractual, insurance, indemnification, and administrative requirements. Contract awards shall be subject to applicable County approval procedures. 14. Electronic Proposal Submission Proposals shall be submitted electronically through the County's OpenGov Procurement portal in accordance with the solicitation instructions and submission deadline. Questions regarding the RFP shall be submitted through OpenGov, and official clarifications shall be issued in writing through the same portal. Electronic Response Submission Project Documents Terms and Conditions Terms and Conditions 1. Submission Deadline Proposals must be electronically received by the due date via the OpenGov system. The main page for the County is located at: https://procurement.opengov.com/portal/cosb . Allow sufficient time for the upload to be completed by the due date and time. Partial uploads will automatically terminate, and proposals will be rejected. The OpenGov system submission time will be the official submission time. The County will not be responsible for and may not accept proposals that are late due to slow internet connections or for any other failure of the OpenGov system. NOTE: The County does not maintain the OpenGov system and is not liable for site failures or technical problems. To resolve technical issues, contact OpenGov Technical Support by using the real-time chat located in the lower right hand corner of the screen, or via email at procurement-support@opengov.com . 2. Pre-submission Registration Organizations or individuals interested in responding to this solicitation must register online with the County of San Benito at: https://procurement.opengov.com/portal/cosb . 3. Electronic Submissions It is recommended to include the proposer's name and the Solicitation title and number in each file name. Documents should be created in the following format: Text should be Times New Roman (12-point minimum font size) Pages should have margins of at least one inch on all sides (excluding headers and footers) If the proposal is lengthy, a Table of Contents should be included. PDF format is preferred. 4. Errors in Proposals The County will not be liable for any errors in this Solicitation or in submitted proposals. Proposals may be rejected as unresponsive if they are late, incomplete, missing pages or information, or cannot be opened for any reason. The County may waive minor irregularities, but such waivers will not modify any remaining Solicitation requirements. 5. Evaluation of Proposals Evaluation Committee: A committee or individual staff person(s) ("Reviewer(s)" will evaluate and score proposals based on the evaluation criteria and corresponding point allocations established in the Evaluation Criteria / Process section of this RFP. The County may request additional information, verify references, or conduct interviews with selected proposers as necessary to complete the evaluation process. The County reserves the right to select one or more qualified contractors based on overall qualifications, relevant experience, technical capabilities, emergency response availability, proposed pricing, and the best interests of the County. Selection will not necessarily be based on the lowest proposed price. Any contract award shall be subject to successful contract negotiations and applicable County approval requirements. 6. Negotiations and Notice of Intent to Award, Acceptance Period After the evaluation of proposals and final consideration of all pertinent information available, the County may reject all proposals. If a decision is made to take steps to enter into an agreement with one or more proposers, the County will post a Notice of Intent to Award or otherwise notify proposers the remaining proposers of their non-selection. If a Notice of Intent to Award is issued, the notice shall not create rights, interests, or claims of entitlement for the highest-rated Proposer and all proposals may still be rejected. The highest-rated Proposer should be prepared to enter into a Contract with the County which shall be substantially the same as the Standard Contract included as an attachment to this Solicitation (except as to the scope of work and compensation). Please ensure that your firm has completed legal review of these contract terms. The County will consider Contract Exceptions Requests but reserves the right to reject requested modifications to its standard terms. The Contract provided with this Solicitation is to be considered a sample and the County reserves the right to add terms and conditions, deemed to be in the best interest of the County based on the selected proposal, during final contract negotiations. If a Proposer fails to sign and return the Contract drawn pursuant to this Solicitation and final Contract negotiations within 14 days of its delivery to the Proposer, the County may cancel the award and award the Contract to the next highest rated Proposer. 7. Communications As of the issuance date of this Solicitation and continuing until it is canceled or an award is made, no proposer or person acting on behalf of a prospective proposer may discuss any matter relating to the Solicitation with any officer, agent, or employee of the County, other than through the OpenGov portal, to the Authorized Contact Person, or as outlined in the evaluation or protest procedures. Proposers (including any agent, owner, employee, board members, or other such affiliates) shall not offer any gift, favor, or other personal benefit to any County officer or employee during the procurement process for this agreement, including during the solicitation period and contract negotiations. Violation(s) of the foregoing prohibitions may result in a proposer being found non-responsible and barred from participating in this or future procurement. 8. Award Procedure Contract negotiations are neither an offer nor guarantee that a contract will be executed. A contract award, if any is made, will be to the responsive, responsible proposer offering the overall best value to the County for the services and goods described in this solicitation, or as applicable, for a specific portion of the services and goods described. Any agreement reached will be memorialized in a formal agreement using the attached template, executed by the appropriate authority. 9. Commencement of Performance After all parties have signed the agreement, the County will notify the contractor and performance may proceed. Prior to execution of the agreement by the County, no County employee may authorize work under the a Source: OpenGov https://procurement.opengov.com/portal/cosb/projects/319258 Canonical URL: https://govcontractfinder.com/contracts/on-call-electrical-maintenance-repair-and-emergency-services-opengov-333-project-319258