On-Call Elevator Assessment, Modernization or Replacement and Construction Administration Services State and local opportunity evaluation City of Seattle FAS 2026-039 Posted: 2026-10-29T16:42:30.342Z Response deadline: 2026-11-19T22:00:00.000Z The City of Seattle is seeking qualifications for On-Call Elevator Assessment, Modernization or Replacement and Construction Administration Services . Qualifications are due no later than 2:00 pm on Thursday, November 19, 2026 . All questions are to be submitted through the e-procurement portal at https://procurement.opengov.com/portal/seattle no later than 5:00 pm on Thursday, November 12, 2026 . Scope of Work Scope of Work for Elevator Assessment, Modernization or Replacement and Construction Administrative Serivces FAS/CD is seeking two teams of qualified professional firms for on-call elevator Assessment, Modernization or Replacement and Construction Administration services. The preferred Consultation Teams would include, but are not limited to, Architectural, Structural, Elevator and MEP, disciplines. Services would include preparation and completion of elevator modernization scopes of work to existing elevator(s), or to design new elevator installations to replace existing elevators, all in occupied buildings. CD may also require on an as-needed basis, elevator repair technical and maintenance review advisory services. Typical assessments would include the following items but would be customized based on each project's conditions. This project will include the production of a feasibility assessment report to outline recommended elevator replacement and improvements to existing equipment, finishes, controls, shafts and communication devices and integration into existing building systems. The assessment report will provide scope definition, options, and recommendations to upgrade and modernize elevators to improve operation, reliability and system performance. Site visits to verify conditions and gather information shall be coordinated by the City’s project manager. This type of work is complex in its nature. In order to produce a thorough Feasibility Assessment Report, there are several different systems and standards that will be reviewed. Please see a more detailed list below of the anticipated areas of analysis: Architecture Analysis Provide project oversight and team coordination/support. Review existing conditions. Evaluate and identify interior cab, elevator lobby areas for deficiencies, including damaged finishes, code compliant general signage, general lighting levels. Review documents and plans for code compliance. Project Management Assistance/QA: Work with team to identify milestone delivery dates. Review completeness of deliverables. Assist with coordination meetings and provide meeting minutes. Elevator and Vertical Conveyance Analysis: Review all onsite maintenance records and other applicable documents provided by the Client, including the past (twelve) 12 months of preventive maintenance, repairs, callbacks, and testing. Results will be compared to industry standards for equipment type, age, and condition. Assessment of the existing maintenance contract, comparing past performance with coverage requirements as well as the current pricing, terms and conditions (to be provided after execution of the LOA). A visual review of the equipment, hoistways and machine rooms will be performed to determine overall condition, quality and level of maintenance, and the anticipated life expectancy. Areas of focus will include, but not be limited to: Cleanliness, Testing, Lubrication, and Maintenance Control Plan (MCP) Documentation, and Performance. A thorough review of conditions of elevators pits to include water intrusion, sumps, sump motors, water intrusion repairs or mitigations, code compliance for modern elevator pit functions. Performance of each unit will be compared to requirements included in the existing maintenance contract, capabilities for the type of equipment. Summary of the overall condition of the equipment, maintenance evaluation, and life expectancy with estimated costs and recommended schedule for repairs and modernization for planning purposes. Summary of related building components that will need to be added or replaced to meet applicable Code requirements as part of any modernization project. Provide a list of deficient items that need to be addressed by either the Client or the elevator maintenance provider along with the following: Performance deviations, lubrication, necessary repairs or adjustments, deferred maintenance, and testing. Review mainline power data, provided by others, to ensure compatibility with prospective new equipment. Review will include communication with each approved manufacturer to understand product limitations, if any, due to any power abnormalities within the mainline power data. Baseline power analysis/power quality, recommendations on suitability of control options (such as destination control), elevator harmonic and regeneration evaluation. A code compliance evaluation including changes to emergency communications requirements. An Accessibility standards compliance evaluation, including all accessibility requirements per the NEW ICC A117.1-2017 and that the screens are between 48 and 60 inches (if applicable). Comparison of your findings to the existing maintenance agreement requirements. Provide a separate document that can be provided to the maintenance provider that includes deficient maintenance items for their review. HVAC Systems Analysis: Review impacts of proposed elevator equipment upgrades to HVAC systems supporting the dedicated elevator spaces. Recommendations for modifications of existing equipment or new equipment to support proposed elevator equipment upgrades. Review of supply/exhaust air systems including ductwork for shaft pressurization. Maintenance audit of mechanical equipment serving elevator machine rooms and shafts. Code synopsis and study. Plumbing System Analysis: Sanitary waste and vent piping is to be assessed. Connections for any new sump pumps will be reviewed. Any existing equipment is assumed to be able to be grandfathered in. Electrical Power Systems: Electrical usage from Seattle City Light (if available). Code analysis and establish code versions for permitting. Field Investigate and document existing normal and emergency electrical distribution systems serving elevators. Surge protections analysis and recommendations to meet code requirements. Evaluate existing elevator current protection devices, controllers, devices and components. Evaluate electrical equipment SCCR ratings and provide recommendations for future upgrades if SCCR rating is inadequate. Evaluate code required receptacles in machine r Procurement Contact Information Procurement Contact: Nigel Horton , Senior Project Manager , nigel.horton@seattle.gov , (206) 867-0531 Qualifications are to be submitted through the e-Procurement portal at https://procurement.opengov.com/portal/seattle , no later than 2:00 pm on Thursday, November 19, 2026 . Unless authorized by the Procurement Contact, no other City official or employee may speak for the City regarding this solicitation until award is complete. Any Respondent contacting other City officials or employees does so at Respondent’s own risk. The City is not bound by such information. Purpose and Background The City of Seattle Finance and Administrative Services, Capital Development (FAS/CD) division owns and maintains elevators throughout approximately 120 buildings across the City. As such, there is a continuous need for elevator assessment, modernization and replacement to ensure the safety and functionality of these facilities. Solicitation Objectives The City expects to achieve the following outcomes through this consultant solicitation: Establishment of 2 On-Call Elevator Assessment, Modernization or Replacement and Construction Administration services contracts that will be valid through 2031. Identify teams of professionals who will be available to perform studies, preliminary engineering, design phase and construction administration. Ensure access to experienced On-Call professionals with the desired background in Section 5. Scope of Work. Determine the teams who can best serve the City's on-call needs as they come. Minimum Qualifications Minimum qualifications are required for a Consultant to be eligible to submit a proposal response. Your submittal response must show compliance to these minimum qualifications. Those that are not responsive to these qualifications shall be rejected by the City without further consideration: Consultant has completed at least 3 projects that included Elevator Assessment, Modernization or Replacement and Construction Administration services in the last ten (10) years. Provide three (3) references: previous clients / owners / architectural partners that have worked with your firm in the last ten (10) years to demonstrate client satisfaction. Include contact name, phone number and address and name of project(s). Exclude any references within City of Seattle Finance and Administrative Services Capital Development Division. Lead team members for the prime consultant, as well as any subconsultants, must work in an office within 50 miles of downtown Seattle. Contract Modifications The City consultant contract is attached (See Attachments Section). Consultants submit proposals understanding all Contract terms and conditions are mandatory. Response submittal is agreement to the Contract without exception. The City reserves the right to negotiate changes to submitted proposals and to change the City's otherwise mandatory Contract form during negotiations. If the Consultant is awarded a contract and refuses to sign the attached Contract form, the City may reject the Consultant from this and future solicitations for the same work. Under no circumstances shall Consultant submit its own boilerplate of terms and conditions. Procedures and Requirements This section details City instructions and requirements for your submittal. The City reserves the right in its sole discretion to reject any Consultant response that fails to comply with the instructions. Registration into the City's Procurement Portal If you have not previously done so, register at: https://procurement.opengov.com/portal/seattle , then subscribe to the City’s Procurement Portal. The Procurement Portal is used by City staff to identify companies for future solicitation lists and check certifications. Women- and minority-owned firms are asked to self-identify their business as such in OpenGov. Registration in the City's Procurement Portal is required to submit a response to this solicitation. Pre-Submittal Conference The City offers an optional pre-submittal conference at the time, date and location on the Timeline. Respondents are highly encouraged to attend but not required to attend to be eligible to submit their qualifications. The meeting answers questions about the solicitation and clarifies issues. This also allows Respondents to raise concerns. Failure to raise concerns over any issues at this opportunity will be a consideration in any protest filed regarding such items known as of this pre-submittal conference. Questions Respondents may submit their questions through the Procurement Portal. Respondents may also email questions to the Procurement Contact until the deadline stated in the Timeline. Failure to request clarification of any inadequacy, omission, or conflict will not relieve the Consultant of responsibilities under any subsequent contract. It is the responsibility of the interested Consultant to assure they receive responses to questions if any are issued. Changes to the RFQ The City may make changes to this RFQ if, in the sole judgment of the City, the change will not compromise the City’s objectives in this solicitation. Any change to this RFQ will be made by formal addendum issued by the City, through the Procurement Portal at https://procurement.opengov.com/portal/seattle and shall become part of this RFQ. Receiving Addenda and/or Question and Answers It is the obligation and responsibility of the Consultant to learn of addenda, responses, or notices issued by the City, through the Procurement Portal. Some third-party services independently post City of Seattle solicitations on their websites. The City does not guarantee that such services have accurately provided all the information published by the City. All submittals sent to the City may be considered compliant with or without specific confirmation from the Consultant that any and all addenda was received and incorporated into your response. However, the Project Manager reserves the right to reject any submittal that does not fully incorporate Addenda that is critical to the project. Qualifications Submittal Responses must be received by the City no later than the date and time in the Timeline, except as revised by Addenda. The submitter has full responsibility to ensure the response is submitted to the City's Procurement Portal within the deadline. The Procurement Portal will not allow vendors to upload submissions past the deadline. Respondent Responsibility to Provide Full Response It is the Respondent's responsibility to respond in a manner that does not require interpretation or clarification by the City. The Respondent is to provide all requested materials, forms and information. The Respondent is to ensure the materials are submitted properly and accurately reflect the Respondent’s qualifications. During scoring and evaluation (prior to interviews if any), the City will rely upon the submitted materials and shall not accept materials from the Respondent after the RFQ deadline; this does not limit the City’s right to consider additional information (such as references that are not provided by the Respondent but are known to the City, or past City experience with the consultant), or to seek clarifications as needed. Prohibited Contacts Respondents shall not interfere in any way to discourage other potential and/or prospective consultants from submitting or considering participation in the submittal process. Prohibited contacts includes but is not limited to any contact, whether direct or indirect (i.e. in writing, by phone, email or other, and by the Respondent or another person acting on behalf of the Respondent) to a likely firm or individual that may discourage or limit competition. If such activity is evidenced to the satisfaction and in sole discretion of the City department, the Respondent that initiates such contacts may be rejected from the process. License and Business Tax Requirements The Consultant must meet all applicable licensing requirements immediately after contract award or the City may reject the Consultant. Companies must license, report and pay revenue taxes for the Washington State business License (UBI#) and Seattle Business License, if required by law. Carefully consider those costs before submitting an offer, as the City will not separately pay or reimburse such costs. Seattle Business Licensing and associated taxes If you have a “physical nexus” in the city, you must obtain a Seattle Business license and pay all taxes due before the Contract can be signed. A “physical nexus” means you have physical presence, such as: a building/facility/employee(s) in Seattle, you make sales trips into Seattle, your own company drives into Seattle for product deliveries, and/or you conduct service work in Seattle (repair, installation, service, maintenance work, on-site consulting, etc). We provide a Consultant Questionnaire Form in our submittal package items later in this RFP/RFQ, and it will ask you to specify if you have “physical nexus”. All costs for any licenses, permits and Seattle Business License taxes owed shall be borne by the Consultant and not charged separately to the City. The apparent successful Consultant(s) must immediately obtain the license and ensure all City taxes are current, unless exempted by City Code due to reasons such as no physical nexus. Failure to do so will cause rejection of the submittal. The City of Seattle Application for a Business License and additional licensing information can be found this page here: https://www.seattle.gov/city-finance/business-taxes-and-licenses/business-licenses For Questions and Assistance, call the Revenue and Consumer Protection (RCP) office which issues business licenses and enforces licensing requirements. The general e-mail is tax@seattle.gov . The main phone is 206-684-8484. Self-Filing You can pay your license and taxes on-line https://www.filelocal-wa.gov/Default_FileLocal.aspx If a business has extraordinary balances due on their account that would cause undue hardship to the business, the business can contact the License and Tax Administration office at tax@seattle.gov or 206-684-8484 to request additional assistance. Those holding a City of Seattle Business license may be required to report and pay revenue taxes to the City. Such costs should be carefully considered by the Consultant prior to submitting your offer. When allowed by City ordinance, the City will have the right to retain amounts due at the conclusion of a contract by withholding from final invoice payments. State Business Licensing Before the contract is signed, you must have a State of Washington business license (a “Unified Business Identifier” known as a UBI#). If the State of Washington has exempted your business from State licensing (some foreign companies are exempt and sometimes, the State waives licensing because the company has no physical presence in the State), then submit proof of that exemption to the City. All costs for any licenses, permits and associated tax payments due to the State because of licensing shall be borne by the Consultant and not charged separately to the City. Instructions to apply for a business license can be found at https://dor.wa.gov/open-business/apply-business-license and the State of Washington Department of Revenue contact help page at https://dor.wa.gov/contact . Federal Excise Tax The City is exempt from Federal Excise Tax. No Guaranteed Utilization The City does not guarantee utilization of any contract(s) awarded through this RFQ process. The solicitation may provide estimates of utilization; such information is for Consultant convenience and not a usage guarantee. The City reserves the right to issue multiple or partial awards, and/or to order work based on City needs. The City may turn to other appropriate contract sources or supplemental contracts to obtain these same or similar services. The City may re-solicit for new additions to the Consultant pool. Use of such supplemental contracts does not limit the right of the City to terminate existing contracts for convenience or cause. Expansion Clause The contract limits expansion of scope and new work not expressly provided for within the RFQ. Expansion for New Work (work not specified within the original Scope of Work Section of this Agreement, and/or not specified in the original RFQ as intended work for the Agreement) must comply with the following: (a) New Work is not reasonable to solicit separately; (b) is for reasonable purpose; (c) was not reasonably known by the City or Consultant at time of solicitation or was mentioned as a possibility in the solicitation (i.e. future phases of work, or a change in law); (d) is not significant enough to be regarded as an independent body of work; (e) would not attract a different field of competition; and (f) does not change the identity or purpose of the Agreement. The City may make exceptions for immaterial changes, emergency or sole source conditions, or other situations required in City opinion. Certain changes are not subject to these limitations, such as additional phases of Work anticipated during solicitation, time extensions, and Work Orders issued on an On-Call contract. Expansion must be mutually agreed and issued by the City through written Addenda. New Work performed before an authorizing Amendment may not be eligible for payment. The City reserves the right t Source: OpenGov https://procurement.opengov.com/portal/seattle/projects/284217 Canonical URL: https://govcontractfinder.com/contracts/on-call-elevator-assessment-modernization-or-replacement-and-opengov-12-project-284217