On-Call Shuttle Services State and local opportunity open Cincinnati/Northern Kentucky International Airport 26-065-ITB - Services Posted: 2026-11-27T13:00:00.930Z Response deadline: 2026-12-17T19:00:00.000Z The Kenton County Airport Board (“KCAB”) will receive proposals for On-Call Shuttle Services . Questions are due at 11:59 pm on Monday, December 7, 2026 and answers will be posted no later than Thursday, December 10, 2026 at 11:59 pm . Proposals must be received by Thursday, December 17, 2026 at 2:00 pm . No proposals will be accepted after that time unless such date or time is extended pursuant to an addendum issued by KCAB. Shuttle Service -Attach pricing in the Vendor Questionnaire Tab SCOPE OF SERVICES Scope of Services The successful bidder ("Contractor") must provide the following shuttle services on an on-call basis: Provide transportation between the Terminal and on-airport parking lots on an as-needed basis. Must respond to request for availability. The first responder with availability that meets needs will be confirmed. If service is not required immediately, KCAB may at its discretion, place the responsive contractor on standby status. In this case, the Contractor must specify the length of standby time that may be provided without charge. KCAB will pay an hourly rate for the time period a shuttle is providing service (does not include travel time to and from CVG). Contractor must be willing to provide service as needed and available 24/7/365 Shuttles must be able to accommodate a minimum of 11 passengers plus luggage; larger preferred Service may be cancelled if the need is not there as the shift approaches. Must be able to display professional looking signage informing what service is being provided/route information. Contractor will be responsible for insuring shuttles and drivers Contractor is responsible for providing professional drivers and vehicles. Driver Communication: Contractor must be able to maintain continuous communication with its driver(s) while operating at CVG and be capable of contacting the assigned driver at all times during service and standby periods. Contractor must describe the communication method(s) that will be used (e.g., cellular phone, two-way radio, dispatch software, GPS tracking, or similar technology) to ensure reliable and immediate contact with driver(s). Timeliness and Scheduling Requirements: The Contractor must ensure that all scheduled services are performed in accordance with the agreed-upon schedule and that drivers arrive at the designated location on time. If the Contractor becomes aware that a driver will not meet the scheduled arrival time, the Contractor must immediately notify the Airport, provide the reason for the delay, and communicate the estimated arrival time. Late arrivals, or early departures without prior authorization from the Airport shall be considered a breach of contract and may result in liquidated damages of $100 per hour , for each occurrence. In addition, the Airport reserves the right to engage the next available qualified operator or alternate service provider to maintain operational continuity. Minimum eligibility requirements: Contractor must possess all federal, state, and local licenses, permits, and certifications required to perform the services contemplated under this ITB. The Contractor shall ensure that all vehicles utilized in the performance of the resulting contract are properly registered, licensed, insured, and compliant with all applicable federal, state, and local laws, regulations, and safety requirements. Failure to maintain such compliance may result in disqualification, contract suspension, or termination. The Minimum eligibility requirements can be found in the KCAB Rules and Regulations link: RULE 500.00: MOTOR VEHICLE OPERATIONS Bid Requirements Contractor must have been in business more than 3 years, providing on demand transportation and pre-arranged services Each bid must include the following written information: A separate document that provides the following information: Sizes, features, and quantities of shuttles able to provide to meet the requirements of this contract minimum notice timeframe required to provide service guaranteed time to respond with availability Provide the proposed hourly rate schedule for each type of shuttle that may be provided. List the passenger seating capacity plus luggage. Provide photos of actual buses in your fleet that may be used. NOTICE TO BIDDERS NOTICE TO BIDDERS Pursuant to KRS 424.260 and KRS 183.142, the Kenton County Airport Board (“KCAB”) will receive bids for On-Call Shuttle Services at the Cincinnati/Northern Kentucky Int’l Airport (“CVG”). Bids will be received no later than Thursday, December 17, 2026 , at 2:00 pm . No bids will be accepted after that time unless such date or time is extended pursuant to an addendum issued by KCAB. KCAB reserves the right to waive any informality or irregularity in any proposal or bid guaranty, to reject any or all proposals, to award or refrain from awarding a contract for the work, and to negotiate with the apparent qualified responsible proposer to such extent as may be beneficial to KCAB. Preference for Kentucky resident bidders will be applied in accordance with Kentucky law. Further information and copies of the Invitation to Bid (ITB) may be downloaded from our website www.cvgairport.com/bids - KCAB's e-Procurement Portal. KENTON COUNTY AIRPORT BOARD Lawrence J. Krauter, Chief Executive Officer CINCINNATI /NORTHERN KENTUCKY INTERNATIONAL AIRPORT Hebron , KY 41048 GENERAL INFORMATION & BID INSTRUCTIONS SCHEDULE OF EVENTS Release Project Date: November 27, 2026 Deadline For Questions To Be Submitted: December 7, 2026, 11:59pm Answers To Questions Issued: December 10, 2026, 11:59pm Proposals Due: December 17, 2026, 2:00pm KCAB reserves the right to modify or alter the schedule of events to such extent as may be beneficial to KCAB. AUTHORITY TO RELEASE KCAB is the sole entity with the authority to issue and/or distribute any solicitation documents and/or related information. All solicitation documents obtained from any source other than KCAB may be incomplete or incorrect. KCAB assumes no responsibility for any error, omission or misinterpretation resulting from the reliance or use of any Solicitation Documents not issued and distributed by KCAB. All solicitation documents are posted on KCAB’s e-procurement portal at: https://procurement.opengov.com/portal/cvgairport BACKGROUND The Kenton County Airport Board (“KCAB”) is soliciting bids for the On-Call Shuttle Services at the Cincinnati/Northern Kentucky International Airport (“CVG”). The Parking & Ground Transportation Department provides transportation for passengers between CVG terminals and on-airport parking lots and may have a need for shuttle services to provide this transportation on an as needed basis. SUBMISSION OF BIDS Responses to this ITB must be submitted electronically through KCAB’s online bidding system which can be accessed at https://procurement.opengov.com/portal/cvgairport . Select the project titled On-Call Shuttle Services (Invitation # 26-065-ITB - Services ) and follow the instructions for submittal. The completed and signed bid (together with all required attachments) must be transmitted and received through OpenGov no later than Thursday, December 17, 2026 at 2:00 pm Eastern Time (ET). Bidders should allow for sufficient time to upload and transmit all required information. Proposer is solely responsible to ensure its submission is transmitted prior to the due date and time. KCAB will not accept submissions after the due date and time and is not responsible for any error in transmission including but not limited to power outage, internet connectivity, unauthorized access, etc. BID QUESTIONS KCAB is not bound by, and bidders may not request or rely on any oral interpretation or clarification of this RFP. Therefore any questions regarding this ITB are encouraged and must be submitted electronically using the Question and Answer tab of this ITB on KCAB’s online bidding system, which can be accessed at https://procurement.opengov.com/portal/cvgairport . Questions received on or before the Deadline to Submit Questions in the Schedule of Events will be posted on the Question and Answer tab of this ITB on the bidding system per the Schedule of Events. Answers to questions from any bidder will be available to all proposers. All communications regarding this solicitation must only be through the Questions and Answers section of the ITB or through the Contract and Procurement Administration Department. No communication is to be directed to any other KCAB personnel unless otherwise instructed by the Contract and Procurement Administration Department. Failure to comply may result in the disqualification of proposer’s submittal. ADDENDA In the event it becomes necessary to revise, change, modify or cancel this ITB or to provide additional information, addenda will be issued to all recipients of this ITB. KENTUCKY OPEN RECORDS ACT Each bidder must specifically identify any portion of its bid which it deems confidential, or which contains proprietary information, patents, copyrights or trade secrets. Bidder should provide justification of what material should not be disclosed, upon request, by KCAB to a third party. All documents received by KCAB are subject to general inspection under the provisions of Kentucky Revised Statutes Chapter 61.870 et seq, the “Kentucky Open Records Act”, subject to very narrow exceptions. These statutes may require disclosure of documents a bidder deems confidential. KCAB may otherwise use or disclose the data submitted by each bidder for any purpose, unless such data is so identified as confidential or proprietary by the bidder. The bidder's opinion of proprietary information is not binding upon KCAB. ACCEPTANCE PERIOD Bids in response to this ITB must indicate it is valid for a period no less than one hundred twenty (120) days from the closing date. AWARD KCAB intends to award a contract or contracts resulting from this solicitation to the responsible bidder(s) whose bid represents the best value after evaluation. KCAB reserves the right to waive any informality or irregularity in any bid guaranty, to reject any or all bids, to award or refrain from awarding a contract for the work, and to negotiate with the apparent qualified responsible bidder to such extent as may be beneficial to KCAB. KCAB intends to evaluate bids and may award a contract without discussions with bidders. Therefore, the bidder's initial bid should contain the bidder's best terms from a cost or price and technical standpoint. KCAB reserves the right to make an award on any item for a quantity less than the quantity offered, at the unit cost or prices offered. KCAB reserves the right to make multiple awards if, after considering the bids submitted, it is in KCAB’s best interest to do so. The successful bidder will be required to enter into a contract substantially in the form of the contract included under the ATTACHMENTS Tab and incorporated by reference. All proposers are required to note any exception(s) to the Invitation to Bid or the attached contract and are required to specifically state the exception(s) and the reason(s) for the exception(s). No exceptions will be recognized to the Government Clauses section of the proposed contract. If no exceptions to the contract are included in the bidder's response, the bidder is expected to execute the contract in the form set forth herein. Final acceptance of a bid and contract is contingent upon reaching a mutually satisfactory agreement regarding noted exceptions. If an acceptable and timely agreement is not reached, KCAB reserves the right to disqualify the bidder and to reevaluate the remaining bids. KCAB reserves the right to refuse to negotiate with a successful bidder on any item not specifically excepted in its submittal. KCAB will have the right, at its sole election, to alter the specifications and/or frequencies of services required and tailor the contract price to said change (increase or decrease). The term of the agreement will be for one (1) year with an option to renew for three (3) additional one-year terms optional . PERFORMANCE AND PAYMENT The successful bidder shall issue an invoice one (1) invoice per month for work performed along with supporting data. KCAB will pay submitted invoices on a net 30 basis subject to the terms of the attached agreement. BADGES AND KEYS Contractor shall badge a sufficient number of employees to satisfactorily complete its obligations under this contract regardless of circumstances. This will require a background check made through a fingerprint process. When determining the number of employees to badge, Contractor must consider absent employees due to illness, vacation, employment termination, or other reasons, emergency/on call situations, and supervisors who need access for inspection/supervision visits. Contractor is responsible for the cost of badging. The current fee for identification badges is $44.00 per badge for the badge, security threat assessment, and for fingerprinting. Contractor shall return all badges upon expiration or termination of the contract whichever is earlier. Additionally, Contractor shall immediately return an employee’s badge when that employee is no longer employed by Contractor. Contractor shall pay $100.00 per badge for each badge not returned within ninety (90) days from the date the Contractor is required to return the badge(s). Contractor is responsible for all keys or badges issued to Contractor’s employees. Such keys or badges may not be duplicated. Contractor shall return any or all keys or access cards to KCAB when requested by KCAB. If the loss of keys or access cards requires changing the combination of locks or changing other access equipment, the cost of such labor and material may be charged to Contractor at the discretion of KCAB. Replacement of lost or damaged keys or badges will be provided at Contractor’s expense. Any fines or civil penalties assessed to KCAB caused by Contractor negligence is the responsibility of Contractor. Badge replacement is at the sole discretion of KCAB. A $100.00 fee will be assessed per lost badge. In the event a Contractor’s employee loses a second badge, the Contractor shall pay $200.00. If a third badge is lost, the badge will only be renewed with permission of the Airport Security Coordinator and the Contractor shall pay $300.00. If necessary, KCAB will provide initial supply of keys after receipt of a $500.00 deposit from Contractor. In the event Contractor loses or duplicates a key(s), KCAB will charge the cost of rekeying the lock(s) of the corresponding area against the $500.00 deposit. Contractor shall be responsible for the full cost of rekeying if Contractor loses or duplicates a key. Any funds remaining of this $500.00 deposit upon termination of the contract will be returned to contractor upon KCAB’s receipt of all keys. Contractor shall be responsible for obtaining, maintaining, safeguarding, and returning all Airport-issued access credential. In the event a Contractor’s employee loses or unreturning an access credential, the Contractor shall pay $50.00 per credential. RECORDS/FINANCIALS In submitting bids on any item to be purchased by KCAB, the bidder hereby agrees to make available any and all records, books of account, correspondence, or other information reasonably necessary to enable KCAB or its designated agents to investigate the responsibility of the bidder in terms of its financial status, capacity to produce, sources of supply, performance record in the business or industry, and any other matter reasonably related to the proposer’s probable ability to perform adequately under a contract if it is awarded to the bidder. GRATUITIES AND KICKBACKS It is a breach of ethical standards for any person to offer, give, or agree to give any employee or former employee, or for any employee or former employee to solicit, demand, accept, or agree to accept from another person, a gratuity or an offer of employment in connection with any decision, approval, disapproval, recommendation, preparation of any part of a program requirement or a purchase request, influencing the content of any specification or procurement standard, rendering of advice, investigation, auditing, or in any other advisory capacity in any proceeding of application, request for ruling, determination, claim or controversy, or other particular matter, pertaining to any program requirement or a contract or subcontract, or to any solicitation or proposal therefore. It is a breach of ethical standards for any payment, gratuity, or offer of employment to be made by or on behalf of a subcontractor under a contract to the prime vendor or higher tier subcontractor or any person associated therewith, as an inducement for the award of a subcontract or order. In the event that any gratuities or kickbacks are offered or tendered to any KCAB employee, the proposal shall be disqualified and shall not be reinstated. NON-COLLUSIVE VENDOR CERTIFICATION By the submission of this proposal, the proposer certifies that: The proposal has been arrived at by the proposer independently and has been submitted without collusion with any other vendor. The contents of the proposal have not been communicated by the proposer, or, to its best knowledge and belief, by any of its employees or agents, to any person not an employee or agent of the proposer or its surety on any bond furnished herewith and will not be communicated to any such person prior to the official opening of the proposal. No proposer may submit more than one proposal for this purchase. It shall be the responsibility of each proposer to obtain the prior written permission of KCAB before proposal opening in every situation in which the proposer, due to corporate association or other affiliation, may be found to be impermissibly associated with another vendor. Failure to observe this requirement could result in all such affiliated proposals being rejected. BID CONDITIONS AND PROVISIONS The terms and conditions of this request for proposal (ITB) include all general and special conditions as enumerated herein. All participating proposers agree to comply with all of the conditions, requirements and instructions of this ITB as stated or implied herein. Any alteration, erasure or interlineation by the proposer in this proposal constitutes cause for rejection by KCAB. Should KCAB omit anything from this ITB which is necessary to a clear understanding of the work, or should it appear that various instructions are in conflict, then the proposer shall notify the Contract and Procurement Administration Department prior to the deadline for question submissions as per the time and date shown in the Schedule of Events. Typographical errors in entering quotations on this proposal may result in the disqualification of this proposal. All proposers are required to complete all information requested in this proposal. Failure to do so may result in the disqualification of proposal. Unit price for each item must be shown for the unit of measurement indicated. In case of error in extension of prices, the unit price governs. Each proposer shall fully acquaint and familiarize themselves with the conditions as they exist and the character of the operations to be carried on under the proposed contract and make such investigations as the proposer may see fit so that the proposer shall fully understand the facilities, physical conditions and restrictions associated with the services. The successful proposer shall comply with all of the specifications, terms and conditions of this ITB. KCAB is not liable for any costs incurred by proposer in the preparation of proposals or for any work performed in connection therein. PRICING PROPOSAL PRICING PROPOSAL Pricing must be all-inclusive, firm fixed for one (1) year , and delivered to the address specified inclusi Source: OpenGov https://procurement.opengov.com/portal/cvgairport/projects/291082 Canonical URL: https://govcontractfinder.com/contracts/on-call-shuttle-services-opengov-1295841048-project-291082