Orange Park Neighborhoods - Milling and Resurfacing State and local opportunity open Clay County 26/27-004 Posted: 2026-10-19T14:57:16.192Z Response deadline: 2026-12-03T21:00:00.000Z Clay County is soliciting bids from qualified contractors to provide milling and resurfacing improvements for various roadways within Orange Park neighborhoods in Clay County, Florida. The Work generally consists of milling existing asphalt pavement, placement of SP-9.5 Traffic Level C asphaltic concrete, tack coat, pavement markings, maintenance of traffic, cleanup, and associated work necessary to complete the Project in accordance with the Contract Documents and applicable FDOT standards and specifications. The Project includes improvements to multiple residential roadways and requires the Contractor to coordinate operations to maintain residential and emergency access at all times. The Contractor shall furnish all labor, materials, equipment, supervision, quality control, traffic control, and incidentals necessary to complete the Work within the required Contract Time. Bidders shall submit all inquiries regarding this RFB in the "Question and Answer" tab of the RFB. See "Inquiries/Questions" in the "Instructions to Bidders" below for more information. Bidders are prohibited from contacting, by any means, whether orally, telephonically, electronically or in writing, any member of the Board, any County employee, including the County Manager, the County Attorney or the Commission Auditor, any member of the designated Evaluation Committee or any agent of the County regarding the Request for Bids in any respect during the Request for Bid Period. The Request for Bid Period during which no contact may occur commences from the date of publication of the notice of a Request for Bids and ends upon a Bid Decision becoming final, i.e. after the notice of bid protest period of 72 hours has expired. However, in the event of a notice of protest, the no contact rule continues in place during the Protest Period and does not end until a resolution of the protest has occurred and become final. The following exceptions exist to the no-contact rule: Inquiries may be submitted to the Purchasing Department if specifically provided in the Request for Bids; Pre-bid conferences provided for in the Request for Bids; and Formal presentations by Bidders to the designated Evaluation Committee or to the Board or any committee thereof specifically contemplated in the Request for Bids. The Board reserves the right and power to reject any and all Bids without cause and to waive technical and non-technical or non-material defects in the Request for Bids or submittal of any Bid, and in its discretion to re-advertise the Request for Bids. The Board reserves the right to award Request for Bids which would be in the Best Interest of the County. Interested vendors are advised that the Clay County Board of County Commissioners has a local preference policy and Buy American policy. The complete policy for both can be viewed at: https://www.claycountygov.com/government/purchasing/vendor-information. FOLLOWING THE BID OPENING AND TABULATION, A “NOTICE OF INTENT TO AWARD BID” OR A “NOTICE OF REJECTION OF ALL BIDS” WILL BE POSTED ON THE INTERNET AT: https://procurement.opengov.com/portal/claycounty?status=all. THIS WEBPAGE CAN ALSO BE ACCESSED FROM THE HOMEPAGE OF THE COUNTY’S WEBSITE AT: https://www.claycountygov.com/government/purchasing/formal-bid-solicitations PROSPECTIVE BIDDERS ARE NOTIFIED THAT THE FAILURE TO INCLUDE A PROPER BID BOND OR OTHER SECURITY APPROVED UNDER THE COUNTY’S PURCHASING POLICY, IF REQUIRED FOR THIS REQUEST, WILL RESULT IN REJECTION OF THE BID AND SHALL, AS WELL AS THE FAILURE TO FILE A WRITTEN NOTICE OF PROTEST AND TO FILE A WRITTEN PETITION INITIATING A FORMAL PROTEST PROCEEDING WITHIN THE TIMES AND IN THE MANNER PRESCRIBED IN CHAPTER 8, SECTION I OF THE COUNTY’S PURCHASING POLICY SHALL, CONSTITUTE A WAIVER OF THE RIGHT TO PROTEST THE BID REQUEST, ANY ADDENDUM THERETO, OR THE BID DECISION, AS APPLICABLE, AND TO INITIATE A FORMAL PROTEST PROCEEDING UNDER THE PURCHASING POLICY. THE COUNTY’S PURCHASING POLICY CAN BE VIEWED AT THE COUNTY’S WEBSITE BY FOLLOWING THE APPROPRIATE LINKS FROM THE HOMEPAGE ADDRESS SET FORTH ABOVE. IF A PROSPECTIVE BIDDER IS IN DOUBT WHETHER THIS REQUEST REQUIRES A BID BOND, SUCH PROSPECTIVE BIDDER IS SOLELY RESPONSIBLE FOR MAKING APPROPRIATE INQUIRY. THE BOARD RESERVES THE RIGHT TO REJECT ANY AND ALL BIDS WITHOUT CAUSE AND TO WAIVE TECHNICAL AND NON- TECHNICAL OR NON-MATERIAL DEFECTS IN THE REQUEST OR SUBMITTAL OF ANY BIDS. A PERSON OR AFFILIATE WHO HAS BEEN PLACED ON THE CONVICTED VENDOR LIST FOLLOWING A CONVICTION FOR A PUBLIC ENTITY CRIME MAY NOT SUBMIT A BID ON A CONTRACT TO PROVIDE ANY GOODS OR SERVICES TO A PUBLIC ENTITY, MAY NOT SUBMIT A BID ON A CONTRACT WITH A PUBLIC ENTITY FOR THE CONSTRUCTION OR REPAIR OF A PUBLIC BUILDING OR PUBLIC WORK, MAY NOT SUBMIT BIDS ON LEASES OF REAL PROPERTY TO A PUBLIC ENTITY, MAY NOT BE AWARDED OR PERFORM WORK AS A CONTRACTOR, SUPPLIER, SUBCONTRACTOR, OR CONSULTANT UNDER A CONTRACT WITH ANY PUBLIC ENTITY, AND MAY NOT TRANSACT BUSINESS WITH ANY PUBLIC ENTITY IN EXCESS OF THE THRESHOLD AMOUNT PROVIDED IN SECTION 287.017, FLORIDA STATUTES, FOR CATEGORY TWO FOR A PERIOD OF 36 MONTHS FROM THE DATE OF BEING PLACED ON THE CONVICTED VENDOR LIST. General Project Requirements Mobilization Maintenance of Traffic (MOT) Canis Drive Milling - Zero to One Inch Asphaltic Concrete SP-9.5 Traffic Level C Tack Coat Pavement Marking, Bi-Directional Raised Painted Pavement Marking, Solid (24") (White) Thermo, Standard, WHITE, SOLID, 24" Carol Drive Milling - Zero to One Inch Asphaltic Concrete SP-9.5 Traffic Level C Tack Coat Painted Pavement Marking, Solid (24") (White) Thermo, Standard, WHITE, SOLID, 24" Draco Street Milling - Zero to One Inch Asphaltic Concrete SP-9.5 Traffic Level C Tack Coat Painted Pavement Marking, Solid (24") (White) Thermo, Standard, WHITE, SOLID, 24" Hilltop Drive Milling - Zero to One Inch Asphaltic Concrete SP-9.5 Traffic Level C Tack Coat Painted Pavement Marking, Solid (24") (White) Thermo, Standard, WHITE, SOLID, 24" Hollis Drive (S, E, N) Milling - Zero to One Inch Asphaltic Concrete SP-9.5 Traffic Level C Tack Coat Painted Pavement Marking, Solid (24") (White) Thermo, Standard, WHITE, SOLID, 24" Lester Drive Milling - Zero to One Inch Asphaltic Concrete SP-9.5 Traffic Level C Tack Coat Painted Pavement Marking, Solid (24") (White) Thermo, Standard, WHITE, SOLID, 24" Lyra Street Milling - Zero to One Inch Asphaltic Concrete SP-9.5 Traffic Level C Tack Coat Painted Pavement Marking, Solid (24") (White) Thermo, Standard, WHITE, SOLID, 24" Meadowbrook Drive Milling - Zero to One Inch Asphaltic Concrete SP-9.5 Traffic Level C Tack Coat Painted Pavement Marking, Solid (24") (White) Thermo, Standard, WHITE, SOLID, 24" Painted Pavement Marking, Double Yellow (6") Thermo, Double Yellow (6") Noel Court Milling - Zero to One Inch Asphaltic Concrete SP-9.5 Traffic Level C Tack Coat Painted Pavement Marking, Solid (24") (White) Thermo, Standard, WHITE, SOLID, 24" Noel Road Milling - Zero to One Inch Asphaltic Concrete SP-9.5 Traffic Level C Tack Coat Painted Pavement Marking, Solid (24") (White) Thermo, Standard, WHITE, SOLID, 24" Charles Pickney Street Milling - Zero to One Inch Asphaltic Concrete SP-9.5 Traffic Level C Tack Coat Painted Pavement Marking, Solid (24") (White) Thermo, Standard, WHITE, SOLID, 24" Oliver Ellsworth Street Milling - Over One Inch to Two Inches Asphaltic Concrete SP-9.5 Traffic Level C Tack Coat Painted Pavement Marking, Solid (24") (White) Thermo, Standard, WHITE, SOLID, 24" Robert Morris Court Milling - Zero to One Inch Asphaltic Concrete SP-9.5 Traffic Level C Tack Coat Painted Pavement Marking, Solid (24") (White) Thermo, Standard, WHITE, SOLID, 24" Parkwood Drive West Milling - Over One Inch to Two Inches Asphaltic Concrete SP-9.5 Traffic Level C Tack Coat Painted Pavement Marking, Solid (12") (White) Painted Pavement Marking, Solid (24") (White) Thermo, Standard, WHITE, SOLID, 12" Thermo, Standard, WHITE, SOLID, 24" Ameca Avenue Milling - Zero to One Inch Asphaltic Concrete SP-9.5 Traffic Level C Tack Coat Painted Pavement Marking, Solid (24") (White) Thermo, Standard, WHITE, SOLID, 24" Scope of Work Purpose Clay County is seeking a qualified Contractor to provide milling and resurfacing improvements for various roadways within Orange Park neighborhoods in Clay County, Florida. The Contractor shall furnish all labor, materials, equipment, supervision, transportation, quality control, maintenance of traffic, and incidentals necessary to complete the Work in accordance with the Contract Documents and applicable Florida Department of Transportation (FDOT) standards and specifications. The Project generally consists of milling existing asphalt pavement at varying depths based on existing roadway conditions and the applicable milling pay items identified in the Pricing Proposal/Schedule of Values (SOV), placement of one and one-half inches (1.5") of SP-9.5 Traffic Level C asphaltic concrete, application of tack coat, pavement markings, maintenance of traffic, cleanup, and associated work necessary for a complete and acceptable Project. The County's intent is to award the Project in its entirety to a single responsive and responsible Bidder, subject to the award provisions established in Section 2.7 of this RFB. Scope The Contractor shall provide all labor, materials, equipment, supervision, transportation, quality control, Maintenance of Traffic (MOT), and incidentals necessary to complete the milling and resurfacing of various neighborhood roadways in Orange Park, Florida. The Work generally includes, but is not limited to: Milling of existing asphalt pavement at varying depths as identified in the Pricing Proposal/Schedule of Values (SOV) and as directed by the County Project Manager; Placement of one and one-half inches (1.5") of SP-9.5 Traffic Level C asphaltic concrete; Application of tack coat; Restoration and installation of applicable painted and thermoplastic pavement markings; Maintenance of Traffic (MOT); Daily cleanup and removal of debris; and All associated work necessary to provide a complete and acceptable Project in accordance with the Contract Documents and applicable FDOT standards and specifications. The Work will be performed on the following roadways: Canis Drive Carol Drive Draco Street Hilltop Drive Hollis Drive (South, East, and North) Lester Drive Lyra Street Meadowbrook Drive Noel Court Noel Road Charles Pinckney Street Oliver Ellsworth Street Robert Morris Court Parkwood Drive West Ameca Avenue The Contractor shall coordinate and sequence the Work to maintain residential and emergency access at all times. Work areas shall be maintained in a safe and clean condition, with debris removed daily. A mandatory final walkthrough with the County Project Manager shall be completed prior to final acceptance. Specific quantities and pavement-marking requirements vary by roadway and shall be as identified in the Pricing Proposal/Schedule of Values (SOV) and Contract Documents. Pre-Qualifications Contractors shall be Florida Department of Transportation (FDOT) Pre-Qualified in the following work classes: Flexible Paving Hot Plant-Mixed Bituminous Courses The above requirements shall also apply to all subcontractors performing work for which the applicable FDOT prequalification is required. General Requirements Milling and Resurfacing Operations The Project shall consist of milling and resurfacing existing asphalt pavement at the roadway locations identified in the Scope of Work. Milling depths will vary based on existing roadway conditions and the applicable milling pay items identified in the Pricing Proposal/Schedule of Values (SOV), as directed by the County Project Manager or designee. Following milling and preparation of the existing pavement, the Contractor shall place one and one-half inches (1.5") of SP-9.5 Traffic Level C asphaltic concrete in accordance with the RFB and current applicable FDOT standards and specifications. M illing Operations Milling shall be performed at varying depths based on existing roadway conditions and within the applicable milling depth ranges identified in the Pricing Proposal/Schedule of Values (SOV), as directed by the County Project Manager or designee, to provide a uniform surface suitable for placement of the proposed asphalt course. The Contractor shall maintain the required pavement profile, cross slope, drainage characteristics, and transitions throughout the limits of Work. The Contractor shall take all necessary precautions to protect existing curb and gutter, drainage structures, manholes, valve boxes, utilities, driveways, sidewalks, and other improvements within or adjacent to the Work. Milled surfaces shall be thoroughly swept and cleaned prior to placement of asphalt or reopening the roadway to traffic. Loose material and milling debris shall be removed from the Work area and shall not be permitted to enter drainage structures or adjacent properties. Asphalt Resurfacing Following milling and preparation of the existing pavement, the Contractor shall place one and one-half inches (1.5") of SP-9.5 Traffic Level C asphaltic concrete in accordance with the Contract Documents and current applicable FDOT requirements. Asphalt mixtures shall be FDOT-certified mixes. The Contractor shall submit applicable job mix formula(s) to the County Project Manager or designee for review prior to placement. The Contractor shall provide smooth transitions between new and existing pavement and shall correct deficiencies, irregularities, segregation, unacceptable joints, or other defective Work at no additional cost to the County. Quality Control The Contractor shall provide qualified Quality Control personnel during milling and paving operations and shall perform all required quality-control activities, testing, documentation, and reporting in accordance with applicable FDOT requirements. Residential and Emergency Access The Contractor shall coordinate and sequence operations to maintain residential and emergency access at all times. Access to residences, adjoining roadways, and other properties within the Project limits shall be maintained throughout construction. Pavement Markings The Contractor shall restore and install pavement markings in accordance with the awarded Contract Documents, Pricing Proposal/Schedule of Values, and applicable FDOT requirements. Painted pavement markings, thermoplastic pavement markings, and raised pavement markers shall be installed at the locations and in the quantities identified in the awarded Contract Documents. When temporary pavement markings are required for traffic safety, they shall be installed prior to reopening the affected roadway to traffic. Final Inspection and Acceptance Upon completion of the Work, the Contractor shall participate in a mandatory final walkthrough with the Clay County Project Manager or designee prior to final acceptance. Any deficiencies identified during the final inspection shall be corrected by the Contractor prior to final acceptance and final payment. Maintenance of Traffic (MOT) The Contractor shall furnish, install, maintain, and remove all Maintenance of Traffic (MOT) devices necessary to safely perform the Work in accordance with the current applicable FDOT Standard Plans/Indexes and the Manual on Uniform Traffic Control Devices (MUTCD). Post-mounted advance warning signs and Portable Changeable Message Signs (PCMS) are not required for this Project. The Contractor shall remain responsible for providing and maintaining safe and adequate MOT throughout the Project in accordance with applicable FDOT standards and requirements. Traffic shall be maintained throughout construction. The Contractor shall maintain access to adjoining roadways, residences, businesses, emergency services, and other properties at all times. The Contractor shall provide all required MOT plans and qualified/certified personnel in accordance with applicable FDOT requirements. A copy of the approved MOT plan shall be maintained onsite during construction. A law enforcement officer shall be provided for nighttime work activities requiring lane or roadway closures. Special Terms and Conditions Unit prices as received shall constitute full compensation to the Contractor for all labor, materials, equipment, supervision, incidentals, and associated activities necessary to complete the Work. No separate payment will be made for work required by the Contract Documents unless specifically identified as a separate pay item. Site Inspections It is incumbent upon all Bidders to examine the site and ensure that they are aware of all conditions that may affect the contract work. The County will not be responsible for conclusions made by the Contractor. No claims for additional compensation will be considered on behalf of any Contractor, subcontractor, materials suppliers or others on account of that person’s failure to be fully informed of all requirements of all parts of this RFB. Work Hours Workdays and hours – Normal work hours of Monday through Friday, 7:00 a.m. to 5:00 p.m. unless approved by the County Project Manager or designee. Any work performed outside of the normal County business hours will require prior County approval and payment to the County for all expenses incurred by the County may be required. Self-Performed Work The awarded Contractor is required to self-perform with its own workforce a minimum of forty-percent (40%) of the overall awarded Contract. Hazardous Materials The Contractor shall notify the County Project Manager or designee of any hazardous materials used or stored on the Work site and shall maintain and provide applicable Safety Data Sheets (SDS) in accordance with applicable federal, state, and local requirements. Any spill or release of hazardous materials or waste caused by the Contractor or its subcontractors shall be immediately reported to the County Project Manager or designee and shall be contained, cleaned up, and disposed of in accordance with all applicable federal, state, and local laws and regulations. All costs associated with the cleanup, remediation, and disposal of any spill or release caused by the Contractor or its subcontractors shall be the sole responsibility of the Contractor at no additional cost to the County. Upon request, the Contractor shall provide documentation demonstrating compliance with applicable regulatory requirements associated with any required cleanup. Permit & Fees The Contractor shall obtain and maintain all permits, licenses, approvals, and inspections required to perform the Work in accordance with the Contract Documents and applicable federal, state, and local requirements. Unless otherwise specified in the Contract Documents, the Contractor shall be responsible for all applications, coordination, permits, inspections, fees, bonds, and other charges necessary to perform and complete the Work. If a County permit is required, the Project is not exempt from permit fees, and applicable fees shall be paid by the Contractor. For questions regarding Clay County permitting, contact: Clay County Building Department Phone: (904) 269-6307 Email: permits@claycountygov.com Website: Clay County Building Department The Contractor shall provide copies of applicable permits and approvals to the County Project Manager upon request and shall comply with all conditions and inspection requirements associated with such permits throughout the Project. Clean up & Restoration of Site The Contractor shall maintain the work site in a clean and safe condition throughout the duration of the Work. At the completion of each daily or nightly operation, the Contractor shall remove milling debris, loose asphalt, excess materials, construction debris, and other waste generated by the Work. The roadway, shoulders, drainage structures, and adjacent work areas shall be cleared of debris and left in a clean and safe condition prior to reopening the roadway Source: OpenGov https://procurement.opengov.com/portal/claycounty/projects/308060 Canonical URL: https://govcontractfinder.com/contracts/orange-park-neighborhoods-milling-and-resurfacing-opengov-4038-project-308060