Outdoor Bottle Filler Fountains State and local opportunity closed County of San Mateo 2027-IFB-00218 Posted: 2026-11-06T23:54:51.136Z Response deadline: 2026-11-19T22:00:00.000Z The County of San Mateo is soliciting bids for outdoor bottle fillers, with installation to be completed by County staff. Vendors must provide accurate lead times and ensure that products meet specified requirements. The intention of this bid is to gather proposals for cost comparison and the County reserves the right to issue an award or purchase order at its discretion. In the event an award is made and a purchase order is issued, the County of San Mateo will notify and work with the awarded vendor. This solicitation does not commit the County to make an award. Neither the submission of a bid or the County's receipt of any bid materials confers any right to the bidder nor any obligation on the County. Email Address for Protests: Protest@smcgov.org 10145 SMSS ADA BOTTLE FILLER- GREEN ATTACHED RECESSED HB W/LOCKING DOOR ATTACHED PET FOUNTAIN FREIGHT AND DELIVERY Scope of Work Summary of Scope of Work To better serve our community, the County of San Mateo is soliciting bids for outdoor water bottle filling stations. Installation will be completed by County staff. Detailed Requirements Outdoor Water Bottle Filling Station -Meets ADA Hi/Lo requirements. -Intuitive design. -Includes recessed hose bib and locking door. -Includes water filter. -Recessed spout. -Attached Pet Fountain -Push button requires less than 5 lbs of pressure to operate. -Weight: approximately 250 lbs. -Color- Green Freight and Delivery For shipping cost purposes, the delivery location will be within the 94063 postal code area. Exact location(s) will be shared with the lowest responsible bidder. Bidder must have the capacity to deliver all items within six weeks of purchase order receipt. Introduction Summary Background Contact Information Timeline Price Bid Sheet Bid Submission, Minimum Qualifications, and Local Preference Ordinance County of San Mateo Bid for: Outdoor Bottle Filler Fountains ( Submit only this Part 3- Bid Documents, including the bid sheet, fully executed, as the bid .) Notice to Bidder Submission Deadline Proposals must be electronically received by 2:00 pm , on Thursday, November 19, 2026 via OpenGov (details below) . Allow sufficient time for the upload to complete by the Due Date and Time. Partial uploads will automatically terminate and proposals will be rejected. The OpenGov submission time will be the official submission time. The County will not be responsible for and shall not accept proposals that are late due to slow internet connections or for any other failure of the OpenGov system. NOTE: The County does not maintain the OpenGov system and is not liable for site failures or technical problems. To resolve technical issues, contact OpenGov using the chat within the portal or email Vendor Support at procurement-support@opengov.com . Late submission will not be considered. Pre-Submission Registration Organizations or individuals interested in responding to this solicitation must register online with the County of San Mateo at: https://procurement.opengov.com/portal/smcgov It is recommended that organizations complete this registration as soon as possible and subscribe to the County of San Mateo for bid opportunities. The County will not be responsible for and shall not accept proposals that are late due to a failure to register in the OpenGov system. Submission via OpenGov Required Documents: BID SUBMISSION Electronic Submissions Include the proposer name and the IFB title and number in each filename. Submit proposals via the OpenGov website, allowing sufficient time for the upload to complete by the Due Date and Time. Partial uploads will automatically terminate and bid will be rejected. The OpenGov submission time will be the official submission time. Contact OpenGov with technical questions regarding the site. The County will not be responsible for and may not accept bid that are late due to slow internet connections or for any other failure of the OpenGov system. Late submissions will not be considered. Conflicts between Certain Requirements Prior to the submission deadlines and solely relating to a determination of the timeliness of questions, comments, and proposal submissions, information displayed on the OpenGov site will take precedence in the event of a discrepancy between that information and the information within the solicitation documents. For all other discrepancies, the information in the solicitation documents will take precedence. Errors in Bids The County will not be liable for any errors in bids. Bids may be rejected as unresponsive if they are late, incomplete, missing pages or information, or cannot be opened for any reason. The County may waive minor irregularities, but such waiver will not modify any remaining IFB requirements. Communications As of the issuance date of this IFB and continuing until it is canceled or an award is made, no proposer or person acting on behalf of a prospective proposer may discuss any matter relating to the IFB with any officer, agent, or employee of the County, other than through OpenGov, to the Authorized Contact Person, or as outlined in the evaluation or protest procedures. Proposers may not agree to pay any consideration to any company or person to influence the award of an Agreement or Purchase Order by the County, nor engage in behavior that may be reasonably construed by the public as having the effect or intent of influencing the award of an Agreement or Purchase Order. Procurement Preference for Local Businesses and Local Non-Profits The County of San Mateo has adopted a Procurement Preference for Local Businesses Ordinance (County Ord. Code Ch. 2.89.) The purpose of this Ordinance is to promote a strong local economy by giving preference to local businesses, local non-profits, local small and micro businesses, and local small and micro non-profits in County procurements, to the extent consistent with the law and interests of the public. The County’s process for applying local preferences to competitive procurements is set forth in County Ordinance Code Section 2.89.030. The Ordinance and exemptions (e.g. the ordinance will be exempt when all bids or proposals received are from Non-Profit Organizations) can be reviewed here: Chapter 2.89 - PROCUREMENT PREFERENCE FOR LOCAL BUSINESSES | Code of Ordinances | San Mateo County, CA | Municode Library The requirements for bidders to establish eligibility for a local preference for this solicitation are detailed below in Section III (Submission Requirements) The Ordinance does not apply if a procurement is determined to be exempt (County Ord. Code sec. 2.89.050), and the County reserves the right to waive application of the Ordinance to this procurement if determined to be in the best interests of the County (County Ord. Code sec. 2.89.060). Evaluation Criteria Bid Evaluation Criteria A Scoring Tabulation will be generated to compile the prices and ranking to determine the awarded bidder. Bids will be evaluated based on the Total Bid Price. All responsive and responsible bidders will be ranked from the lowest to the highest price based on the Total Bid Prices. Award Procedure Notice of Intent to Award Once a decision has been made to award a purchase order or agreement to a bidder, the County will post a Notice of Intent to Award, notifying the remaining bidder of their non-selection. The posting may be inclusion of the recommendation to award as an agenda item on the Board of Supervisors schedule. Protest Procedures Protest of Non-Responsiveness Determination Within five (5) working days of the County's issuance of a notice of non-responsiveness, any firm that has submitted a proposal and believes that the County has incorrectly determined that its proposal is non-responsive may submit a written notice of protest. Such notice of protest must be received by the County on or before the fifth working day following the County's issuance of the notice of non-responsiveness. The notice of protest must include a written statement specifying in detail each and every one of the grounds asserted for the protest. The protest must be signed by an individual authorized to represent the proposer, and must cite the law, rule, local ordinance, procedure or RFP provision on which the protest is based. In addition, the protestor must specify facts and evidence sufficient for the County to determine the validity of the protest. Protest of Purchase Order/Agreement Award Within five (5) working days of the County's issuance of a notice of intent to award the PO/agreement, any firm that has submitted a responsive proposal and believes that the County has incorrectly selected another proposer for award may submit a written notice of protest. Such notice of protest must be received by the County on or before the fifth working day after the County's issuance of the notice of intent to award. The notice of protest must include a written statement specifying in detail each and every one of the grounds asserted for the protest. The protest must be signed by an individual authorized to represent the proposer, and must cite the law, rule, local ordinance, procedure or RFP provision on which the protest is based. In addition, the protestor must specify facts and evidence sufficient for the County to determine the validity of the protest. Delivery of Protests All protests must be received by the due date. If a protest is mailed, the protestor bears the risk of non-delivery within the deadlines specified herein. Protests should be transmitted by a means that will objectively establish the date the County received the protest. Protests or notice of protests made orally (e.g., by telephone) will not be considered. Protests must be delivered to: Protests@smcgov.org Subject: Outdoor Bottle Filler Fountains and 2027-IFB-00218 Standard Terms and Conditions COMMENCEMENT OF PERFORMANCE Written Notice Until the County provides written authorization to commence deliveries of the goods and services specified, there is no contractual agreement between the County and the selected bidder. No verbal instructions or promises are binding on the County. Purchase Orders and Task Orders If the contract anticipates multiple Purchase Orders or Task Orders, the relevant scope of work, payment terms, delivery instructions, period of performance, and any unique contractual terms and conditions may be set forth in the Purchase Orders or Task Orders. Estimated Quantities If this solicitation is for an indefinite quantity contract, any estimates of expected use or quantities provided are for bid purposes only. The County does not guarantee any specific number of orders. Levine Act Disclosure The Levine Act (California Government Code Section 84308) imposes certain requirements on parties contracting with the County of San Mateo related to campaign contributions to County “officers,” including elected County officers and candidates seeking elective office, who may participate in making a decision on certain County contracts. Elected County officers in San Mateo County include: the San Mateo County Board of Supervisors, Assessor-County Clerk-Recorder, County Controller, Coroner, District Attorney, Sheriff, and Tax Collector-Treasurer. Generally, under current County policy, approval by the Board of Supervisors is required for any agreement for services above $200,000, and agreements for services below that threshold may be approved by Department heads. If your proposal is selected, you will be required to certify compliance with the Levine Act. As part of this process, you will need to certify and warrant that you have fully complied, and will remain in full compliance, with all applicable requirements of the Levine Act in connection with the Agreement, including making any required disclosures of campaign contributions to County Officers, which includes but may not be limited to elected County Officers. Elected County Officers include members of the San Mateo County Board of Supervisors, as well as the Assessor-County Clerk-Recorder, Controller, Coroner, District Attorney, Sheriff, and Tax Collector-Treasurer. Any campaign contribution required to be disclosed under the Levine Act in connection with this Agreement shall be disclosed on the County of San Mateo Levine Act Disclosure Form, a copy of which is available from the County upon request. Parties are solely responsible for accurate certification and disclosure. The Levine Act is complex, and this brief description is not legal advice. For example, certain contributions must be aggregated when determining whether contributions have exceeded the $500 threshold. If your proposal is selected, you are urged to review the Levine Act and consider consulting an attorney. PAYMENT Compensation The County will pay the quoted prices as full consideration for Contractor’s full, complete and faithful performance of the Contractor’s obligations under the contract. The County does not accept COD shipments. Payment will be by one of the following methods, as indicated in the Contract Documents: Full payment will be made after the County’s acceptance of goods or services and receipt of a complete invoice, as applicable; or Partial payments will be made in accordance with the schedule set forth in the Scope of Work; or Payments will be invoiced monthly by Contractor in arrears, based upon goods or services provided and at the amounts set forth in the payment schedule up to the maximum amount of the contract; or The County may issue Purchase or Task Orders, which will be paid according to the payment schedule attached to the contract or Purchase or Task Order, or on the County’s receipt and acceptance of the goods and services and receipt and acceptance of a complete invoice; or As otherwise agreed to by the parties. Late Payment Charges The County will not be responsible for late payment charges unless they are stated on the Purchase Order or contract. A payment is late only if payment of an invoice exceeds the time allowed by the payment terms of the Purchase Order or contract. Credits Prior to releasing final payment, the County must be reimbursed for any overpayments, advance payments, or other credits due from the Contractor, and the County may deduct these amounts from payments otherwise due Contractor. Conditions Prerequisite to Payment The County may withhold payment under any of the following circumstance: Contractor, with or without knowledge, made a misrepresentation of substantial and material nature with respect to any information furnished to County; Contractor took any action pertaining to this agreement that required County approval, without having first received County approval; Contractor was or is in default under any of the terms of this contract; The County or any other authorized government entity has requested but has not received and approved any reports, data, audits or other information requested from Contractor, including final reports and documentation due at contract termination. Payment in the event of non-compliance If the County determines that the quantity or quality of the goods provided or work performed is unacceptable, the County will notify Contractor and may withhold payment until correction has been made to County’s satisfaction. If corrections have not been completed after what the County deems a reasonable time, County may make corrections on its own or through a third party, and deduct the cost of replacement or correction from any sums that may be or become due to Contractor on this or any other agreement. No additional payment will be provided to Contractor for replacements or corrections. SHIPPING AND DELIVERY Shipping Unless otherwise directed, all goods are to be shipped FOB destination, freight prepaid, and unloaded to the designated dock or unloading area. The County will have no liability for any items until they are accepted at their final destination by the County. All shipments of goods must include a packing list. Packing lists, packages, shipping notices, and other documents affecting an order must include applicable order numbers, or the orders may be rejected and returned at no cost to the County. Delivery The County will not pay any charge for delivery unless the charge has been expressly included and itemized in the bid or price quote that was accepted by the County. Where shipping addresses indicate room numbers, delivery must be made to that location at no additional charge. SUBCONTRACTOR REIMBURSEMENT AND PAYMENT Payment of Subcontractors Contractor must pay Subcontractors within ten calendar days from receipt of each payment by the County, unless the County agrees in writing to a longer period, or has agreed that the Contractor may hold retainage. Subcontractor Retainage The Contractor, and as applicable, any Subcontractor, must release all retainage withheld from Subcontractors within ten Business Days after the County’s release of retainage to Contractor. The Contractor or its Subcontractors may only withhold retainage on the same terms and conditions as the County withholds retainage from Contractor. Delay or postponement of payment to Subcontractors may take place only for good cause and with the County’s prior written approval. Violation of these provisions may subject the violator to the penalties, sanctions, and other remedies specified in Section 7108.5 of the California Business and Professions Code. This requirement does not impair any contractual, administrative, or judicial remedies otherwise available to the Contractor or Subcontractor. INVOICES General Unless otherwise instructed in writing, invoices are to be handled as follows: On each invoice, include the title of the contract, any applicable Task or Purchase Order number, and a mailing address for payment if electronic fund transfer cannot be made. Submit invoices no later than 45 calendar days after completion of each billing period, or if none is specified, on the later of: completion of a Purchase Order or Task Order, or delivery and County acceptance of goods or services. Payment will be deemed made upon mailing by the County or electronic release of funds. Final Invoice Upon completion of all Deliverables to the satisfaction of the County, submit a final invoice, which together with all previous invoices, may not exceed the maximum amount of the contract. The County will make payment of the final invoice within 30 calendar days of receipt of all required documentation, completion of the Contractor’s obligations (except for warranty performance) and approval of such invoice. Acceptance of final payment releases the County from all further Contractor claims under this contract. INDEPENDENT CONTRACTOR Not a County Employee In performance under this contract, Contractor will act as an independent contractor and not as an employee of the County, which has no control over Contractor’s means, method or manner of performance. No Agency Except as the County may specify in writing, Contractor has no authority, express or implied, to act on behalf of the County in any capacity whatsoever, as an agent or otherwise, or to bind the County or its directors, agents, or employees to any obligation. Employer Responsibilities Contractor has and retains full control over employment, compensation, and discharge of all its employees and is fully responsible for all matters relating to its agents and employees, including all applicable laws and regulations governing employee taxes, withholding, and benefits. INSURANCE Prior to commencing delivery of the goods and services, provide evidence of all required insurance indicated in the solicitation . The required insurance must be maintained for the entire term of the contract. The County’s acceptance of insurance certificates or endorsements that vary from the requirements in this section will not constitute a waiver by the County of strict compliance with the requirements. Acceptability of Insurers Al Source: OpenGov https://procurement.opengov.com/portal/smcgov/projects/324410 Canonical URL: https://govcontractfinder.com/contracts/outdoor-bottle-filler-fountains-opengov-723-project-324410