Ozone Generation Support (Three (3) Year Multiyear Contract) State and local opportunity open County of DeKalb, GA 2026-067-ITB Posted: 2026-11-16T13:00:02.264Z Response deadline: 2026-12-15T20:00:04.873Z The County of DeKalb, GA (the "County"), is soliciting sealed Bids for Ozone Generation Support (Three (3) Year Multiyear Contract) . Bids are to be submitted via the County's eProcurement Portal via https://procurement.opengov.com/portal/dekalbcountyga PRIOR TO 3:00 pm on Tuesday, December 15, 2026 . Late Bids will not be accepted. Project work includes providing professional maintenance, repair, and replacement services for its ozone generation systems. 2026-067-ITB Ozone Generation Support NOTES TO SUPPLIER: 1. Item No. 1: The estimated number of units is based on 3 years of services. Inspection and Maintenance shall occur 4 times per year. 2. Item No. 2: The estimated number of units is based on 3 years of services. Reporting shall occur 2 times per year. 3. Item No. 9: Bidder shall calculate the total amount using the formula below: Total Amount of Parts and Materials = Annual Estimated Usage + (Annual Estimated Usage x % Over Cost) Est. Usage = $700,000.00 Ozone Generating Equipment Inspection and Maintenance Performance and Efficiency Optimization Report Labor to perform repairs on-site, regular Labor to perform repairs on-site, overtime Labor to perform repairs on-site, holiday Labor to perform repairs off-site, regular Labor to perform repairs off-site, overtime Labor to perform repairs off-site, holiday Parts and Materials (Estimated Usage + Markup %) MINIMUM SPECIFICATIONS PURPOSE: The DeKalb County Department of Watershed Management (DWM) - Scott Candler Water Treatment Plant (SCWTP) is soliciting bids to provide professional maintenance, repair, and replacement services for its ozone generation systems. Additionally, SCWTP is seeking to establish reliable data and operation, and ensure performance targets are met. The minimum specifications shall cover the minimum requirements for routine inspection, maintenance, testing, evaluation and recommendations for repair and/or replacement of various components associated with the ozone generation systems at the: DeKalb County DWM SCWTP. The ozone generation support shall include, but not be limited to, the equipment identified in this bid specification. QUALIFICATION REQUIREMENTS: To be considered for this contract, Bidders shall: Have a minimum of ten (10) years of experience with inspection, installation, repairing, testing, evaluating and troubleshooting Wedeco and Veolia ozone generators, Wedeco and Veolia power supplies, and Destruct units. Have the necessary skill set to make repairs on all components without having to use subcontractors to make such repair. Examples of types of repairs are included in, but not limited to, the following list: Oxygen - flow meters, pressure gauges, pressure regulating valves, flow control valves, temperatures, process/ambient monitors Ozone - flow meters, pressure gauges, flow control valves, pressure relief valves, temperatures, process/ambient monitors Ozone destruct units - catalysts, flow control valves, pressure regulating valves, pressure relief valves, heaters, blowers Power supplies - inverters, diodes, SCRs, cooling systems Sub-contractors will be allowed for PLC and AC (power supply). Bidder shall have all permits and/or licenses required for the local, state, and federal authorities at the time the bid is submitted. Bidder shall submit following items upon request: Documentation that will attest to the company's capabilities and qualifications to perform the work and provide the services as set forth within this ITB. A complete professional profile of all key personnel outlining their training and experience in the scope of work detailed in the specifications. SCOPE OF WORK: General Requirements The Successful Bidder ("Contractor") shall furnish all items, articles, materials, and supplies, etc. necessary to perform the services listed in these specifications. This shall include, but not be limited to: personal protective equipment (such as gloves, goggles, safety shoes, etc.), other miscellaneous test equipment, tools, vehicles, ladders, etc. SCWTP shall not provide any equipment. Contractor shall execute all work in strict accordance with all local, state, and national codes, ordinances, and regulations governing the work involved. Bidder is responsible for obtaining any and all permits required by the SCWTP, the State of Georgia, or any other entity or governing body. SCWTP's designated representatives have provided herein a list of the equipment and the specifications and function design of the generators for routine inspection, maintenance, and testing. Contractor shall be responsible for appropriate troubleshooting, analysis, recommendation(s) for repair, and/or replacement. It is anticipated that most work will be performed on-site. For all requests submitted by the SCWTP for standard repairs and troubleshooting, Contractor shall be on site and beginning work within three (3) business days or less from receiving a work request. Standard business days for the SCWTP are Monday through Friday, 7:00 a.m. to 3:30 p.m. Contractor shall not work any normal SCWTP day off, including weekends and holidays, or other than the standard business days without prior approval of the SCWTP designated representative. All requests to work other than standard business days shall be submitted at least two (2) business days in advance. Contractor shall submit written quotes for parts and/or repair to the SCWTP designated representatives for approval prior to replacement of defective parts. Parts included on the written submittals are considered an Estimated Parts List and shall be paid for at the unit price quoted from manufacturers' catalogs plus quoted percent markup to the SCWTP. Manufacturers catalog price quoted is binding for at least a one-year duration. Only price increases per manufacturer's catalog will be allowed during the entire term of this bid. If a manufacturer's catalog does not exist for the replacement part, written quotes must be provided and approved by the SCWTP designated representatives prior to installation of said replacement parts. SCWTP reserves the right to send its representatives to accompany any equipment to the Contractor's repair facilities and to preview, inspect and approve at any time the progress of work being performed by the Contractor to ensure that proper methods for handling, measurement, testing, repairing, disassembly/assembly, and preparation for return shipping are taken. This does not relieve the Contractor of any liability for any corrective measures that the representative may have excluded that should have been performed or taken that would have prevented any malfunction. damage to the equipment or personal injuries. Contractor shall not accept from any other SCWTP employee or fulfill any request for services or repairs without the written request of the SCWTP's Maintenance/Electrical and Instrumentation Superintendents, Maintenance Coordinator, Plant Manager, Assistant Plant Manager or other designated representative. Contractor shall furnish certified and qualified trained and competent professionals to perform routine inspection, maintenance, testing, and troubleshooting in the field. Each person performing any part of the scope of this work shall have in his or her possession current applicable Federal and/or State Licenses. An original (legible) and one copy (legible) of the routine inspections, maintenance accomplishment, testing and/or repair recommendations will be submitted to the Maintenance/Electrical and Instrumentation Superintendents, Maintenance Coordinator, Plant Manager, Assistant Plant Manager or other designated representative. All repairs and parts replacement must meet or exceed the manufacturer's original specifications. Contractor and/or Sub-contracted vendor shall not sell, sublet, or assign any portion thereof to any other person or persons, except upon the written approval of the SCWTP. Routine Inspection, Maintenance, and Testing Requirements Routine inspection and maintenance services will be performed on listed equipment four (4) times annually. The first inspection will be performed within ten (IO) days after the Notice to Proceed and will be coordinated with SCWTP designated representatives. All State of Georgia Codes and Regulations shall supersede all other Codes and Regulations whenever there is a conflict and/or clarification needed or required. SCWTP designated representatives shall reserve the right to make all final decisions pertaining to such matters. Services shall include, but are not limited to: Perform lockout/tagout on all equipment to be inspected Perform visual inspection of all ozone related equipment from Liquid Oxygen (LOX) to Ozone Destruct Check and verify all process parameters Check LOX pressures at tank and evaporator Check evaporator condition and cycling between evaporators Check LOX pressures at O 2 filter and at ozone vessel Check LOX temperature verifying with a temperature calibrator. Check dew point, including at the nitrogen boost system and connect dew point sensor for verification Check and record the gas flow rate Visually inspect the condition of the gas valves Visually inspect all gas check valves for proper functionality Check cooling water temperature into and out of the vessel verifying with a temperature calibrator Check cooling water pressure Check cooling water flow Check cooling water pH and corrosion inhibitor and adjust as needed Review site records for checks to cooling water constituents Visually inspect the condition of the cooling water pumps Visually inspect the condition of PSU cooling lines Inspect the condition of the PSU cooling fluid (par INVITATION TO BID OVERVIEW PURPOSE DeKalb County Government (the County) is soliciting bids for Solicitation No. 2026-067-ITB Ozone Generation Support (Three (3) Year Multiyear Contract) from responsible bidders. GENERAL INFORMATION Sealed bids are to be submitted via the County's eProcurement Portal at https://procurement.opengov.com/portal/dekalbcountyga not later than 3:00 pm on Tuesday, December 15, 2026 . ***PRICE SCHEDULE MUST BE SUBMITTED SEPARATELY OR BIDDER WILL BE DEEMED NON-RESPONSIVE AND WILL NOT BE CONSIDERED FOR AWARD*** Any pricing included in the bid package (original or copies) will cause the bidder to be deemed non-responsive. QUESTIONS/EXCEPTIONS: All requests must be in writing . Any explanation desired by a bidder regarding the meaning or interpretation of the Invitation to Bid, bidder instructions, general terms and conditions, insurance requirements, drawings, scope/specifications, etc., must be requested in writing and with sufficient time allowed for a reply to reach bidders before the submission of their bids. If any statement in the bidding documents, specifications, plans, etc., appear ambiguous to the Bidder or if the Bidder would like to submit exceptions to general terms and conditions or insurance requirements for consideration, Bidder is specifically instructed to make a written request to the Department of Purchasing and Contracting as outlined in the preceding sentence. Any information given to a prospective bidder concerning an Invitation to Bid wil l be furnished to all prospective bidders, as an addenda to the Invitation, if such information is necessary to bidders in submitting bids on the Invitation or if the lack of such information would be prejudicial to uninformed bidders. Oral explanations or instructions given before the award of the contract will not be binding. Questions must be submitted no later than 5:00 pm on Monday, November 30, 2026 . TERM Multi Year . See GENERAL TERMS & CONDITIONS section for details. ADDITIONAL INFORMATION/ ADDENDA: The County will issue responses to inquiries and any other corrections or amendments it deems necessary in written addenda issued prior to the bid opening date. Bidders should not rely on any representations, statements or explanations other than those made in this ITB or in any addendum to this ITB. Where there appears to be a conflict between the ITB and any addenda issued, the last addendum issued will prevail. It is the responsibility of the Bidder to ensure awareness of all addenda issued for this solicitation. Please acknowledge the addenda and submit to the DeKalb County Department of Purchasing and Contracting as requested. Bidders may contact the above listed contact person to verify the number of addenda prior to submission. Addenda issued for this ITB will be posted on DeKalb County’s eProcurement Portal, https://procurement.opengov.com/portal/dekalbcountyga . Bidder should regularly check the Portal for addenda. REFERENCES: Bidder shall provide three (3) references for projects similar in size and scope within the last four (4) years, to the project specified herein using the Reference and Release Form in the VENDOR QUESTIONNAIRE . Each reference must include project name and location, project description, and the reference contact person who has direct knowledge of the services, a current telephone number and email address. The ineffectiveness of contact information and/or the reference’s lack of responsiveness may result in being deemed non-responsible. INVITATION TO BID PROCEDURES BIDDER INFORMATION: FAILURE TO SUBMIT THE PRICE SCHEDULE SEPARATELY VIA OPENGOV SHALL DEEM THE BID NON-RESPONSIVE. INCLUDING THE PRICE SCHEDULE IN ANY AREA OUTSIDE OF ITS SEPARATE SUBMITTAL WILL RESULT IN BIDDER’S BID BEING DEEMED NON-RESPONSIVE. Minimum specifications are intended to be open and non-restrictive. Contractors are invited to inform the DeKalb County Department of Purchasing and Contracting whenever specifications or procedures appear not to be fair and open. Such information should be supplied as early in the procurement process as possible. Information received in less than five (5) days prior to the scheduled bid opening will not be acted upon unless the DeKalb County Department of Purchasing and Contracting rules that it is in the best interest of the County to consider. Brand names and numbers when provided in solicitations are for reference and to establish a quality standard. Any reference to a brand name shall not be construed as restricting Bidders to that manufacturer (unless “no substitutes” is stated). Bids on equal items will be considered, provided the bid clearly describes the article offered and it is equal or better in quality and function and fully compatible with this requirement. By submitting a bid, Bidder warrants that any goods or services supplied to DeKalb County Government meet or exceed the specifications set forth in this solicitation. If any supplies, materials, and equipment are provided to the County under this solicitation, then such items shall be new and in first-class condition unless the solicitation specifically allows offers of used, reconditioned, or remanufactured items. If newly manufactured products are specified, such products shall be of recent origin and not previously used. No equipment of any type is acceptable if serial numbers or any other manufacturer’s identification labels or marks have been removed, obliterated, or changed in any way. A Contractor delivering any such equipment to the County will be deemed to have breached the contract and appropriate action will be taken by the DeKalb County Government Purchasing and Contracting Department. Time of delivery is a part of the solicitation and an element of the contract that is to be awarded. If the Bidder cannot meet the required service delivery dates, a bid should not be submitted. Failure to deliver in accordance with the contract could result in the Contractor being declared in default. Bid Withdrawal Bids may be withdrawn at any time prior to the bid opening. After bids have been publicly opened, withdrawal of bids shall be based upon Part 3, Section IV, F. within the DeKalb County Purchasing Policy. Expenses of Preparing Responses to this ITB The County accepts no responsibility for any expenses incurred by Bidders who submit bids in response to this ITB. Such expenses are to be borne exclusively by the Bidders. It is the responsibility of each Bidder to ensure that its submission is received by 3:00 p.m. on the bid due date. The time/date stamp clock located in the County eProcurement Portal Clock shall serve as the official authority to determine lateness of any bid. The bid opening time shall be strictly observed. Be aware that visitors to our offices will go through a security screening process upon entering the building. Bidders should plan enough time to ensure that they will be able to deliver their submission prior to our deadline. Late submissions, for whatever reason, will not be evaluated. Bidders should plan their deliveries accordingly. Telephone, fax and paper bids will not be accepted. Price Schedule openings shall be conducted at a time and date after the initial bid opening to be publicized by the Procurement Agent at the conclusion of the responsiveness evaluation. Only the Price Schedules of responsive bidders shall be opened. The County reserves the right to decide which bid(s) will be deemed responsive and said determination shall be made in accordance with the requirements stated in this solicitation. Federal Work Authorization Pursuant to O.C.G.A. §13-10-91, the County cannot enter into a contract for the physical performance of services unless the Contractor, its Subcontractor(s) and sub-subcontractor(s), as that term is defined by state law, register and participate in the Federal Work Authorization Program to verify specific information on all new employees. The Bidder certifies that he/she has complied and will continue to comply throughout the contract term with O.C.G.A. §13-10-91 and any related and applicable Georgia Department of Labor Rule. Contractor agrees that in the event it employs or contracts with any Subcontractor(s) in connection with this contract, Contractor will secure from each Subcontractor an affidavit that certifies the Subcontractor’s current and continuing compliance with O.C.G.A. §13-10-91 throughout the contract term. Each Subcontractor agrees that in the event it employs or contracts with any sub-subcontractor(s), each Subcontractor will secure from each sub-subcontractor an affidavit that certifies the sub-subcontractor’s current and continuing compliance with O.C.G.A. §13-10-91 throughout the contract term. LSBE Information It is the objective of the Chief Executive Officer and Board of Commissioners of DeKalb County to provide maximum practicable opportunity for all businesses to participate in the performance of government contracts. The current DeKalb County List of Certified Vendors may be found on the County website at http://www.dekalbcountyga.gov/purchasing/ . It is required that all responding Bidders attend the mandatory LSBE meeting within two-weeks of the solicitation’s advertisement, and comply, complete and submit all LSBE forms with the Bidder’s response in order to remain responsive. Attendance can be in person, via video conference and teleconference. Video conferencing is available through Zoom. Instructions for attendance via vid GENERAL TERMS AND CONDITIONS CONFLICT In the event of a conflict between any provisions contained in any of the documents governing this transaction, the following shall be the order of precedence: Change Orders or modifications; the Bidder’s accepted Response; and the County’s ITB. SCOPE OF WORK AND RESPONSIBILITIES The Bidder’s services shall include all things, personnel, and materials necessary to provide the goods or services that are in compliance with the specifications as authorized by the County. COUNTY REQUIREMENT: The contract will be an “Indefinite Quantity” type with County requirements to be satisfied on an “as ordered” basis. The County makes no promise, real or implied, to order any quantity whatsoever. This invitation and res Source: OpenGov https://procurement.opengov.com/portal/dekalbcountyga/projects/259493 Canonical URL: https://govcontractfinder.com/contracts/ozone-generation-support-three-3-year-multiyear-contract-opengov-365404-project-259493