The purpose of this project is to upgrade and replace all Physical Access Control Systems (PACS), including door access control systems, intercom systems, and camera surveillance systems at two separate sites. The first site being Southeastern Power Administrations Main site and the second, Southeasterns Remote Operations Site. Ensuring compliance with FIPS 201 standards for identity authentication and Section 2 of the Secure Networks Act, which restricts certain telecommunications and surveillance equipment deemed as security risks. Surveillance cameras must provide high-resolution imaging, 24/7 monitoring capability, and secure data storage for a minimum of 30 days of video, ensuring compliance with Secure Networks Act-approved equipment lists. Southeastern intends to issue a firm-fixed-
ENERGY, DEPARTMENT OF is actively seeking qualified contractors for security systems services with a set-aside for No Set Aside businesses in ELBERTON, GA. This set-aside designation means eligible businesses face reduced competition from larger firms.
Looking for more opportunities?
Browse our full directory of government contracts