PARKWAY TREE TRIMMING SERVICES State and local opportunity evaluation City of Naperville, IL 26-228 Posted: 2026-10-29T13:10:00.786Z Response deadline: 2026-11-20T20:00:00.000Z This project will consist of furnishing all labor, supervision, materials, tools, equipment, incidentals, and expertise necessary for the pruning of parkway trees, as specified by the Department of Public Works. The City will provide a map of each specific subdivision to be pruned and a list of each tree, identified by species and diameter, to be trimmed within that subdivision. There will be approximately 10,000 trees to be trimmed each year. See the attached Parkway Tree Trimming Bid Worksheet for the specific subdivisions and the approximate quantities and diameters of each tree to be trimmed within them. The successful Contractor(s) will be paid for the work described herein on a per-tree basis according to the diameter classification of each tree pruned. The five diameter classifications are: 1”-6”, 7”-12”, 13”-24”, 25”-36”, and trees 37” or greater in diameter. Diameters of trees trimmed shall be measured with a standard diameter tape at four and one-half (4½) feet from the ground. In the case of multi-stemmed trees that fork less than (4½) feet from the ground, measurement will be taken one foot below the fork. Subdivision work shall be completed by October first of each contract year unless agreed upon by the City. Scope of Work Intent of Specifications The bid will establish service rates that are all-inclusive (i.e., no additional fuel surcharges, truck fees, etc.). Estimated quantities are for bid purposes only and are intended only to establish a unit price. Total quantities shall be determined by the City of Naperville Department of Public Works - Operations Division. The City reserves the right to change the scope of duties, add sites, delete sites, adjust service levels, hire other additional contractors, do the work with City staff, or take other measures consistent with City policies, procedures, and/or act in other capacities in the best interest of the City. Scope Overview This contract will consist of furnishing all labor, supervision, materials, tools, equipment, incidentals, and expertise necessary for the pruning of parkway trees, as specified by the Department of Public Works. The City will provide a map of each specific subdivision to be pruned and a list of each tree, identified by species and diameter, to be trimmed within that subdivision. There will be approximately 10,000 trees to be trimmed each year. See the attached Parkway Tree Trimming Bid Worksheet for the approximate quantities and diameters of each tree and Attachment A - Tree Trimming Zone Overview for specific subdivisions to be trimmed. The successful Contractor(s) will be paid for the work described herein on a per-tree basis according to the diameter classification of each tree pruned. The five diameter classifications are: 1”-6”, 7”-12”, 13”-24”, 25”-36”, and trees 37” or greater in diameter. Diameters of trees trimmed shall be measured with a standard diameter tape at four and one-half (4½) feet from the ground. In the case of multi-stemmed trees that fork less than (4½) feet from the ground, measurement will be taken one foot below the fork. Subdivision work shall be completed by October first of each contract year unless agreed upon by the City. The bidder is also requested to provide hourly rates for standard and emergency circumstances for personnel and equipment as specified on the Bid Worksheet. This pricing is to be used in the event of standard or emergency work needs outside of the scope of the normal tree trimming as covered by this specification. Examples of additional services may include tree removal, removal of hanging branches, and other related tree and brush services. For the standard work, the work would be performed between the hours of 7 a.m. and 5 p.m. Monday through Friday. The City is also requesting hourly pricing for emergency storm-related services, including brush collection, tree removal, and removal of hanging or hazardous branches following a storm event. For the emergency work, the work would be the result of a storm, and crews would be needed as soon as possible following the storm, usually within a few business days. The City would determine when the emergency rates apply and would work with the Contractor on needed crew sizes based on the work requested. Emergency work would be performed between the hours of 7 a.m. and 5 p.m. Monday through Friday and can be requested on weekends or holidays. All hourly pricing is optional and will not be included in the Total Base Bid. The City may utilize these hourly services, at its discretion, when additional work is required. Definitions “Contractor” means the company, employees, or agents proposing to provide rehabilitation services to the City of Naperville. “City” shall mean the City of Naperville, its employees, or agents. Preparation of Bid Bidders are responsible for becoming familiar with all conditions, instructions, and contract documents governing this bid and shall inspect the site and conditions pertinent to the work involved. Submission of a bid will be considered specific evidence of having performed the above. Failure to make such an inspection shall not excuse the Contractor from performance of the duties and obligations imposed under the terms of the contract. Once the award has been made, failure to have read all the conditions, instructions, and specifications of this contract shall not be cause to alter the original contract or to request additional compensation. Minimum Qualifications Contractor shall be required to show to the City that it has the necessary facilities, ability, and resources to provide the services specified herein and has a minimum of five years’ experience. Each bidder shall provide an equipment list it proposes to use on this project and shall allow the City to inspect these items, upon request. The Department of Public Works reserves the right to reject any bid if the evidence submitted by, or investigation of, the Contractor fails to satisfy the Department of Public Works that the Contractor is properly qualified to carry out the obligations of the contract and to complete the work described herein. References Contractor shall be required to provide references who can attest to the Contractor’s previous satisfactory performance of at least three (3) municipal or other governmental tree trimming contracts in excess of 300 trees each, within the last 5 years. The Contractor shall include the names, addresses, contact person(s), phone numbers, email addresses, and type of service provided to each referenced customer. Term of Contract The initial term of this contract shall be for a one (1) year period from December 1, 2026 to November 30, 2027, with consideration for four additional one-year extensions. However, it must be clearly understood that the City Council approves funding and budgets for a one (1) year period, beginning on January 1, and that the initial contract places NO obligation on the City to appropriate funding beyond the initial first year. Any contract extensions are contingent upon available funding, service arrangement, cost factors, and the Contractor's performance under the contract. Detailed Scope of Work and Technical Provisions The tree pruning work performed under this contract shall conform to the 2023 American National Standard for Tree Care Operations ANSI A300P1-2023 and shall follow the 2019 Best Management Practices Guidelines for Tree Pruning. Trimming practices shall also adhere to the following: To remove all dead, dying, diseased, interfering, objectionable, and weak branches. To remove low branches necessary to permit clearance of approximately fourteen (14) feet where practical on the street side of the tree, sixteen (16) feet on truck routes to allow passage of Class 7 commercial vehicles, and approximately ten (10) feet on the sidewalk or pedestrian side of the tree. To remove all interior interfering branches, and crossed or rubbing branches where practical, so the removal thereof will not leave large holes in the general form of the tree. To remove one branch of all structurally weak “(V)” crotches occurring along the main trunk or developing within the tree crown, particularly in smaller trees. Special attention shall be given to the effect removal of such branches will have on the ultimate form of the tree. To remove trunk suckers and water sprouts, especially where they are present below the bottom one half (½) of the tree. To improve the appearance of the trees trimmed. Attention is to be given to the symmetrical appearance of the trees. Appropriate pruning shall be done in order to maintain a tree-like form typical of the species of the tree being trimmed. “Lion Tailing” and “topping of trees” are considered poor pruning techniques and shall not be permitted. In lifting the bottom branches of trees for clearance, care should be given to the symmetrical appearance of the entire crown. All final cuts shall be made sufficiently close the trunk or parent limb, without cutting into the branch collar or leaving a protruding stub, so that closure can readily begin under normal conditions. Proper, well-maintained, sharp tools for pruning shall be used for each cut. All tools used on a tree suspected to be infected with a contagious disease shall be thoroughly disinfected before being used on another tree. All limbs to be removed must be cut in such a manner so as to prevent any ripping or tearing of the wood or bark on the parent or remaining stem. Limbs over 2” in diameter shall be cut using the three cut pruning method. All limbs must be brought to the ground in such a manner as to prevent any damage to real or personal property, publicly or privately owned. Any visible girdling roots, structural weakness, decayed trunk or branches, or split crotches or branches in the tree should be reported to the City in writing. Ash trees showing significant signs of EAB damage shall be reported to the City and those with more than 40% crown dieback shall be skipped unless instructed by the City to trim them. No person working in trees shall use shoes with spikes, or any other footwear, which will in the opinion of the City injure the tree being trimmed. At no time shall any person working in trees for pruning purposes wear spurs or climbing irons. No American Elm tree or other Elm tree susceptible to Dutch Elm disease shall be trimmed between April 1 st and November 1 st of each year, except in emergency situations. The contractor shall clean up and dispose of all debris resulting from the trimming operation, including raking all lawn areas and sweeping paved areas. All work areas shall be cleaned up by the end of each workday . Pruned limbs and branches temporarily placed in the parkway shall be placed in such a manner as to eliminate any obstruction to pedestrians and motor vehicles. Disposal of wood chips and debris generated by the work described within this contract shall be the responsibility of the contractor and shall not be allowed to remain on the worksite overnight. All equipment to be used and all work to be performed shall be in full compliance with the most current revision of the ANSI Z133-2026 standards. (The latest version of this document is 2026 at the time of this bid specifications printing.) The Contractor shall conduct its operation in a manner that will not interrupt pedestrian or vehicle traffic except as approved by the City. The work area shall be confined to the smallest area possible to allow maximum use of the street or sidewalk and to reduce any hazard to traffic or pedestrians to a minimum. The contractor shall provide adequate traffic control for work area protection in compliance with the most recent edition of the Federal Highway Administration’s Manual on Uniform Traffic Control Devices for Streets and Highways , and the State of Illinois’ Illinois Vehicle Code . All personnel, signs, barricades, and any other items or devices necessary shall be provided by the contractor. The City shall make no separate payment for this work. Traffic control shall include, but not be limited to, the following: Whenever possible, work vehicles shall be parked on the same side of the street as the work site. No vehicle of any kind shall be placed, parked, or operated upon turf, parkway areas, or private driveways, except as authorized by the City of Naperville. Whenever possible, the work site on a two-lane street shall be confined to one traffic lane, leaving the opposite lane open to traffic. Work area protection shall take into account the duration of the project, the size of the project, the lanes of traffic, the volume of traffic, the speed limit, and the distance to the work area from the pavement. Work vehicles shall have the flasher lights lit, but not as a substitute for any traffic control devices which may be necessary for work area protection. Under certain field conditions such as hills and curves, the spacing of the traffic control devices shall be adjusted as necessary. Warning signs such as “Men Working” shall be diamond-shaped, with a black symbol or message on an orange reflective background. Such si Personnel and Equipment The Contractor shall supply all material, equipment, and personnel necessary to complete the work specified. The Contractor shall rent equipment as needed to cover any equipment breakdowns that would cause this contract not to be completed within the allotted time period. All vehicles and attached equipment shall have the contractor’s name in a visible location, and shall have all the appropriate items to avoid damage to public and private property (example - boards or pads for outriggers to avoid depressions, etc.). If requested, the City will work with the Contractor to temporarily store vehicles on City property during active tree trimming operations. All individuals shall be familiar with the pruning specifications identified in this document and shall be experienced in pruning operations. Competent individuals and not those in “training” shall perform actual pruning. The City shall, throughout the life of the contract, have the right of rejection and approval of staff assigned to the work by the Contractor. If the City rejects staff, the contractor must provide replacement staff satisfactory to the City in a timely manner, not to exceed 48 hours, and at no additional cost to the City. The day-to-day supervision and control of the Contractor’s employees is the sole responsibility of the Contractor. The Contractor shall provide qualified supervision of each crew at all times while working under this contract. Each supervisor shall be fluent in English and be authorized by the contractor to accept and act upon all directives issued by the City. Certified Arborist At least one individual who is a Certified Arborist, qualified by the International Society of Arboriculture, shall be on each job site at all times while work is being performed. Their name(s) and certification number(s) shall be included in the bid document. Failure to have a Certified Arborist on each job site at all times while the crew is working shall result in termination of the contract. Protection of Public and Private Property The Contractor shall exercise all necessary caution to protect pedestrian traffic and to protect all public and private property from injury or damage caused by the Contractor’s operations. Any practice deemed hazardous by designated or other qualified City staff shall be immediately halted upon verbal or written notification. The Contractor shall comply with all OSHA, NIOSH, and other applicable federal, state, and local regulations, codes, and/or ordinances. In addition, the Contractor shall protect all interior areas that are not impacted by work. Damage to Public or Private Property Should any damage to public or private property occur as a result of the service performed or work done by the Contractor, the Contractor shall immediately notify the City Department of Public Works of such damage. Any correction of damage shall be resolved within ten (10) days after damage occurs. Should the damage not be rectified within the time frame agreed upon, or to the satisfaction of the City, the City reserves the right to repair or replace that which was damaged and assess the Contractor such costs as determined by the City and related to damage caused by the Contractor, and deduct these costs from any payment due to the Contractor. Protection of Overhead Utilities When tree trimming operations are conducted in areas where overhead electric, telephone, and cable television facilities exist, the Contractor shall protect all utilities from damage. If damage should occur, the Contractor shall immediately contact the appropriate utility and the City, and shall be responsible for all claims for damage due to its operation. The Contractor shall make arrangements with the utility for removal of all necessary limbs and branches which may conflict with or create a hazard in conducting the operations of this contract. If the Contractor has properly contacted the utility in sufficient time to arrange for the required work to be completed by the utility, delays encountered by the Contractor in waiting for the utility to complete its work shall not be the responsibility of the Contractor. Inspection of Work All work must be completed to the satisfaction of the City Department of Public Works, and any questions as to proper procedures or quality of workmanship will be resolved by it. If at any time during the contract, the service performed or work done by the Contractor is considered by the City to create a condition that threatens the health, safety, or welfare of the community, the Contractor shall, upon being notified either by written or oral notice, immediately correct such deficient service or work. In the event the Contractor fails to correct the deficiency immediately after notification, the City shall have the right to order correction of the deficiency by separate contract or with its own resources at the expense of the Contractor. The City reserves the right to terminate the whole or any part of this contract in the event the awarded contractor fails to perform any of the provisions of this contract. Prosecution of the Work Diligent prosecution of the work is an important part of this contract. Once work on a map has commenced, the Contractor will be expected to work every weekday, weather permitting, until the map is completed. Final completion requires the pruning of all trees identified in the Contractor’s bid documents in addition to the correction of any tree identified by the City as deficient. The City will provide maps and lists of trees to trim within designated subdivisions, with each map area expected to be completed in approximately 30 days (weather permitting). Please see Attachment B - Tree Trimming Zone Map Example for reference. Progress Reports On the listing of trees to be pruned, which will be supplied to the awarded Contractor, the Contractor will report when a map area is completed. This report should be sent to the Forestry Supervisor. Along with this report, the Contractor shall also report any structural weakness, decayed trunks or branches, or split branches on City parkway trees that were observed during the week. Hazardous trees should be reported immediately. Time of Day Work Restrictions All work within the defined limits of the project shall be performed between the hours of 7:00 a.m. and 5:00 p.m., Monday through Friday, unless authorized at the sole discretion of the Project Manager. Payment For Completed Work The Contractor shall be paid for the work described herein on a per-tree, by diameter class basis for each work area. Paymen Source: OpenGov https://procurement.opengov.com/portal/naperville/projects/315283 Canonical URL: https://govcontractfinder.com/contracts/parkway-tree-trimming-services-opengov-18861630-project-315283