Percent for Art: Manchester Call for Artists State and local opportunity open City of Pittsburgh 2026-RFP-241 Posted: 2026-11-09T20:00:01.532Z Response deadline: 2026-12-21T20:00:00.000Z The City of Pittsburgh Office of Management and Budget, on behalf of the Department of City Planning, is soliciting a Call for Artists or Artist teams to realize a public art project in the Manchester neighborhood of Pittsburgh. Scope of Work Background The City of Pittsburgh’s Percent for Art program dedicates capital funding to the creation of public art. Art created from this program must be implemented within the public realm, must include at least one permanent element, must be installed on City property, and will enter the City of Pittsburgh’s collection of public art. Permanent works of art should be designed for longevity; projects that require ongoing maintenance or care (beyond routine cleaning and area upkeep) without a plan for maintenance will not be given approval. Artists will work with city departments regarding the feasibility of any project in relation to implementation, maintenance, safety, and other possible concerns. All artwork must comply with City safety and permitting regulations. Location and Broad Themes to Consider Manchester-Chateau is a neighborhood with a rich history and an enduring legacy. It is the story of Pittsburgh's history in many ways, reflecting both the positive and the challenging aspects of the city's identity. Highway construction divided the community, making a neighborhood on one side of the highway with a wealth of significant historic resources and a vital heritage as the leading African-American neighborhood with almost no access to the riverfront. And on the other side of the highway, an economically successful industrial and institutional area with almost no residential buildings and limited riverfront access. Manchester-Chateau is on the verge of great change. The Pittsburgh community is realizing the assets of this neighborhood and steering investment here. Shifting demographics, interest and policy changes along the riverfront are among the factors driving opportunity and challenges in the evolution of this vital Pittsburgh neighborhood. The Manchester-Chateau Neighborhood Plan includes a section on Culture Heritage and Public Art, identifying current and future locations of cultural significance. Goal 8: increase public art assets through the neighborhood recommends: Incorporate Manchester’s cultural heritage through local art & design along the riverfront and throughout neighborhoods. Incorporate cultural heritage and inspiring architecture into public infrastructure (gateway signs, bike racks, banners, any metalwork). Create a community gathering space with rotating art and/or an outdoor gallery. Link to Neighborhood Plan: https://www.pittsburghpa.gov/files/assets/city/v/1/dcp/documents/8151_manchester_chateau_neighborhood_plan.pdf Instructions to Artists The artist or team selected will be chosen based on qualifications, experience, and background. They will collaborate closely with the City of Pittsburgh to develop and execute successful community engagement, concept and design development, permitting, and implementation of the artwork(s). Individual artists, teams, or firms may submit applications. To be considered, applicants must demonstrate experience coordinating all aspects of implementing at least one public artwork of significant impact and/or scale, including but not limited to project management and design development. Artist teams may include members with varying levels of experience; however, each team must designate a lead artist who has completed at least one prior artwork of significant impact and/or scale. To ensure meaningful engagement with communities and stakeholders, applicants must be willing to solicit feedback and participate in on-site meetings in Pittsburgh throughout the process. The artist(s) will incorporate community feedback to develop a concept for the public art project that reflects the character and identity of the neighborhood. Applicants are encouraged to partner with a dedicated project coordinator or project manager. The project coordinator supports the artist throughout all stages of the project, including community engagement, meeting coordination, scheduling, invoicing, and installation. Applicants may subcontract with third parties for the execution of various project components, including part or all of the artwork. NOTE: Artworks must be appropriate, accessible, and safe for all members of the public regardless of age and ability levels. All artworks must comply with City safety and permitting regulations. The public art project created by the selected artist may have multiple components, including programmatic or temporary elements; however, the majority of the project funds must go toward a permanent art installation. The artworks should be created to last at least ten years. Projects that require ongoing maintenance (beyond routine cleaning and area upkeep) without a plan for this upkeep will not be given final approval. Responsibilities requiring City collaboration The selected Applicant is expected to: Engage in a planning process including internal project design sessions, community planning meetings, and outside engagement as necessary for their strategic approach. Create a concept for the artwork that is feasible, constructable, is designed to last without extensive upkeep, and demonstrates a thoughtful relationship to the cares of the community. Create and execute a plan for fabrication and installation of the artwork, within the project budget. Present detailed proposals of the concept and design at various stages of development to city reviewers and to the Manchester community. Obtain approval from the Public Art & Civic Design Commission and letters of support from the Department of Public Works and/or the Department of Mobility and Infrastructure. Manage the site prep, fabrication, and installation of the approved artwork by the project deadline. Draft a maintenance plan for the life of the artwork. Submission requirements and format All submissions must be submitted electronically. No proposal shall be accepted in person, by U.S. Mail, by private courier service, via oral or email communication, telephone or fax transmission. Please submit a package containing the following: Cover letter. Provide a statement of interest in the project. Artist Approach . Provide a detailed narrative of your team's approach to successfully completing the scope of work outlined in this Call for Artists. Include thorough explanations of the methodologies you consider essential to accomplishing this project. Include a proposed work schedule that outlines how all required tasks will be completed within the desired timeline. Describe the proposed project team structure, specifying the roles and responsibilities for each major task, including project coordination and management, as well as the involvement of any sub-consultants. Resume. Provide CV or other listing of relevant experience. Work Samples . Provide up to 10 images or video links of previous work or previously executed projects which give a clear idea of applicable artistic experience. Samples may be in any medium of art, but preference will be given to work that shows a readiness to be translated into art for the public realm. For each work sample please provide the title of the project, location of the project, completion date, the project budget, and list any collaborators. References . Provide name, title, email address, and phone number for three professional references. Failure to include all of the elements specified may be cause for rejection. Additional information may be provided, but should be succinct and relevant to the goals of this Call for Artist. Excessive information will not be considered favorably. Budget The selected applicant will receive a total budget of $100,000. No expenses beyond $100,000 will be considered for reimbursement. The budget is invoiced through three milestones: 20% upon execution of the contract . This sum assists with research, concept development, and any necessary advance of funds for labor and materials. 50% upon Public Art & Civic Design Commission approval , letters of support from the Department of Public Works and/or the Department of Mobility and Infrastructure, and City Planning notice to begin fabrication and installation. 30% upon City’s final acceptance of the artwork , including material specifications, VARAV waiver, and maintenance manual. This amount includes all aspects of project development and installation, including community engagement, concept and design development, project administration, insurance, travel, permitting (including any necessary engineered drawings), fabrication (including labor), and installation costs. The selected applicant is responsible for ensuring that the project remains within the approved budget. Up to 20% of the total budget may be allocated as an artist fee ; the remaining 80% must be allocated to itemized expenses, which can include hourly rates and other expenses for both the selected artist and any subcontractors. PLEASE NOTE: The City does not agree to late fees, penalties, interest, attorney’s fees or other contingent liability. In no event shall the City be liable for special, indirect, incidental, reliance, lost profits or other business interest damages Insurance Selected artist will be responsible for providing proof of insurance naming the City of Pittsburgh as an additional insured and includes General Liability, Workers Compensation, and Automobile Liability coverage. Proof of insurance is required as part of the signed Agreement. Evaluation Review and award will be based on previous work samples, experience, and narrative. Proposals for specific concepts or artworks will not be reviewed at this time. Applicants will be evaluated on the following criteria: 30% Artistic background and portfolio samples 20% Experience in the successful completion of previous public art project(s) 20% Demonstrated success in working collaboratively with community groups, non-profits, and/or municipalities 20% Proposed cost breakdown based on the scope of work and budget 10% Response to Good Faith Effort to obtain MWDBE & VOSB participation The concept and design of the eventual artwork(s) will be developed by the selected artist during the contract period, following community engagement. Introduction Summary Background Contact Information Timeline The following represents the tentative schedule for this project. Any change in the scheduled dates for the Pre Proposal Conference (if applicable), Deadline for Submission of Written Questions, or Proposal Submission Deadline will be advertised in the form of an addendum to this RFP. The schedule for the evaluation process and other future dates may be adjusted without notice. Instructions to Bidders Submittal Requirements All proposals must be submitted electronically. No proposal shall be accepted in person, by U.S. Mail, by private courier service, via oral or email communication, telephone or fax transmission. Respondents are required to provide one (1) electronic copy of their proposal in either MS Word or PDF by the submission deadline. If additional hard copies are requested, the proposal should be bound or contained in a loose leaf binder. Document pages shall be 8-1/2 inches by 11 inches in size or folded to such a size. Use section dividers, tabbed in accordance with this Section as specified below. All proposals will need to be provided electronically so the following format will apply for the electronic submittal through the Beacon website. Additional Submission Considerations Late proposals will not be accepted or considered. Respondents should allow enough time to register company on the City's e-Procurement Portal, search the solicitation they wish to respond to and complete the submission process online before the deadline. The City of Pittsburgh shall not be responsible for proposals delivered to a person or location other than that specified herein. All submittals, whether selected or rejected, shall become the property of the City of Pittsburgh and will not be returned. All costs associated with proposal preparation shall be borne by the applicant. Proposal Format Requirements Response Format All submitted responses shall follow the formatting below, and all proposals will need to be provided electronically through the City's e-Procurement Portal. Each numbered section is to be uploaded as a separate file. If hard copies of submissions are required, each numbered section shall be a removable tab. Document pages shall be 8-1/2 inches by 11 inches in size or folded to such a size. Response to Scope Firm’s Qualifications, Experience and References Describe the firm and provide a statement of the firm’s qualifications for providing the scope of services. Identify the services which would be completed by your firm’s staff and those that would be provided by sub-consultants, if any. Identify any sub-consultants you proposed to utilize to supplement your firm’s staff. Provide a summary of the firm’s experience in providing these or similar services. Provide a minimum of three references for related projects, including dates, contact person, phone number, email, and a brief description of the project or scope of work. Qualifications of Project Team Provide a brief summary of the qualifications and experience of each team member assigned to this project, including length of service with the firm and resume/bio, and the qualifications /experience of any sub-consultant staff on your project team. Project Approach and Plan Provide a detailed discussion of your firm’s approach to the successful completion of the scope of services outlined in this RFP. Include thorough discussions of methodologies you believe are essential to accomplishing this project or completing the scope of services. Include a proposed work schedule to accomplish all of the required tasks within the desired timeline. Identify the staff roles who would be assigned to each major task, including sub-consultants. Cost Proposal Provide a total cost proposal for all services to be delivered, and a breakdown of costs delineated by major phase and/or deliverable as described in your project plan. Include a schedule of hourly rates for all proposed staff and the amount of time each person will be devoted to this project. Define any reimbursable expenses (e.g., travel) requested to be paid by the City. Note: If travel expenses are included, the rate assumptions generally should not exceed the United States General Services Administration (GSA) rates for Pittsburgh. PLEASE NOTE: The City does not agree to late fees, penalties, interest, attorney’s fees or other contingent liability. In no event shall the City be liable for special, indirect, incidental, reliance, lost profits or other business interest damages. Demonstration of Good Faith Effort Include statements of assurance regarding the following requirements detailed in the Equal Opportunity section of this solicitation: Solicit certified MBE/WBE/Veteran-Owned companies for various service categories where opportunities exist to subcontract within their company’s business model. Complete MWDBEVOSB Commitment Form to document good faith effort. Please provide scope of services to be delivered by each subcontractor. If a subcontractor is not chosen, a justification is required describing why services could not be rendered by a sub-contractor. Provide email documentation of solicitation correspondence with MBE/WBE/Veteran-Owned companies. Failure to include all of the elements specified may be cause for rejection. Additional information may be provided, but should be succinct and relevant to the goals of this RFP. Excessive information will not be considered favorably. Evaluation Phases Selection Procedure Your Proposal will be evaluated by a Proposal Committee comprised of the Director or other supervisor of the Using Department, one or more members of the Director’s staff, at least one member of the Office of Management & Budget and any other department representatives as deemed necessary. Submittals will be reviewed for responsiveness, and responsive submittals will further be screened by a selection committee in accordance with the criteria listed below. The firm(s) submitting the highest rated proposal may be invited for interviews. Equal Opportunity Review Commission Terms MWE/DBE The City of Pittsburgh is committed to the ideal of providing all citizens an equal opportunity to participate in City and its Authorities' contracting opportunities. It is therefore the City's goal to encourage increased participation of women and minority groups in all City contracts. The City requires that all respondents demonstrate good faith efforts to obtain the participation of Minority-Owned Business Enterprises (MBE's) and Women-Owned Business Enterprises (WBE's) in work to be performed under City contracts. The levels of MBE and WBE participation will be monitored by the City of Pittsburghs Equal Opportunity Review Commission (EORC). In order to ensure that there are opportunities for historically disadvantaged minority groups and women to participate on Covered Contracts, and consistent with the City's current equal employment opportunity practice and goals, the EORC will review contracts to include an evaluation of a developer/contractors employment of minority groups and women, encourage goals of eighteen (18) percent and seven (7) percent respectively. Veteran-Owned and LGBTQIA+ Small Business Goals It is also the City's goal to encourage participation by veteran-owned and LGBTQIA+ small businesses in all contracts. The City of Pittsburgh shall have an annual goal of not less than five (5) percent participation by veteran-owned small businesses and not less than three (3) percent participation by LGBTQIA+ businesses in all contracts. The participation goal shall apply to the overall dollar amount expended with respect to the contracts. The City requires that all respondents demonstrate good faith efforts to obtain the participation of veteran-owned small business in work to be performed under City contracts. The levels of participation will be monitored by the City of Pittsburgh’s EORC. Good Faith Commitment In order to demonstrate good faith commitment to these goals, all respondents are required to complete and submit with their bids the attached MWDBE/Veteran-Owned/LGBTQIA+ Solicitation and Commitment Form (which details the efforts made by the respondents to obtain such participation). Failure to submit a properly completed form along with documentation of Good Faith Commitment may result in rejection of the bid. Participants are encouraged to contact the Equal Opportunity Review Commission at 412-255-8804 to assist further. For further information, including definitions and additional requirements, please see Chapter 177A (Sections 177A.01 et. seq.) of the City Code and Section 161.40 of the City Code. Award and Contract Award After the City has received all Proposals and conducted its initial Evaluation, described above, the Proposal Committee may invite one or more Respondents to a follow-up interview to further discuss their Proposal(s). The Proposal Committee may decide to accept the Proposal of one or more Respondents. It may decide to reject all proposals. Once a Proposal is accepted, the contract negotiation process will commence. This RFP and your response to it, in the form of your entire Proposal, will become part of the Contract. If a real or apparent conflict should arise between this RFP/Proposal and other language contained in the final Contract, the language of the final Contract shall control. Contracting Process Successful Respondents will be required to enter into a Contract with the City of Pittsburgh, contingent upon the approval of City Council. This Contract will be directed and managed by the issuing departmen Source: OpenGov https://procurement.opengov.com/portal/pittsburghpa/projects/321175 Canonical URL: https://govcontractfinder.com/contracts/percent-for-art-manchester-call-for-artists-opengov-412-project-321175