Pershing and Windmill Intersection & Signal State and local opportunity open City of Cheyenne S-4-27 Posted: 2026-11-03T14:07:06.927Z Response deadline: 2026-12-15T21:00:00.000Z The project generally consists of roadway and intersection improvements, including replacement of the traffic signal system, installation of signage, pavement markings, and pedestrian safety features. Additional work includes removal and replacement of concrete pavement, sidewalks, curb and gutter, asphalt patching, grading, excavation, utility adjustments, traffic control, and landscape restoration. Pershing and Windmill Intersection & Signal PERFORMANCE BOND MOBILIZATION FORCE ACCOUNT INSPECTIONS AND TESTING FOR QUALITY CONTROL TRAFFIC CONTROL PORTABLE MESSAGE BOARDS CONTRACTOR SURVEYING SEDIMENT, EROSION CONTROL, AND STORM WATER MANAGEMENT REMOVAL OF FIRE HYDRANT REMOVE TRAFFIC SIGNAL SYSTEM REMOVAL OF THERMOPLASTIC PAVEMENT MARKINGS REMOVAL OF CONCRETE PAVEMENT REMOVAL OF SIDEWALK REMOVAL OF ASPHALT REMOVAL OF CURB AND GUTTER REMOVE SIGNS REMOVE AND RESET SIGNS CLEARING AND GRUBBING GRADING "W" CRUSHED BASE POTHOLING UNCLASSIFIED EXCAVATION ASPHALT PATCHING 4" ADJUST COMMUNICATIONS MANHOLE ELECTRICAL CONDUCTORS TRAFFIC SIGNAL SYSTEM LED BLANKOUT SIGN SIGN PANELS SIGN POSTS LANDSCAPE RESTORATION CONCRETE PAVEMENT - 8" CURB AND GUTTER TYPE A CURB CONCRETE SIDEWALK (4") DETECTABLE WARNING PLATES PAVEMENT STRIPING - 4" SKIP WHITE (EPOXY) PAVEMENT STRIPING - 4" DOTTED WHITE (EPOXY) PAVEMENT STRIPING - 4" SOLID YELLOW (EPOXY) PAVEMENT STRIPING - 8" SOLID WHITE (EPOXY) PAVEMENT STRIPING - 8" DOTTED WHITE (EPOXY) THERMOPLASTIC ARROW, RIGHT, PREMARK No.8330240R OR EQUAL BID BOND FORM Please download the below documents, complete, and upload. This Bid Proposal is accompanied by the required Bid Guarantee of five percent (5%) based upon the total cost of all items required to be bid. The City of Cheyenne is authorized to hold said Bid Guarantee for a period of not more than sixty (60) calendar days after the opening of the bids for the purpose of evaluating bids prior to award. If awarded the contract for this work, the undersigned Bidder agrees to execute the Agreement and furnish the required Bonds and Insurance Certificates within thirty (30) calendar days from the date of Notice of Award. CITY OF CHEYENNE NON-COLLUSION AFFIDAVIT OF PRIME BIDDERS FORM Please download the below documents, complete, and upload. Attached hereto is an affidavit in proof that the undersigned has not entered into a collusive agreement with any person in respect to this bid or any other bid or the submitting of bids for which this bid is submitted. CITY OF CHEYENNE SUBCONTRACTORS AND MATERIALS SUPPLIERS LIST FORM Please download the below documents, complete, and upload. RESIDENT CONTRACTOR The undersigned bidder (has or has not) been granted a State of Wyoming Certificate of Residency Status. RESIDENT CONTRACTOR - SUBCONTRACTING If the bidder has been granted a State of Wyoming Certificate of Residency Status, the undersigned (has or has not) subcontracted more than thirty percent (30%) of the work covered by this contract to nonresident bidders, as per Wyo. Stat. § 16-6-103 regarding limitations on subcontracting by resident contractors. RESIDENT CONTRACTOR - CERTIFICATE If claiming Wyoming Residency, please upload your Certificate of Residency issued by the State of Wyoming Department of Workforce Services. FIRM / BIDDER NAME Name of Company Submitting Bid. FIRM'S / BIDDER'S LEGAL STATURE Please select One (1) STATE OF INCORPORATION Please list State of Incorporation for Firm / Bidder. BIDDERS PHYSICAL ADDRESS Please provide, Street Address, City, State, and Zip Code. FIRM / BIDDER PHONE NUMBER Please provide phone number for Firm / Bidder. FIRM / BIDDER E-MAIL ADDRESS Please provide e-mail address for Firm / Bidder. FULL COMPLIANCE WITH BIDDING DOCUMENTS Pursuant to and in full compliance with all Bidding Documents, the undersigned Bidder hereby proposes to furnish all the labor and materials and to perform all the work required for the complete and prompt execution of everything described or shown in or reasonably implied by the Bidding Documents, including the Drawings and Specifications, for the work above indicated for the monies stated herein, which includes all State, County and local taxes normally payable in respect to such work when done for an entity not entitled to any exemption from such taxes. The amounts stated include all allowances for profit and overhead, taxes, fees and permits, transportation, services, tools and equipment, labor and materials and other incidental costs. BIDDERS SIGNATURE (NAME & TITLE) Please type the Name & Title of person authorized to submit a Bid on behalf of the Firm / Bidder. Introduction Summary Background Contact Information Timeline City of Cheyenne IFB S-4-27 Pershing and Windmill Intersection & Signal INVITATION FOR BIDS The Governing Body of the City of Cheyenne, Wyoming (“the Governing Body”) will only receive electronic bid proposals via the City's eProcurement Portal until 2:00 pm on Tuesday, December 15, 2026 for the Pershing and Windmill Intersection & Signal Bidders shall create a free account on line by signing up at https://procurement.opengov.com/portal/cheyennecity Once you have completed account registration, browse back to this page, click on "Submit Response", and follow the instructions to submit the electronic bid. At the aforementioned time and place, such bids that are received for the project shall be publicly opened and read aloud. The work to be performed will be in accordance with the plans and specifications on file in the City Purchasing Agent’s office. Bidding documents may be downloaded online via the City's eProcurement Portal . *** OPTIONAL ZOOM PRE-BID MEETING: A pre-bid meeting will be held on Friday, November 13, 2026 at 10:00 am . TJ Barttelbort, City of Cheyenne is inviting you to a scheduled Zoom meeting. Topic: Bid S-4-27 / Optional ZOOM Pre-Bid Meeting / Pershing and Windmill Intersection & Signal Time: Nov 13, 2026 10:00 AM Mountain Time (US and Canada) Join Zoom Meeting https://us02web.zoom.us/j/83354404925?pwd=qAoHCkb6LuUbneR3ab8HBVOqQe3q9n.1 *** A bid guarantee in the amount of five percent (5%) of the total bid shall accompany any bid submitted. See Section below, titled: Instructions to Bidders. The successful bidder shall furnish and pay for satisfactory performance and payment bonds in the amount of one hundred percent (100%) of the accepted bid. See Section below, titled: "Instructions to Bidders." The City of Cheyenne (“the City”) reserves the right to reject any or all bids or to waive any formalities in the bidding. Prior to the award of the contract, the City may hold bids for a period not to exceed 60 days from the date of opening of bids for the purpose of reviewing the bids and investigating the qualifications of the bidders. Provisions of Wyo. Stat. § 15-1-113, incorporated by reference, are made an express part of the Contract Documents. TJ Barttelbort Purchasing Division Published in: Wyoming Tribune Eagle USE OF SEPARATE BID FORMS These Contract Documents include a complete set of bidding and contract forms which are for the convenience of bidders. Bidders shall make proposals upon the forms furnished herein and pursuant to the instructions and requirements set forth herein. INTERPRETATION OF DOCUMENTS The City will not provide oral interpretations to any bidder as to the meaning of the Contract Documents or any part thereof. If any person contemplating submitting a proposal requires interpretation or clarification regarding the meaning of any part of the drawings, specifications, or other portions of the contract documents, or finds discrepancies in or omissions from the drawings or specifications, that bidder shall submit a written request for interpretation, clarification, or correction thereof to the City of Cheyenne, hereinafter “City”. The bidder submitting the request will be responsible for its prompt delivery. Questions shall be submitted via the City's eProcurement Portal - Question and Answer tool. ADDENDA The City will make every interpretation, clarification, or correction to bidders by written addendum to the Contract Documents. The City will post addenda via it's eProcurement Portal to all persons identified on the City’s plan-holders/followers list, but it shall be the bidder’s responsibility to make inquiry as to the addenda issued. It shall also be the bidder’s responsibility to confirm that it is included on the City’s plan-holders list by "following" the project on line. The bidder shall acknowledge all addenda issued during the time of bidding in the bid proposal and shall be made a part of the Contract. Addenda shall be acknowledged via the City's eProcurement Portal . The City will consider as incomplete any bid proposal in which all addenda are not acknowledged. All questions shall be submitted by 5:00 pm on Thursday, November 19, 2026 . The City will respond with an Addendum no later than 5:00 pm on Tuesday, November 24, 2026 . DEFINITIONS AND TERMS Contract Documents: All documents in the bidding packet, including addenda, as identified in Part V, Article 5. Contract Modification: A written document that must, at minimum, be executed by the Contractor and by the Mayor of the City of Cheyenne. A Contract Modification may require the approval of the City’s Governing Body. A contract modification must be executed to change the Contract Price, Contract Time, or to otherwise modify the Contract Agreement. Contract Price: The original amount bid by the contractor, as specified in Article 4 of the Agreement and modified by any Contract Modifications. Contract Time: Begins upon the date specified in the Notice to Proceed and consists of the number of calendar days up to and including the date specified in Part V, Article 3. Field Order: A form issued by the City Engineer (“Engineer”) to authorize the Contractor to proceed with changes or additions to the work as described in a Work Directive or a Request for Adjustment. A Field Order may either increase or decrease quantities or authorize work for payment under a Force Account, if included in the bid, but cannot increase the Contract Price. Force Account: A method of payment for work performed by the Contractor at the Engineer’s discretion and calculated in accordance with Part VI, Section 14. Request for Adjustment: A form issued by the Engineer to allow the Contractor to request an adjustment of the Contract Time, the Contract Price, or to request any other modification of the Contract Agreement. The Contractor shall also use this form for submitting pricing as a result of a Work Directive. Work Directive: A form issued by the Engineer to inform the Contractor of a change in the Work which does not alter the Contract Time, the Contract Price, or any other provisions of the Contract Agreement. If a change in the Work will increase the Contract Price, the City must approve and execute a Contract Modification before the Contractor may proceed with the Work as modified. SITE INSPECTION AND CONTRACT DOCUMENTS EXAMINATION Each bidder shall visit the proposed work site and become acquainted with the existing conditions of the site. Then, in preparing and submitting bids, contractors should take into account the observed existing conditions, construction necessities, required labor, facilities involved, and difficulties and restrictions that may be encountered in contract performance. If possible, the City will conduct a tour of the work areas. All interested parties should contact TJ Barttelbort in the City’s Purchasing Office, at (307) 773-1045 . Each bidder should also thoroughly examine and become familiar with the Drawings, Technical Specifications, and all other Contract Documents. The selected bidder, by executing a contract, shall in no way be relieved of any obligation under it due to the selected bidder’s failure to review or examine any form, legal instrument, or to become acquainted with existing conditions in the work area. The City will be justified in rejecting any claim based on facts which the selected bidder knew or should have been aware of as a result of inspecting the site and Contract Documents. ALTERNATE BIDS The City will not consider alternate bids unless alternate bid items are specifically requested by the Specifications and the bid proposal. BID PROPOSAL REQUIREMENTS Bidders shall submit all bids via the City's eProcurement Portal, all such bids are subject to the Contract Documents requirements. All bids shall be regular in every respect. The bidder shall not make or include any The bidder shall not make or include any interlineation, excisions, or special conditions in the bid submittal. Bids may be withdrawn/edited at any time prior to 2:00 pm on Tuesday, December 15, 2026 The City may consider as irregular any bid on which there is an alteration of or departure from the bid form provided and, at its option, may reject the bid. Award of a contract resulting from this bid will be based on Section below titled: Bid Opening. Bidders shall correctly complete the Pricing Schedule/Bid Sheet to submit pricing via the City's eProcurement Portal . Each bidder shall be fully authorized to submit a bid on behalf of the firm. If the bid is made by a sole proprietorship or partnership, the name and address of the sole proprietorship or partnership shall be shown, together with the names and addresses of the proprietor or partners. If the proposal is made by a corporation or other business entity, an official who is authorized to bind the corporation or other business entity shall sign in the name of such corporation or business entity. The City will consider as incomplete and may reject any bid not displaying the information required by this Section. City representatives and the successful bidder shall hold a pre-construction conference upon contract award. This conference will be for the purpose of reaching a complete understanding with the successful bidder concerning quality of work expected, work schedule and time of completion, work progress, and coordination of all construction. BID GUARANTEE Each bid proposal shall be accompanied by a bid guarantee which shall not be less than five percent (5%) of the bid amount. The 5% bid guarantee may be in the form a bid bond secured and issued by a surety or guaranty company authorized to do business in the State of Wyoming or a cashier’s check made payable to the City of Cheyenne. Cash deposits, personal checks or company checks (unless certified) will not be accepted. If the bid guarantee is to be submitted in the form of a bid bond, bidders must use the attached bid bond form. No deviation from the attached form will be allowed. If a surety company’s bid bond form is used, the wording shall be exactly as shown on the City’s bid bond form. No bid will be considered unless it is accompanied by the required guarantee. The bid guarantee shall ensure the execution of the agreement. The successful bidder shall furnish a surety bond as required by the Contract Documents. If the Contractor (i) withdraws the bid within 60 days after bid opening, (ii) fails to provide performance and payment bonds, (iii) or fails to provide the minimum insurance certificates within the time required by Wyo. Stat. § 15-1-113 after the City accepts the proposal, then the bidder shall be liable to the City for default in the amount set forth on the bid bond as liquidated damages for said default. Bid guarantees of unsuccessful bidders will be returned as soon as practicable after bid proposals are opened. COLLUSIVE AGREEMENTS Each bidder submitting a bid to the City for any portion of the work contemplated by the documents on which bidding is based shall execute and attach thereto an affidavit substantially in the form herein provided to the effect that he or she has not colluded with any other person, firm, or corporation in regard to any bid submitted. STATEMENT OF BIDDER QUALIFICATIONS Each bidder shall, upon the City’s request, submit satisfactory evidence that the bidder has practical knowledge of the particular work being bid upon, and has the necessary financial resources required to complete the proposed work. In awarding the contract, the City will give due consideration to the ability, reliability, work load, and general reputation of each bidder, as well as the City’s past experience with the bidders. Each bidder, upon the City’s request, shall show that prior work performed by the bidder has been handled in such a manner that there are no just or proper claims against such work. No bid proposal will be acceptable if the bidder is engaged in any other work which impairs his or her ability to finance this contract or provide equipment for the proper execution of the contract. UNIT PRICES If unit prices are called for, the unit price of each item in the proposal shall include the pro rata share of overhead and profit. As such, the sum of the products obtained by multiplying the quantity shown for each item by the unit price bid equals the total bid. The City may reject as irregular any bid not conforming to this requirement. Bidders should pay special attention to this provision. If conditions make it necessary to revise bid quantities, no limit will be fixed for such quantity revisions, provided the net cash value of all such additive and subtractive changes shall not change the original, total contract price by more than twenty percent (20%). The quantities appearing on the proposal form are approximate and are prepared for the comparison of bids. Payment to the contractor will be made only for the actual, accepted quantities of work performed and materials furnished in accordance with the contract. The presence of any unit bid price that generates reasonable doubt that award to that bidder would result in the lowest ultimate cost to the City may be rejected as irregular. TIME FOR RECEIVING BIDS Bid proposals received before the advertised time for opening bids will be kept securely sealed until the time arrives to open bids. The officer whose duty it is to open bids will decide when the specified time has arrived, and no bid received thereafter will be considered. BID OPENING At the time and place fixed for opening bids, the City will open and publicly read aloud every bid received within the time set for receiving bids, irrespective of any irregularities therein. Bidders and other persons properly interested may be present in person or by representative. BID WITHDRAWAL Bids may be withdrawn via the City's eProcurement Portal at any time prior to the scheduled closing time for receipt of proposals. CONTRACT AWARD AND BID REJECTION The City will award the contract to the most qualified and responsible bidder, as determined in the City’s sole discretion, who submits the lowest total responsive bid shown on Itemized Bid Sheet “A” plus “B”. This bid must also be less than funds available for this project. The City reserves the right to reject a bid if the total bid shown on the last Itemized Bid Sheet is not identical to the total bid shown on the Bid Proposal Sheet, included in this Bid Packet. The City reserves the right to reject a bid if the total bid price shown on the last Itemized Bid Sheet is not calculated correctly. The City reserves the right to reject any or all proposals or to waive any formality or irregularity in any proposal in the interest of the City. No bidder may withdraw his proposal for a period of 60 days after the date of opening thereof. FUNDS PROGRAMMED The funds programmed for construction are estimated to be sufficient to provide for the proposed work shown on the plans. In the event contract unit prices indicate a total cost of the project in excess of the allotted funds, the project length may be shortened or quantities decreased to keep the cost of work within the funds allocated to the project. Similarly, if the contr Source: OpenGov https://procurement.opengov.com/portal/cheyennecity/projects/322486 Canonical URL: https://govcontractfinder.com/contracts/pershing-and-windmill-intersection-signal-opengov-4025-project-322486