Professional Construction Management/General Contracting Services for the Volusia County Branch Jail Air Handler and Fire Alarm Project State and local opportunity open County of Volusia 27-SQ-14KO, C2102 Posted: 2026-10-22T15:03:26.431Z Response deadline: 2026-12-03T20:00:00.000Z Volusia County Branch Jail — Air Handler & Fire Suppression System Replacement and Upgrade Volusia County is seeking qualified Construction Management and General Contractor firms to deliver a major life-safety and HVAC renewal at the Volusia County Branch Jail, 1300 Red John Drive, Daytona Beach. The facility is a single-story detention center that operates around the clock. Its core building systems have reached the end of their service life at the same time, and they no longer meet current code for detention occupancies. Those systems are the housing-pod air handling units, the fire/smoke dampers, the fire alarm system, and the smoke control system. The project restores reliable conditioned air to every housing pod and brings the facility's life-safety systems up to current NFPA, Florida Fire Prevention Code, and UL standards. The work includes replacing the pod chilled-water air handling units along with their mechanical-room ductwork, coils, and outside-air louvers. Fire/smoke dampers will be replaced facility-wide with UL 555/555S rated units. New smoke exhaust fans will give each pod its own isolation and purge capability for the first time. The existing fire alarm system will be replaced with a networked, addressable system running on redundant fiber-optic communication loops. New equipment will be integrated with the facility's building automation system. Design is complete through a Bid Set prepared by Dewberry (mechanical) and Ingenuity Engineers (electrical and fire alarm). Because the jail remains fully occupied throughout construction, success depends on a qualified General Contractor with strong phasing, coordination, and life-safety management skills. The selected firm will manage the following: Temporary cooling for occupied pods Security protocols, including background checks, escorts, and coordination around inmate movement Close coordination with Corrections staff and County Facilities Management Scope of Work VCBJ Air Handler-Fire Alarm Removal and Replacement VOLUSIA COUNTY FACILITIES MANAGEMENT Scope of Work — CM/GC Delivery Project VCBJ Air Handler / Fire Suppression System Removal, Replacement and Upgrade — CA No. 26308 Location Volusia County Branch Jail, 1300 Red John Drive, Daytona Beach, FL (occupied 24/7 detention facility) Design Team Dewberry Inc. (Mechanical, 50166610) / Ingenuity Engineers, Inc. (Electrical & Fire Alarm, I22569.00) Delivery CM/GC — Phase I Preconstruction (fixed fee); Phase II Construction under a GMP 1. Project Summary Replace the end-of-life air handling units, smoke exhaust fans, fire/smoke dampers, and facility fire alarm system at the Branch Jail, and upgrade smoke control to provide per-pod isolation and purge. The County is using CM/GC delivery so the contractor can help resolve open design items, verify existing conditions, and plan phasing before a GMP is set. 2. Phase I — Preconstruction Services Task CM/GC Responsibility Document review Constructability review at each milestone; comment log tracked to resolution; pricing input on open items (Section 6). Existing conditions Field-verify AHUs, piping, ducts, rigging paths, roof, and electrical capacity. Survey fire alarm conduit for reuse. Provide written deficiency report on damper relay panels. Phasing & logistics Pod-by-pod phasing with Corrections; temporary cooling plan; fire alarm/smoke control cutover and fire watch plan; security plan. Cost & schedule Milestone estimates, value analysis, master schedule, and early release of long-lead equipment if authorized. Procurement & GMP Competitive trade bidding with open tabulations; GMP with clarifications, allowances, contingency, and schedule of values. 3. Phase II — Construction Scope System Scope Air handling units Demolish existing AHUs and in-room ductwork/piping to points of disconnect. Install new chilled-water AHUs per M0.2 (AHU-1.1 through AHU-16, plus AHU-K kitchen RTU with curb adapter). Replace HW reheat coils and OA louvers like-for-like. Hydronics New CHW/HW piping from risers, valves, balancing, gauges, insulation, supports, vibration isolation, and identification. Smoke control Replace purge/exhaust fans (SEF series, UL smoke-control rated); replace fire/smoke dampers facility-wide (UL 555/555S); repair damper relay panels; implement per-pod isolation and purge sequences per E6.04. Controls / BAS Controls for all new equipment integrated with the BAS, with graphics, alarms, and point verification. Final extent confirmed in preconstruction. Fire alarm Full replacement: networked addressable system, pod FACPs #1–#10 and Master FACP on redundant Class A 2-hr fiber loops; voice evacuation; all HVAC, damper, door, PA, and lockdown interfaces; approx. 68 new devices; reuse existing conduit where devices stay in place. Electrical Power to new equipment, disconnects and VFD wiring, panel modifications per E10 series, grounding, surge protection, and demolition of existing HVAC electrical to source. Temporary work Temporary cool air units while units are being replaced; fire watch not required whenever life-safety systems are impaired. Closeout TAB, HVAC commissioning, NFPA 72 and smoke control acceptance testing, AHJ inspections, training, O&M manuals, and record drawings. 4. Detention Facility Requirements Background checks, escorts, and controlled tool and material inventories for all personnel. Work in or near housing pods scheduled with facility staff; existing security features and lockdown systems remain intact at all times. Fire Marshal notification and 24-hour watch before disabling any existing smoke control or fire alarm system. 5. Allowances and Contingency Existing conduit replacement — Owner allowance in the GMP, sized from the preconstruction survey; written authorization required before use. Damper relay panel repairs — allowance until the deficiency report defines the work. CM contingency in the GMP; Owner contingency held separately by the County. 6. Exclusions Ductwork and controls beyond the mechanical rooms and penthouses serving the pods. Central chilled-water and hot-water plants (existing to remain). Hazardous materials abatement, unless identified and priced in the GMP. Introduction Summary Background Contact Information Timeline Purpose and Overview Purpose and Overview The purpose of this request for statement of qualifications (RSQ) is to select the most highly qualified firm or firm(s) to provide the requested services. It is anticipated that one (1) firm or multiple firms will be awarded a basic contract to provide the necessary services for a period of NO VALUE may be allowable exercisable at the option of the County and as approved by the County and mutually agreed upon. This solicitation is made in accordance with the provisions of Chapter 287.055, Laws of Florida, known as the Consultants’ Competitive Negotiation Act (CCNA). Special Terms and Conditions Closing Date and Non-mandatory Pre-Solicitation Conference A. Request for Statement of Qualifications (RSQ) Closing Date Response must be received through the County's eProcurement Portal before 3:00 pm on Thursday, December 3, 2026 . Responses received after this time will not be considered. B. Pre-solicitation Conference 1. A non-mandatory pre-solicitation conference will be held at 9:00 am on Thursday, November 12, 2026 at 1300 Red John Drive, Daytona Beach FL, 32124 . While this is not mandatory, all interested parties are encouraged to attend and participate. 2. In accordance with the American Disabilities Act and Section 286.26, Florida Statutes, persons with disabilities needing a special accommodation to participate in the proceedings, or an interpreter to participate in any proceedings, should contact the County’s ADA Coordinator at 386‑248‑1760 for assistance, at least two (2) business days before any meeting date. Assisted listening system receivers are available for the hearing impaired, and can be obtained from the Deputy Clerk by contacting the County’s ADA Coordinator at 386-248-1760. Read the full ADA Notice under The American with Disabilities Act (Title II), at County of Volusia Notice Under the Americans With Disabilities Act (Title II) . Read the County of Volusia Grievance Procedure under The Americans with Disabilities Act (Title II). 3.Non-mandatory Pre-solicitation: You may RSVP via the County's eProcurement Portal. The County will electronically record attendance of the firms via the County's eProcurement Portal. Additionally, the County of Volusia reserves the right to add a second pre-bid meeting, if the County deems it necessary. Authorized Official The Solicitation response and all required forms must be submitted/signed by an official authorized to legally bind the Respondent to all Solicitation provisions. A Memorandum of Authority may be submitted to document that the individual is authorized to commit the firm to a contract. Payment Terms 1. The County will remit full payment on all undisputed invoices within forty-five (45) business days from receipt by the appropriate person(s) (to be designated at time of Agreement) of the invoice(s) or receipt of all products or services ordered. 2. Pursuant to Chapter 218, Florida Statutes, the County will pay interest not to exceed one percent (1%) per month on all undisputed invoices not paid within thirty (30) days after the due date. 3. The County has the capability of Electronic Funds Transfer (EFT). List any discounts for prompt payment and/or willingness to accept Electronic Funds Transfer (EFT) and the discount to be applied to such payments. Contractor s offering prompt payment discounts, for example 1% - net 10, the discount shall be taken if the check issue date is within specified time period from date of invoice. By submitting a Response to the County of Volusia, Florida, the Respondent expressly agrees that, if awarded an Agreement, the County may withhold from any payment monies owed by the Respondent to the County for any legal obligation between the Respondent and the County, including, but not limited to, real property taxes, personal property taxes, fees, and commissions. Award Term The County is looking to promote partnership relationships within the policies and procedures of public procurement. Pursuant toward that end, the successful Respondent shall be awarded an Agreement for an initial 610 Days or until project completion, whichever occurs first. term with the option for No renewals . All renewals will be contingent upon mutual written agreement and, when applicable, approval of County Council. Damages Due to the nature of the services to be provided and the potential impact to the County for loss, the awarded Respondent cannot disclaim consequential or special damages related to the performance of this Agreement. The awarded Respondent shall be responsible and accountable for any and all damages, directly or indirectly, caused by the actions or inaction of its employees, staff, or Subcontractor . There are no limitations to this liability. This section does not apply to the extent precluded or prohibited by applicable law. Liquidated Damages Time is of the essence for this project. Any delays from the dates contained in the Agreement issued to the awarded Respondent shall inconvenience the Public and result in monetary losses and damages to the County. The losses and damages shall be difficult to determine. In the event that the deliverables are not provided by the date set in the resulting Agreement, there shall be deducted, as agreed, fixed liquidated damages from the Agreement price being paid by the County of Volusia. This computed sum shall be Two Thousand Five Hundred Dollars ($2,500) per day , including Saturdays and Sundays. Such sums are hereby agreed to be reasonable predictions of damages, which will be sustained and are specifically declared to not constitute a penalty for breach of contract. Evaluation Method The County will appoint a committee consisting of County staff to evaluate the proposals and to make recommendation to the County Council. The County will be the sole judge of its own best interests, the proposals, and the resulting Contract, if any. The County’s decisions will be final. Award will be made to the proposal(s), which presents the best value to the County based on the entire evaluation process and all the information gathered. Note: Respondents are prohibited from contacting any of the committee members, other than the Procurement Analyst, prior to the recommendation of award from the committee . Presentations by Respondents 1. The County of Volusia, at its sole discretion, may ask individual Respondents to make oral presentations and/or demonstrations without charge to the County. 2. The County reserves the right to require any Respondent to demonstrate to the satisfaction of the County that the Respondent has the fiscal and managerial abilities to properly furnish the services proposed and required to fulfill the requirements of the RSQ. The demonstration must satisfy the County and the County shall be the sole judge of compliance. 3. Respondents are cautioned not to assume that presentations will be required and should include all pertinent and required information in their original proposal package. Proposal Acceptance/Rejection The County reserves the right to accept or reject any or all proposals received as a result of this Solicitation, or to negotiate separately with competing Respondents, and to waive any informalities, defects, or irregularities in any proposal, or to accept that proposal or proposals, which in the judgment of the proper officials, is in the best interest of the County. Proposal Acceptance Period Any Proposal in response to this RSQ shall be valid through June 3, 2027 . At the end of this time the proposal may be withdrawn at the written request of the Respondent if no award has been made. If the Proposal is not withdrawn at that time it remains in effect until an award is made or the solicitation is canceled regardless of the status of the proposal bond. The County reserves the right to request an extension of the proposals if a Contract has not been executed by June 3, 2027 . Termination (RSQ) The performance of Work or Services under a Contract may be terminated by the County in accordance with this clause in whole or from time to time in part, upon at least thirty (30) days prior written notice to Contractor whenever the County shall determine that such termination is in the best interest of the County. Any such termination shall be effected by delivery to the Contractor of a Notice of Termination specifying the extent to which performance of work under a Contract is terminated, and the subsequent date upon which such termination becomes effective. County may terminate a Contract in whole or part for convenience at will or for non-appropriation of funds by County. Upon receipt of such notification, Contractor shall inform County of the extent to which performance is completed and unless notified in writing by the County otherwise, the Contractor shall take no further steps towards completion of the Project. Upon payment by County, Contractor shall deliver to County any and all completed Deliverables and Deliverables-in-progress that then exist for the Project. If the County terminates the Project due to the Contractor ’s failure to meet a completion deadline as set forth in a Contract, the County may seek the services for the Project from another consultant and no sums shall be due to the Contractor as a result of any work or services that have been performed by the Contractor for the Project. After receipt of a Notice of Termination as set forth in above, and except as otherwise directed by the County, the Contractor shall: Stop work under a Contract on the date and to the extent specified in the Notice of Termination. Place no further orders or subcontracts for materials, services or facilities, except as may be necessary for completion of such portion of the work under a Contract, as it is not terminated. Terminate all orders and subcontracts pursuant to this Article to the extent that they relate to the performance of Work or Services terminated by the Notice of Termination. Assign to the County, in the manner, at the times and to the extent directed by the County, all of the right, title, and interest of the Contractor under the orders and subcontracts so terminated, in which case the County shall have the right, in its discretion, to settle or pay any or all claims arising out of the termination of such orders and subcontracts. With the approval of the County and to the extent required by the County, settle all outstanding liabilities and all claims arising out of such termination of orders and subcontracts. County's approval of such settlements shall be final for all the purposes of a termination under the Article. In addition, Contractor shall transfer title and deliver to the County, in the manner, at the times, and to the extent, if any, directed by the County: The sketches, calculations, reports, models, studies and other Work-in-process, completed Work or Services, supplies, and other materials produced as a part of, or acquired in connection with the performance of the Work or Services terminated by the Notice of Termination; and, The completed or partially completed designs, plans, drawings, information, and other property, which, if the Contract has been completed, would have been required to be furnished to the County. Contractor shall complete performance of such part of the Work or Services as shall not have been terminated by the Notice of Termination. After receipt of a Notice of Termination, the Contractor shall submit to the County its termination claim, in the form and with a certification as prescribed by the County. Such claim shall be submitted promptly but in no event later than thirty (30) days from the effective date of termination, unless one (1) or more extensions in writing are granted by the County, upon request of the Contractor made in writing within such thirty (30) day period or authorized extension thereof. Upon failure of the Contractor to submit its termination claim within the time allowed, the County may determine on the basis of information available to it, the amount, if any, due to the Contractor by reason of the termination and shall there upon pay to the Contractor the amount so determined. Subject to the provisions of set forth above, the Contractor and the County may agree upon the whole or any part of the amount or amounts to be paid to the Contractor by reason of the total or partial termination of work pursuant to this Article which amount or amounts may include a reasonable allowance for profit on work done; provided, that such agreed amount or amounts exclusive of settlement costs, shall not exceed the total contract price or Compensation as reduced by the amount of payments otherwise made and as further reduced by the contract price of Compensation for Work not terminated. As such, the Contract shall be amended accordingly and the Contractor shall be paid the agreed amount. Nothing herein, prescribing the amount to be paid to the Contractor in the event of failure of the Contractor and the County to agree upon the whole amount to be paid to the Contractor by reason of the termination of Work or Services pursuant to this clause, shall be deemed to limit, restrict, or otherwise determine or affect the amount or amounts which may be agreed upon to be paid to the Contractor . In the event of the failure of the Contractor and the County to agree as provided in Section 6. above upon the whole amount to be paid to the Contractor by reason of the termination of work pursuant to this Article, the County shall pay to the Contractor the amounts determined by the County as follows, but without duplication of any amounts already agreed upon by the parties. For completed Work or Se Source: OpenGov https://procurement.opengov.com/portal/volusia/projects/317591 Canonical URL: https://govcontractfinder.com/contracts/professional-construction-management-general-contracting-ser-opengov-3861-project-317591