Repair to Surfside Boulevard Bridge over Maxine Canal State and local opportunity open City of Cape Coral, FL 2027-ITB-PW-013-KR Posted: 2026-11-24T12:30:01.579Z Response deadline: 2026-12-30T20:00:00.000Z The City of Cape Coral was incorporated in 1970 and operates under the Council/City Manager form of government. The City Council has eight members consisting of the mayor and seven members all elected at large on a nonpartisan basis. City Council is responsible for all policy-making functions of the government and retains the services of a City Attorney, City Auditor and City Manager. The City Manager is responsible for all administration of the City, which provides a comprehensive range of municipal services including general government, public safety, community services, public works, planning, utilities, and parks and recreation. Cape Coral is the 8th largest city by population and the 3rd largest by land mass in Florida. Cape Coral currently has a population of more than 200,000 residents and is experiencing high growth. As a pre-platted community, Cape Coral could have more than 360,000 residents at buildout. The city has a sub-tropical lifestyle with thousands of waterfront residential properties on almost 400 miles of canals. About two-thirds of these canals provide boaters with direct access to the Gulf of Mexico. Technical Specification or Scope of Work Scope of Work The existing canal embankment, gravity wall, sidewalk, concrete slope pavement, and canal bottom at Surfside Boulevard over Maxine Canal, Bridge GAC 113, have sustained storm-related damage. These conditions have resulted in erosion, undermining, settlement of existing roadside and bridge approach features, embankment fill loss, and scour within and adjacent to the bridge structure. The proposed improvements are intended to stabilize the canal embankment and bridge approaches, protect the bridge structure from continued erosion and scour, and provide a long-term repair consistent with the construction plans, specifications, FDOT requirements, and applicable Federal-Aid requirements. The consulting engineer has completed detailed construction plans for the permanent repairs to Surfside Boulevard over Maxine Canal, Bridge GAC 113. The work generally consists of installing permanent scour protection within the canal, including bedding stone and rubble riprap; restoring eroded and undermined embankment areas; replacing settled gravity wall sections; replacing damaged sidewalk; replacing non-reinforced concrete slope pavement; salvaging and reinstalling existing pedestrian guiderail as required; and providing erosion control, turbidity control, channel closure coordination, and Maintenance of Traffic necessary to complete the work. The Contractor shall furnish all labor, equipment, materials, permits, authorizations, supervision, survey, layout, testing coordination, temporary works, access, staging, environmental protection, Maintenance of Traffic, documentation, and incidentals necessary to complete the permanent repair work in accordance with the construction plans, FDOT Standard Specifications, applicable special provisions, permits, and supporting documentation included in this solicitation package, including the specific tasks and requirements described herein. Bidder must have Class "C" prequalification for work code #37 - R&R minor bridges to be deemed responsive. TASKS Mobilization, Site Access, and Staging: Mobilize labor, equipment, materials, and supervision necessary to complete the work. Establish construction access points, staging areas, material storage areas, and work zones in accordance with the construction plans, permits, Maintenance of Traffic requirements, and City requirements. The Contractor shall limit disturbance to the minimum area necessary to complete the work and shall protect existing improvements, utilities, bridge elements, canal embankments, pedestrian facilities, roadway features, and adjacent properties throughout construction. Maintenance of Traffic and Channel Closure Coordination: Provide, install, maintain, adjust, and remove all required Maintenance of Traffic devices and temporary traffic control measures during the course of the project. Maintenance of Traffic shall be in accordance with applicable FDOT requirements, the approved MOT plan, the construction plans, and City requirements. Vehicular, pedestrian, bicycle, emergency, maintenance, and adjacent property access shall be maintained as required. The Contractor shall also coordinate with the City of Cape Coral for channel closure notifications and installation of signage notifying the public of channel closures. Required signs shall be installed two (2) weeks prior to construction. Signage may include up to five (5) portable changeable message signs to be furnished, installed, maintained, and removed by the Contractor. The City will furnish two single-post signs to be installed and later removed by the Contractor within the right-of-way to be visible from the canal. Channel closure shall be coordinated with the City and shall be limited to the extent necessary for safe construction operations, equipment movement, and placement of scour protection materials. If conditions for boat traffic are deemed unsafe during construction activities, the Contractor shall close access to the channel and immediately notify the Engineer and the City of Cape Coral. Demolition, Removal of Existing Concrete, and Site Preparation: Remove existing damaged concrete slope pavement, settled or damaged gravity wall sections, affected sidewalk, unsuitable materials, debris, and other items required to complete the permanent repairs to the limits shown in the construction plans. Demolition shall be performed carefully to avoid damage to existing bridge components, wingwalls, utilities, gravity wall sections to remain, pedestrian railing/guiderail to be salvaged and reinstalled, adjacent properties, canal embankments, and other infrastructure. Salvage and Reinstallation of Aluminum Pipe Guiderail: Salvage, protect, store if necessary, and reinstall existing aluminum pipe guiderail in accordance with the construction plans and applicable FDOT requirements. Work shall include removal, protection, temporary storage, reinstallation, adjustment, anchorage, restoration, and all incidental materials and labor required to provide a complete and accepted installation. Excavation, Embankment Restoration, and Backfill: Perform all required excavation, embankment restoration, fill placement, grading, and compaction to the lines, grades, depths, and limits shown in the construction plans. Work shall include removal of unsuitable materials, preparation for gravity wall replacement, sidewalk replacement, slope pavement replacement, bedding stone placement, rubble riprap installation, and other work necessary to complete the project. Placement of fill and backfill shall be performed in a controlled manner to avoid movement or damage to the existing bridge, gravity wall sections to remain, sidewalk, slope pavement, utilities, canal embankment, and adjacent improvements. Removal and Disposal of Materials: Dispose of all removed materials, unsuitable materials, debris, and waste from the project site in an approved manner at an appropriate facility in accordance with federal, state, and local guidelines, ordinances, and codes. The Contractor Payment and Measurements Bid Tab Item 1: Sediment Barrier (Refer to FDOT Pay Item 104-10-3 for additional details) Sediment Barrier shall consist of furnishing, installing, maintaining, inspecting, adjusting, relocating as necessary, and removing sediment barrier at the locations shown in the construction plans or as otherwise required for erosion and sediment control. Sediment barrier shall be maintained in effective operating condition until the site is stabilized and accepted by the City. Sediment Barrier shall be bid, measured, and paid on a linear foot (LF) basis. Such price and payment shall be full compensation for all equipment, labor, materials, installation, maintenance, inspection, adjustment, relocation, removal, cleanup, and incidentals required to complete the work . Bid Tab Item 2: Floating Turbidity Barrier (Refer to FDOT Pay Item 104-11 for additional details) Floating Turbidity Barrier shall consist of furnishing, installing, maintaining, adjusting, relocating as necessary, and removing floating turbidity barrier for work within and adjacent to Maxine Canal. The Contractor shall maintain the turbidity barrier in effective operating condition for the duration of the work requiring turbidity control. Floating Turbidity Barrier shall be bid, measured, and paid on a linear foot (LF) basis. Such price and payment shall be full compensation for all equipment, labor, materials, installation, maintenance, inspection, adjustment, relocation, removal, and incidentals required for a complete turbidity control installation. Bid Tab Item 3: Removal of Existing Concrete (Refer to FDOT Pay Item 110-4-10 for additional details) Removal of Existing Concrete shall consist of removing existing damaged concrete slope pavement, settled or damaged concrete sidewalk, affected concrete gravity wall sections, deteriorated concrete, and other concrete elements to the limits shown in the construction plans or as directed by the Engineer. Work shall include sawcutting, breaking, removal, loading, hauling, disposal, and all labor, equipment, tools, and incidentals necessary to complete the work. Removal and disposal of existing concrete shall be bid, measured, and paid on a square yard (SY) basis. Such price and payment shall be full compensation for all equipment, labor, materials, sawcutting, breaking, loading, hauling, disposal fees, site preparation, cleanup, and incidentals required for complete removal and disposal of the existing concrete. Bid Tab Item 4: Embankment (Refer to FDOT Pay Item 120-6 for additional details) Embankment shall consist of furnishing, placing, grading, shaping, and compacting suitable embankment material to restore eroded and undermined areas and construct the embankment to the lines, grades, elevations, and limits shown in the construction plans. Work shall include placement adjacent to the gravity wall, sidewalk, slope pavement, bridge approaches, canal embankment, and other areas requiring restoration. Embankment shall be bid, measured, and paid on a cubic yard (CY) basis. Such price and payment shall be full compensation for all equipment, labor, materials, hauling, placement, grading, compaction, testing coordination, protection of existing improvements, and incidentals required to complete the embankment work. Bid Tab Item 5: Concrete Class NS, Gravity Wall (Refer to FDOT Pay Item 400-0-11 for additional details) Concrete Class NS, Gravity Wall shall consist of furnishing and constructing replacement gravity wall sections to the limits shown in the construction plans and in accordance with applicable FDOT Standard Plans. Work shall include removal coordination, foundation preparation, forming, Class NS concrete, reinforcing steel if required by the applicable standard details, drainage materials, weep holes, joints, joint surface preparation, concrete placement, finishing, curing, connection to existing wall sections, and all incidental work necessary to provide a complete and accepted gravity wall installation. Replacement gravity walls shall match the existing alignment along the face of the wall and shall transition to match the top of sidewalk and adjacent wall elevations as shown in the construction plans. The Contractor shall prepare the joint surface of the existing gravity wall adjacent to the proposed gravity wall in accordance with the applicable standard wall joint details. This item shall also include all materials, labor, equipment, hardware, anchorage, protection, removal, storage if necessary, salvaging, and reinstallation of the existing pedestrian guiderail associated with the gravity wall work. Concrete Class NS, Gravity Wall shall be bid, measured, and paid on a cubic yard (CY) basis. Such price and payment shall be full compensation for all equipment, labor, materials, concrete, reinforcing steel if required, forming, foundation preparation, drainage materials, joint preparation, placement, finishing, curing, pedestrian guiderail salvage and reinstallation, cleanup, and incidentals required for a complete and accepted installation . Bid Tab Item 6: Concrete Slope Pavement, Non-Reinforced, 6 Inch (Refer to FDOT Pay Item 524-2-4 for additional details) Concrete Slope Pavement, Non-Reinforced, 6 Inch shall consist of constructing non-reinforced concrete slope pavement to the lines, grades, thicknesses, and limits shown in the construction plans. Work shall include removal coordination, subgrade preparation, embankment repair, forming, concrete placement, finishing, curing, joints, tie-ins to existing improvements, and restoration of adjacent disturbed areas. Concrete Slope Pavement, Non-Reinforced, 6 Inch shall be bid, measured, and paid on a square yard (SY) basis. Such price and payment shall be full compensation for all equipment, labor, materials, subgrade preparation, embankment preparation, forms, concrete, placement, finishing, curing, joints, cleanup, and incidentals required for a complete installation. Bid Tab Item 7: Rubble Riprap, Bank and Shore (Refer to FD Legal Notice - ITB The City of Cape Coral, Florida, is seeking bids for Repair to Surfside Boulevard Bridge over Maxine Canal , in accordance with 2027-ITB-PW-013-KR , in the State of Florida. A copy of the Invitation to Bid (ITB) Documents may be obtained online at https://procurement.opengov.com/portal/capecoralfl . Register to receive notifications of future opportunities and to view current solicitations. Sealed Bids will be publicly opened at Cape Coral City Hall, 1015 Cultural Park Blvd, Cape Coral, FL 33990 . The name of bidders responding to this bid and total bid dollar amount will be read at the bid opening. BIDS ARE DUE BY : 3:00 pm , Wednesday, December 30, 2026 - via Electronic Bid Platform (OpenGov) BIDS WILL OPEN: 3 :00 pm, December 30, 2026 - City Hall, 2 nd Floor, Room 252 NOTE: No questions will be accepted after 2:00 pm , Wednesday, December 9, 2026 , and all questions must be submitted through OpenGov at https://procurement.opengov.com/portal/capecoralfl . BIDS MUST BE RECEIVED ELECTRONICALLY ON THE BIDDING PLATFORM OPENGOV NO LATER THAN 3:00 pm , Wednesday, December 30, 2026 , BIDS SUBMITTED AFTER THAT TIME WILL NOT BE ACCEPTED. Pursuant to Florida State Statute 119.071 (2) Sealed bids, proposals or replies received by an agency pursuant to a competitive solicitation are exempt from s. 119.071(1) and s. 24(a), Art. I of the State Constitution until such time as the agency provides notice of intended decision or until 30 days after opening the bids, proposals, or final replies, whichever is earlier. BID SECURITY DOCUMENT(S) MUST BE INCLUDED WITH THE ELECTRONIC SUBMISSION PER THE DIRECTIONS LISTED IN THIE SOLICITATION. THE ORIGINAL(S) WILL BE REQUESTED FROM THE AWARDED CONTRACTOR PRIOR TO CONTRACT EXECUTION. The City reserves the right to reject any or all bids, award in whole or in part and to waive any irregularities or informalities when in the best interest of the citizens of the City of Cape Coral. By Order of the City Manager Kimberly Bruns, City Clerk MMC Released Date: Tuesday, November 24, 2026 Definitions Included in this section is a list of all definitions utilized by the City. Not all definitions will be utilized or apply to every solicitation issued. Definitions Addenda are issued electronically prior to the closing of solicitations which clarify, correct, or change the solicitation Requirements of the Contract Documents. Additional Services : The term “Additional Services” shall refer to such services as the City may request and authorize, in writing, that the Supplier or Program Manager (PM) perform relative to an Agreement which has not been identified in the original Scope of Services. Additional services shall be authorized by the execution of both Parties of an Agreement as a "Change Order", "Amendment" or "Work Authorization" when Work Authorizations apply. Agreement : The written contract between City and Contractor covering the work to be performed; other Contract Documents are attached to the Agreement and made a part thereof as provided therein. ARCHITECT/ENGINEERING (A/E) for this solicitation shall hereafter refer to City and/or City’s Engineering staff. Bid: The offer or proposal of the bidder setting forth the prices for the work to be performed. Also referred to as “e-bid” or electronic bid. Change Order : Document recommended by A/E (which is signed by Contractor and/or Owner and authorizes an addition, deletion or revision in the work, or an adjustment in the Contract Price or the Contract Time. City: Shall be understood as referring to the City of Cape Coral, Florida. City Representative : The term “City Representative” shall mean the person designated by the City (or their designee) to act on the City’s behalf with respect to the Program or Project and be the primary point of contact. Consultant: Provider of Services, can also be referred to as Proposer, FIRM, Consultant, Contractor or Awarded Firm. Construction Documents : The term “Construction Documents” shall mean the written specifications, design drawings and other specified documents that provide the requirements of construction provided under an agreement or Work Authorization. Contract Administrator : Wherever in the Contract the word “Contract Administrator” is used it shall be understood as referring to the Contract Administrator of the Owner, acting personally or through any assistants duly authorized in writing for such by the Owner. Contract Documents are the agreement, Addenda, Contractor’s response, except when it conflicts with any other contractual provision, the Notice to Proceed, the Bonds, this solicitation Package, these General Conditions, the Specification and Drawings, any Special Conditions, together with all Written Amendments, Change Orders, Work Change Directives or Field Orders. Contract Duration : The term “Contract Duration” shall mean the for agreed upon calendar days that are specified in the agreement or Work Authorizations. Can also be referred to as “Contract Time”. Contract Price is the monies payable by the City to the Contractor for completion of the work in accordance with the Contract Documents as stated in the Agreement or Work Authorization. Contract Time is the number of calendar days or the dates stated in the Agreement or Work Authorization. Contractor: Shall be understood as referring to the individual, corporation, or partnership whose name appears on the Contract. Days : As used in this Agreement, the term “days” means calendar day unless expressly stated otherwise Design-Build Firm: Provider of Services, can also be referred to as Proposer, FIRM, Consultant, Contractor or Awarded Firm Effective Date of the Agreement is the date indicated in the Agreement or Work Authorization on which it becomes effective, but if no such date is indicated it means the date on which the Agreement or Work Authorization is signed by the last party. Facility : The term “Facility” is defined as any City owned property. Final Completion : The term “Final Completion” is defined as the point when the full scope of work associated with any agreement or Work Authorization (WA) has been fully completed. Guaranteed Maximum Price : The term “Guaranteed Maximum Price (GMA)” is defined as the contractual cost established by the Contractor or Program Manager and accepted by the City for an agreement or Work Authorization (WA). MBE/WBE/SBE: Minority Business Enterprise/Women Business Enterprise/Small Business Enterprise. A certified minority business enterprise is defined by Florida Small and Minority Business Assistance Act of 1985. If applicable, the primary proposing firm sh Source: OpenGov https://procurement.opengov.com/portal/capecoralfl/projects/322216 Canonical URL: https://govcontractfinder.com/contracts/repair-to-surfside-boulevard-bridge-over-maxine-canal-opengov-658933915-project-322216