Request for Proposals for Design-Build Services for SR 516 Photovoltaic Deployments Phase A [Project No. 516-409A] State and local opportunity open Central Florida Expressway Authority 271005 Posted: 2026-10-28T17:30:00.693Z Response deadline: 2026-12-21T18:30:00.000Z NOTICE IS HEREBY GIVEN that the Central Florida Expressway Authority, henceforth referred to as the CFX is accepting sealed offers for: Request for Proposals for Design-Build Services for SR 516 Photovoltaic Deployments Phase A [Project No. 516-409A] Project Summary: The work under this Contract consists of providing all design and construction services necessary for the installation of elevated ground mounted photovoltaic solar array systems in dry ponds at two locations: SR 516 Mainline Toll Plaza site (approximately 235 kWdc) and the SR 516 Valencia Parkway Ramp site (approximately 265 kWdc). The Design-Builder shall perform all required investigations, analyses, coordination efforts, and engineering design services necessary to develop and obtain approval of final construction plans for two fully operational photovoltaic array systems. The scope of work includes, but is not limited to, the design and construction of array structures, photovoltaic panels, mounting and racking systems, drainage improvements, electrical distribution infrastructure, utility interconnections, permitting, maintenance of traffic, and all other components required for a complete and functional installation. The Design-Builder shall provide signed and sealed construction plans for the photovoltaic systems and all associated components. The Design-Builder shall furnish and install all equipment and materials necessary for the operation of the photovoltaic systems, including photovoltaic modules, mounting structures, inverters, wiring, transformers, and related electrical and structural components. The completed systems shall be fully interconnected with the utility service and configured for net metering in accordance with applicable utility requirements Sealed offers for furnishing the above will be accepted up to Monday, December 21, 2026 1:30 pm . NOTE: Respondents are required to submit responses electronically via the OpenGov e-Procurement Platform. Respondents shall not be permitted to hand-deliver, mail, telephone, fax or email offers. Responses received after the submission deadline and/or transmitted outside of the designated OpenGov e-Procurement Platform shall be rejected. Important Instructions for Electronic Submittal CFX is ONLY accepting electronic submissions using the OpenGov e-Procurement Platform. Respondents shall create a FREE account with OpenGov by signing up at https://procurement.opengov.com/login . Once you have completed account registration, browse back to this page, click on "Submit Response", and follow the instructions to submit the electronic offer. It is the respondent's responsibility to ensure they commence their upload efforts timely to meet the submission deadline. CFX shall not be responsible for delays caused by any occurrence, including the respondent's network delays, bandwidth issues, internet outages, or technical difficulties. OpenGov Technical Support For Technical Support, respondent's can reach the OpenGov Service Desk: Live Chat: Click the blue chat button on the lower right, hours: Mon-Fri 7am - 10pm EST Email: procurement-support@opengov.com Phone: 1 (650) 336-7167, hours: Mon-Fri 7am - 10pm EST Price Proposal Item Schedule Required below is an itemized pricing form, proposers shall submit complete, balanced, and itemized pricing, with pricing assigned to each applicable line item requested. Unit prices shall be entered in U.S. dollars and cents using no more than two (2) decimal places. Prices submitted beyond two decimal places will be rounded up to the nearest cent for purposes of calculating extensions, subtotals, and the total pricing. Proposers are cautioned not to enter $0.00 or negative unit prices. A unit price of $0.00 or negative will be interpreted as an exclusion of that line item and the price proposal will be deemed non-responsive. In the event of extension error(s), the unit price will prevail and the Respondent’s total offer will be corrected accordingly. Respondents must check their pricing and extensions where applicable. Failure to do so will be at the Respondent’s risk. The respondent shall include all costs associated with utility coordination and permitting, including the cost to apply for net metering agreements in line-item number 5 below. DESIGN SERVICES - SR 516 MAINLINE DESIGN SERVICES - VALENCIA PARKWAY CONSTRUCTION SERVICES - SR 516 MAINLINE CONSTRUCTION SERVICES - VALENCIA PARKWAY UTILITY COORDINATION AND PERMITS ALLOWANCE FOR DISPUTES REVIEW BOARD WORK ORDER ALLOWANCE Notice to Design-Build Contractors / Design Professionals Overview Central Florida Expressway Authority (CFX) requires the services of a Design-Build Firm/Team in connection for the design and construction of the SR 516 Photovoltaic Deployments Phase A. Description of Services The services to be provided consist of, but are not necessarily limited to providing all design and construction services necessary for the installation of elevated ground mounted photovoltaic solar array systems in dry ponds at two locations: SR 516 Mainline Toll Plaza site (approximately 235 kWdc) and the SR 516 Valencia Parkway Ramp site (approximately 265 kWdc). The Design-Builder shall perform all required investigations, analyses, coordination efforts, and engineering design services necessary to develop and obtain approval of final construction plans for two fully operational photovoltaic array systems. The scope of work includes, but is not limited to, the design and construction of array structures, photovoltaic panels, mounting and racking systems, electrical distribution infrastructure, utility interconnections, permitting, maintenance of traffic, and all other components required for a complete and functional installation. The Design-Builder shall provide signed and sealed construction plans for the photovoltaic systems and all associated components. The Design-Builder shall furnish and install all equipment and materials necessary for the operation of the photovoltaic systems, including photovoltaic modules, mounting structures, inverters, wiring, transformers, and related electrical and structural components. The completed systems shall be fully interconnected with the utility service and configured for net metering in accordance with applicable utility requirements. Florida State License Requirements Proposers are required to demonstrate the following Florida State Licenses: Professional Services: Design Engineer(s) of Record responsible for signing and sealing plans shall be Florida State Licensed Professional Engineer(s) Construction: The team shall include a Florida State Licensed Master Electrician, Electrical Contractor, or Certified Solar Contractor responsible for the work. Florida Department of Transportation (FDOT) Prequalification The Contractor and Design Firm may be a single Design-Build Firm or may be separate entities participating as part of the Design-Build Team. Below is a list of FDOT pre-qualifications applicable to the proposed photovoltaic system. While FDOT prequalification is not required, it is strongly encouraged and will be evaluated during technical reviews of the Design-Build Team. Design/Professional Services 1.Type of Work 4.1.1: Miscellaneous Structures 2.Type of Work 9.1: Soil Exploration 3.Type of Work 9.2: Geotechnical Classification Lab Testing 4.Type of Work 9.4: Foundation Studies 5.Type of Work 9.5: Geotechnical Specialty Lab Testing Construction Services 1.Electrical Work 2.Drill Shaft (as needed only if drilled shaft foundations are the selected foundation type) 3.Underground Utilities (Electric) 4.Utility Work Small Business Enterprise (SBE) / Emerging Business Initiative (EBI) Participation Recognizing the significant role CFX plays in creating opportunities for economic growth for the Central Florida region CFX hereby establishes a Small Business Enterprise (SBE) / Emerging Business Initiative (EBI) participation objective of 17% for this procurement to foster local innovation, strengthen community partnerships, and support a vibrant Central Florida economy by encouraging the participation of local and small businesses in CFX’s procurement and contracting activities. Respondents are required to submit a completed Utilization Form and applicable certificate for each of its proposed SBE/EBI subcontractors at the time of submission. Only SBE/EBIs certified by CFX, FDOT, Greater Orlando Aviation Authority(GOAA), Orange County, Florida, or the City of Orlando, Florida, at the time of submission may be counted toward the SBE objectives. A copy of the current certification from one of these agencies shall be attached to the Utilization Form. Submission of a completed CFX SBE affidavit is still required ( https://www.cfxway.com/wp-content/uploads/2026/01/CFX-BOD-SBE-Affidavit-2026-Final.pdf ). Award of the Contract may be conditioned upon submission of the participation information and upon satisfaction of the participation objectives or, if the objectives are not met, upon demonstrating that good faith efforts were made to meet the objectives. If the participation objective is not met, sufficient information shall be submitted to demonstrate that the Respondent made good faith efforts to meet the objective. Good faith efforts documentation shall be included herein and shall indicate the following: Whether the Respondent, at least seven days prior to the proposal submittal date, provided written notice to certified SBE/EBIs performing the type of work that the Respondent intends to subcontract, advising the SBE/EBIs (a) of the specific work the Respondent intends to subcontract; (b) that their interest in the Contract is being solicited; and (c) how to obtain information about and review and inspect the Proposal documents; Whether the Respondent selected economically feasible portions of the work to be performed by the SBE/EBIs, including, where appropriate, breaking down contracts or combining elements of work into economically feasible units. The ability of the Respondent to perform the work with its own work force will not excuse the Respondent’s failure to meet participation objectives; Whether the Respondent provided interested SBE/EBIs assistance in reviewing the solicitation documents; Whether the Respondent submits all quotations received from SBE/EBIs, and for those quotations not accepted, an explanation of why the SBE/EBIs will not be used during the course of the Contract; Whether the Respondent assisted interested SBE/EBIs in obtaining any required bonding, lines of credit, or insurance; Whether the Respondent elected to subcontract types of work that match the capabilities of solicited SBE/EBIs; and Whether the Proposer’s efforts were merely pro forma and given all relevant circumstances, could not reasonably be expected to produce sufficient SBE/EBI participation to meet the objectives. The above list is not intended to be exclusive or exhaustive and CFX will look not only at the different kinds of efforts that the Proposer made but also the quality, quantity and intensity of those efforts. Respondents requiring assistance or information with regard to SBE and/or EBI certification and utilization may contact the CFX Director of Business Opportunities at (407) 690-5000. See the following resources: CFX: https://www.cfxway.com/small-business-resources/ FDOT: https://www.fdot.gov/BusinessGrowth/small-business-program.shtm GOAA: https://flymco.com/airport-business/small-business/ Orange County: https://orangecountyfl.net/VendorServices City of Orlando: https://www.orlando.gov/Our-Government/Departments-Offices/ After final ranking and before award, CFX will review the high-ranking Proposer’s subcontracting commitments and good faith effort documentation (if applicable). If CFX determines that the Proposer has neither met the objective nor demonstrated adequate good faith efforts, CFX may proceed to the next-ranked Proposer. Any subsequent award will be subject to the same review. CFX reserves the right to seek clarification of the submitted information. Nothing herein shall limit the Director of Business Opportunities’ authority to approve, in writing, a Proposer’s request to replace or substitute an SBE listed in its Solicitation Response, whether before or after Contract award, in accordance with Section 10.4.9.5 of the CFX Business Opportunities Policy. Bid/Proposal Bond Each proposal must be accompanied by bid security made payable to the Central Florida Expressway Authority in an amount of five percent (5%) of Respondent’s maximum price and in the form of a certified or bank check or a bid bond on the CFX provided form, issued by a surety meeting all requirements of the laws of Florida. The surety agent’s name, address and telephone number shall be clearly stated on the Bond. Each proposer expressly acknowledges and agrees that its submittal of a proposal constitutes an irrevocable offer to contract with CFX, creating an agreement upon CFX’s acceptance of the proposal as meeting the requirements of the Solicitation Documents. The Successful Respondent’s revocation of the offer to contract on said terms shall result in the Successful Respondent’s forfeiture of the Bid security. CFX will not release and will not be required to release the bid security of the Apparent Successful Respondent unless and until such Respondent has executed the Contract, furnished the required Performance and Payment Bond, and met the other conditions for issuance of a Notice of Award and of the Notice of Award itself, whereupon the bid security will be returned. If the Apparent Successful Respondent fails to execute and deliver the Contract and furnish the required Public Construction Bond within fifteen (15) days after the Notice of Award, CFX may annul the Notice of Award and the bid security of that Respondent will be forfeited. The bid security of other Respondents whom CFX believes to have a reasonable chance of receiving the award may be retained by CFX until the earlier of the seventh (7th) day after the Effective Date of the Contract or the ninetieth (90th) day after the public opening, whereupon bid security furnished by such Respondents will be returned upon written request from the Respondents Bid security with proposals which are not competitive will be returned within seven (7) days after the public opening upon written request of the Respondents. An electronic copy of the bid security must be uploaded with the proposal. If the Respondent submits bid security in the form of a certified or bank check, the original check must be received by CFX at CFX Headquarters, 4974 ORL Tower Road, Orlando, FL 32807 before the Solicitation deadline Monday, December 21, 2026 at 1:30 pm . The electronic copy does not satisfy the requirement to timely deliver the original check. Questions Regarding this Solicitation The question and answer module of OpenGov is being utilized for this solicitation. Timely questions concerning this solicitation shall be submitted in accordance with the Friday, November 20, 2026 1:00 pm deadline for questions. Respondents are instructed not to contact the initiating department directly. Consideration for modification or alteration of the documents contained in this solicitation shall be requested during the specified question period, before the applicable deadline. No oral interpretation of the meaning of the plans, specifications, or other Contract documents shall be considered binding. CFX shall be bound by information and statements only when such statements are written and executed under the authority of the Director of Procurement. Answers for timely questions will be addressed using the OpenGov question and answer feature or as an addenda to this solicitation depending on volume. Participants are encouraged to subscribe as a follower and monitor all notifications. Beyond questions and answers, any and all modifications, clarifications, interpretations and supplemental instructions will be in the form of a written addendum. All addenda and questions/answers so issued shall become part of the Contract Documents and receipt shall be acknowledged as specified herein. This provision exists solely for the convenience and administrative efficiency of CFX. No respondent or other third party gains any rights by virtue of this provision or the application thereof, nor shall any respondent or third party have any standing to sue or cause of action arising there from. Untimely questions are unable to be submitted using the OpenGov question and answer feature, after Friday, November 20, 2026 1:00 pm respondents raising critical concerns must email rolando.melo@cfxway.com . A response is not guaranteed, CFX may review such information to determine whether they raise issues material to the solicitation. Any clarifications deemed necessary will be issued by addendum. Scoring of Proposals by Technical Evaluation Committee If less than three (3) teams submit responses, CFX, at its sole discretion, may elect to continue the selection process or re-advertise the project. Scoring of the submittals will be as follows: The Technical Proposals will be scored by the Committee as follows: CRITERIA POINT VALUE Technical Proposal Cover Letter Letter of Interest (Project Approach and Experience) 20 Points Qualification of Design-Build Team Statement of Qualifications Key Project Team Resumes Organizational Chart 20 Points Price Proposal 60 Points TOTAL SCORE 100 Points Technical Proposals Technical proposals will be rated based on the point values above from Poor to Excellent, individual scores shall be averaged to determine the committee score. The Technical Proposal shall be sufficiently detailed to enable the Committee to ascertain that the consultant understands the requirements and is able to furnish the services required. Responses which are limited to a statement of “will comply” or a similar statement which does not describe how each requirement will be met, will receive no credit. Responses which are merely a copy of the stated requirements are not desired and will receive no credit. Discussion of the consultant’s past experience which is not germane to the specified services for this project should not be included. Price Proposals The lowest responsive and responsible Price Proposal will receive the maximum score of 60 points. All other Price Proposals will receive proportionately lower scores using the following formula: Lowest Price ÷ Proposer’s Price × 60 = Score If two or more Proposers receive the same total score, the Proposer with the lower evaluated price will receive the higher ranking. If the evaluated prices are also tied, the technical scores will be compared in this order: Technical Approach then Qualification of Design-Build Team. The Proposer with the higher score on the first criterion that differs will receive the higher ranking. If the tie remains, the Evaluation Committee will resolve it by majority vote following a motion and second. The motion, second, and vote will be recorded in the meeting minutes. The highest ranked firm and ranked alternates will be presented to the CFX Director of Procurement for approval and authorization to negotiate, in ranked order. Notices Notices related to the solicitation, including addenda, meeting notices, intended decisions, and other procurement communications, will be made available on CFX's e-Procurement Portal. Non-Solicitation Provision From the first date of publication of this notice, no person may contact any CFX Board Member, Officer or Employee with respect to this notice or the services to be provided. Reference is made to the lobbying guidelines of CFX for further information regarding this Non-Solicitation Provision, see https://www.cfxway.com/procurement-resources/ . Conflict in Contractual Obligations If selected, the consultant, during the term of its agreement with CFX, will not be eligible to Source: OpenGov https://procurement.opengov.com/portal/cfxway/projects/316979 Canonical URL: https://govcontractfinder.com/contracts/request-for-proposals-for-design-build-services-for-sr-516-p-opengov-19450405-project-316979