Residential Interior Painting for the Housing Authority of Washington County (HAWC) State and local opportunity open Washington County, Oregon 2026.100-ITB Posted: 2026-10-30T22:33:21.570Z Response deadline: 2026-12-03T22:00:00.000Z The Housing Authority of Washington County (HAWC) is a public entity tasked with providing high quality, safe and affordable housing in Washington County. HAWC manages a diverse portfolio of residential properties that include single-family homes and multi-family apartment communities distributed throughout Washington County, Oregon. Scheduled Interior Painting Includes prep work, paint, spackling and minor drywall repairs. Additional charges for significant drywall repairs will require prior approval. 1 Bed 1 Bath (650 - 750 sq ft) 2 Bed 1 Bath (750 - 850 sq ft) 2 Bed 2Bath (850 - 960 sq ft) 3 Bed 1 Bath (850 - 1000 sq ft) 3 Bed 2 Bath (950 - 1200 sq ft) On-Call Services Truck Charge/Staging - Cost for travel, staging, and other one time charges that would apply to an on-call service. Does not include labor or materials to perform the work, those charges are provided for below. On Call Painting (Includes spackling, texture, and paint) On-Call Sheetrock Repair (Includes patching, texture and paint) Doors Painting (Interior and Exterior) Includes Trim Cabinets Baseboard Trim Tub and Shower Surround Scope of Work General Information Type of contract: Firm Fixed The Contractor shall provide all services at a cost inclusive of: Direct labor hours at specified fixed hourly rates. Equipment, consumable materials, and supplies Overhead and supervision There is no guarantee on the quantity of work that the contractor will be required to do. Work will be performed on an as needed basis as the demands of the housing authority dictate. The Contractor shall complete an affidavit of proof that they did not enter into any collusion with any person in respect to this contract. Contractor must read, understand and be able to meet the requirements set forth in Attachment B - HUD_Forms_Maintenance_2026 The work performed under this contract is on a project assisted under a program receiving direct Federal financial assistance from the Department of Housing and Urban Development (HUD) and is subject to the requirements of Section 3 of the Housing and Urban Development Act of 1968. The Act requires that, to the greatest extent possible, opportunities for training and employment will be given to residents of the area of the Section 3 covered project. S afety Measures The contractor shall ensure that residents have continuous access to their units during the project. The contractor shall provide clear signage, fencing, or other barriers to direct residents to the nearest available access point to their units. In the event that access to a unit is temporarily blocked, the contractor shall provide a temporary alternative access point and shall restore access to the original access point as soon as possible. The contractor shall take all necessary steps to minimize disruptions and inconvenience to residents during the project. All HAWC properties are strictly no smoking; this includes all interior and common areas, parking areas and yards. Contractor shall ensure that all employees are aware of the no- smoking policy and shall enforce this provision. Violating personnel may be excluded from the property and this contract by the HAWC contract administrator. Failure to comply with this provision may result in contract termination. The Contractor shall clean the work site each day and upon completion of the project and verify that all debris is removed from the premises. A magnetic sweep will be performed twice daily around the perimeter of the project and along all pedestrian walkways to ensure removal of nails, screws, or any small metal foreign matter. The work site shall be left in a condition comparable with that at the beginning of the project. In accordance with all applicable laws and generally accepted practices, the Contractor will be solely and completely responsible for conditions of the job site, including the safety of all persons and property during the performance of the work. The Contractor shall always prioritize the safety of employees on the work site by taking all necessary precautions. This includes erecting and consistently maintaining all required safeguards to protect both workers and the public, adapting as needed to job conditions and the progress of work. The Contractor shall also clearly post danger signs to warn against any hazards created by ongoing operations and work in progress. If the Contractor fails to correct work that is not in accordance with safety requirements or recognized industry standards, HAWC may order the Contractor to stop all work, or any portion of work. However, the right of the HAWC to stop work shall not give rise to a duty on the part of HAWC to exercise this right for the benefit of the Contractor or any other person or entity. PPE: Safety gear is required of all staff on-site at all times. During the performance of the resulting contract, the Contractor is required to comply with the conditions of the federal Occupational Safety and Health Act of 1970 (OSHA) and the standards and regulations issued thereunder. It shall be the sole responsibility of the Contractor to remain familiar with said standards and regulations and maintain their enforcement. Requirements include, but are not limited to, proper footwear, hard hats, safety eyewear, hearing protection, gloves, vests, etc. Ordering and Schedule Services will be coordinated between the Contractor and HAWC by work order. Work orders will be emailed to the Contractor and will include: The service(s) requested Paint pattern (Section 18 or Public Housing) Jobsite address. Contact information for approved HAWC representative Contact information for scheduling work Any relevant information necessary to complete the work requested. Contractor may be responsible for contacting tenants for scheduling work at occupied units. The Contractor shall communicate with HAWC all site visits to verify site conditions and clarify the specific scope of work. The Contractor may be required to submit a detailed estimate of labor hours to perform the prescribed work. The estimate must be presented in a timely manner to facilitate prompt review and approval. The Contractor, in collaboration with HAWC, shall provide written communication for access and to notify of any necessary preparations to tenants of occupied units prior to work. The Contractor will complete all requested work within 30 calendar days of approval unless other arrangements are made in writing. Work hours will be confined between 8:00 am to 7:00 pm, Monday through Sunday. Additional materials markup, for materials not defined in section 3.1, not to exceed 15% markup. Scope of Work Services under this contract will include the tasks listed under this scope of work. Drywall The Contractor shall provide drywall repairs and improvements on residential properties. Repairs will typically consist of patching damaged gypsum wallboard ceilings and/or walls to match existing texture, paint sheen and color. Contractor shall provide all labor, materials, equipment, and supervision to perform the necessary work. The Contractor agrees to do all work in accordance with the plans, specifications, and performance standards and in accordance with good building practice, any and all municipal codes, and to the satisfaction of HAWC. All drywall must be mold-resistant. All drywall installed at the interior of the house shall be 1/2” or 5/8” per local code requirement s. All drywall shall be nailed and screwed with a full nailing pattern and finished in accordance with the manufacturer’s recommendations. This shall apply to both ceiling and wall installation. Maximum nail spacing at ends (edges in vertical application) within the nailing field shall be screwed or nailed with one (1) nail space 6 inches on center at each support. Minimum nail edge distance shall be 3/8”. This shall apply to both ceiling and wall installation. Drywall shims shall be used only where necessary. Openings cut for outlets, switches, etc., shall be of a tolerance that can be covered adequately with normal switch plates and covers without additional taping or caulking. Drywall shall not be installed without proper backing. All nailing should comply with all county, state, city and manufacturer’s specifications. All exterior corners on drywall shall be covered with non-corrosive metal corner bead and covered with an acceptable installation of joint compound. All corner beads shall be fastened per manufacturer specifications (Max 8” spacing). All interior corners greater than 90 degrees will have flex bead installed. Drywall and metal corner beads shall extend to the concrete and plywood subfloor of all drywalled door openings that receive bi-fold or bypass doors. All other drywall shall extend from the ceiling to within 1/2” of the floor. Drywall shall finish tight to window frames. Ceiling board shall be installed prior to wall board. Joint compound and tape should conform to ASTM Treatment Materials for Gypsum Wallboard. Drywall shall be hung with long dimensions of the board at right angles to the framing. Corner beads shall be used on all corners. The appropriate beads shall be used on all vault and tray ceilings. All metal to be level and plumb. Out-of-alignment vault or tray lines are unacceptable and must be repaired at the Contractor’s expense. All nails in or damage to plumbing pipes or electrical wiring are the responsibility of Contractor. A minimum of three coats of joint compound are required: an embedding coat to bond the tape and two finishing coats over the tape. Each coat must be thoroughly dry before the next is applied to ensure that the surface incurs maximum shrinkage and can be readily sanded. The finished drywall should present a smooth, unblemished, homogeneous appearance with inconspicuous joining between boards and no visible fasteners. There should be no areas of raised fibers due to over-sanding. Clearly visible nail pops, seam lines and cracks are considered unacceptable. No scaffold or ladders to be set in any tub. Contractor shall use extreme caution while working around bathtubs and shower pans and will be held liable for any damage incurred. Contractor shall replace insulation fallen prior to drywall, and notify HAWC agent of lack of any insulation, prior to drywall installation. Contractor shall be responsible for walls covered without insulation and/or insulation inspection. Ceilings will be finished with knockdown texture. Ceiling coverage shall be uniform with no thin or missed spots and must be uniform from wall to wall and room to room. There should be no areas of raised fibers due to over-sanding. Wallboard Patching: Side-to-side punctures in drywall and any damage over half an inch will be patched using professional joint compound. For holes over (1) one inch in diameter: Holes must be repaired by cutting out the damaged area and placing a new piece of drywall that matches existing drywall thickness. Backer board must be installed for proper fastening. Backer must be 4 inches larger than the height of the hole. Drywall screws must be positioned at least an inch from the edges to avoid splitting or crumbling the drywall. Screws must sink slightly below the surface of the drywall. Drywall tape must run around the edges of the patch centering the tape on the seams. Three coats of joint compound are required: an embedding coat to bond the tape and two finishing coats over the tape. Each coat must be thoroughly dry before the next is applied to ensure that the surface incurs maximum shrinkage and can be readily sanded. Contractor will match surrounding texture to a professional standard. Contractor will paint patched area. Please see product specifications provided in this document for paint. The finished drywall should present a smooth, unblemished, homogeneous appearance with inconspicuous joints between boards and no visible fasteners. There should be no areas of raised fibers due to over-sanding. Clearly visible nail pops, seam lines and cracks are considered unacceptable. Contractor shall not use adhesive mesh patches or “California” style patches with no backing. Contractor shall clean up, remove, and dispose of all debris associated with this work. The jobsite shall be broom-swept every day at the end of the shift and before job is considered complete. Permits: If the work being performed requires a permit, the Contractor will apply for and obtain the appropriate permits and coordinate jurisdictional inspections. Painting Contractor will provide as-needed residential interior painting. Painting services will in Paint Specifications Paint Specifications Section 18 Units PH Units Sherwin-Williams or equal Walls: Dumpling SW 9616 Ceiling and Trim: Off White Sheen: Eggshell Rodda or equal Walls and Ceilings: Winter Wheat Sheen: Eggshell Cabinets Doors, Doors Casings and Baseboard Trim White Off White Tub and Shower Surround Two-Component Acrylic Urethane in White Wage Determinations Wage Determination: HUD-determined The contractor is required to pay wages as determined or adopted by HUD for all workers employed under contracts in excess of $2,000 (wage rates are detailed on form HUD-52158). It is the Contractor’s responsibility to review the wage rates and request additional classifications or updated rate sheets from HAWC as needed. The contractor is not required to submit payroll reports. Contractors and subcontractors are required to maintain payroll records and must make such records available to HAWC upon request. The Contractor and subcontractors are responsible, on no less than a semimonthly basis, for paying not less than the applicable wage rates to all maintenance laborers and mechanics in their employ and engaged in work under this contract. The contractor is responsible for its own full compliance, and for the full compliance of any/all subcontractors, with all wage, overtime and record keeping requirements included in this contract. HUD has determined that a Record of Employee Interview (Wage Interview) must be completed by a “representative sample” of workers for each contract. HAWC staff will interview your employees while on our job site and ask them questions regarding their names, job duties, and pay. It is a federal requirement that these interviews be completed and documented on form HUD-11. All wage rules and requirements must be cascaded down to all subcontractors through contractually binding agreements. Misclassification of Employees as Independent Contractors: Per the United States Department of Labor Requirements, as detailed in Administrator’s Interpretation No. 2015-1, when using Federal Funds, it is necessary to assure all employees are classified correctly and paid accordingly. To ensure correct classifications, wages and tax revenues are paid and reported any documentation submitted to HAWC indicating or suspected to indicate an Independent Contractor or Contractor using an IRS1099 Form shall be further investigated by HAWC. It shall be the burden of the Contractor to provide any documentation requested by HAWC. For more information on the Misclassification of Employees as Independent Contractors please visit: www.dol.gov/whd/workers/misclassification/ Quality Assurance Upon job completion, HAWC will inspect to verify work was completed and meets the agreed standards as outlined in this contract. If the property does not meet the standards as agreed upon in this contract, HAWC will contact the contractor to return to rectify any deficiencies. If the contractor is unable to return within 72 hours, HAWC may correct the deficiencies and deduct accrued expenses from payments. All work and materials shall be subject to a final inspection and approval by HAWC. If any defective work or material is found during inspection, the Contractor shall repair or replace at no additional charge. The Contractor warrants all furnished materials and equipment will be of good quality and new unless otherwise required and approved. Work will be free from defects and will conform with the requirements of the contract documents, safety requirements, and safety standards. Work not conforming to these requirements, including substitutions not properly approved or authorized may be deemed defective. If any work is subject to be tested or approved by local jurisdiction, contract documents, or by regulation; the Contractor shall provide HAWC timely notice of its readiness for inspection. If any such work is covered without approval or consent it must, if required by the Contract Administrator or other authorities, be uncovered for examination at Contractor’s expense. Payment Terms Any price adjustments, whether increases or decreases, must be communicated and approved by the contract administrator. For increases, evidence of manufacturer price shifts or labor upsurges may be requested. All invoices must contain the following information: Work order number for the requested services Service Address Date(s) of service Description of services and materials provided. The Contractor shall email all invoices and supporting documentation no later than 15 days after the work is completed to: Housing_Accounting@washingtoncountyor.gov Payment will be issued within 30 days of approval by the Contract Administrator. The County may, at its discretion, withhold payment of the final invoice until all close-out requirements have been met in accordance with work specifications. Bid Table Instructions and Awarding Pricing Requirements Bidders must provide a unit price for each of the line items identified in the Bid Table. Failure to provide pricing for all line items will result in the bid being deemed non-responsive. Evaluation Method For evaluation purposes, the County will calculate an Average Cost for each bidder. The Average Cost will be determined by summing the total cost submitted for all line items and dividing the total number of lines. Contractors will enter the unit cost, which will calculate the total cost by multiplying the unit cost to the quantity. All total costs are added together, regardless of unit of measure, and divided by the number of lines. An example has been provided in NOTICES. An example of the calculation is as follows: Average Total Cost = (Line Item 1 Total Cost + Line Item 2 Total Cost + Line Item 3 Total Cost + Line Item 4 Total Cost + Line Item 5 Total Cost) ÷ 5 Bids will be ranked based on the calculated Average Total Cost, with the lowest Average Cost receiving the highest ranking, subject to a determination that the bidder is responsive and responsible. Introduction Summary Background Contact Information Timeline Legal Advertisement WASHINGTON COUNTY, OREGON INVITATION TO BID No. 2026.100-ITB Residential Interior Painting for the Housing Authority of Washington County (HAWC) The Invitation to Bid (“ITB”) documents will be available at www.WashCoPurch.com/biz Bidders are responsible for checking the site for any addenda to the ITB documents before submitting their bids to the site. Bid are due no later than 2:00 pm on Thursday, December 3, 2026 late bids are unable to be entered. The estimated expense for this contract will be $250,000 Bids must contain a statement as to whether the bidder is a resident bidder, as defined in ORS 279A.120(1)(b). Confirmation that bidder will comply with the statement in the bid document regarding compliance with the requirement to pay wages as determined or adopted by HUD for all workers employed under contracts in excess of $2,000 (wage rates are detailed on form HUD-52158). The County may reject any bid not in compliance with all prescribed public bidding procedures and requirements, and may reject for good cause any or all bids upon a finding of the County it is in the public interest to do so. Washington County reserves the right to reject any and all bids and to waive any and all informalities in the best interest of the County. Bid Source: OpenGov https://procurement.opengov.com/portal/washington-county-or/projects/320566 Canonical URL: https://govcontractfinder.com/contracts/residential-interior-painting-for-the-housing-authority-of-w-opengov-503-project-320566