RFQ-P027-32 New Pulaski School Construction Manager at Risk State and local opportunity evaluation City of Meriden RFQ-P027-32 Posted: 2026-10-22T11:00:01.677Z Response deadline: 2026-11-19T16:00:00.000Z The City of Meriden is seeking a Construction Manager at Risk in overseeing the construction of the New Casimir Pulaski School, at the site of the former Meriden Wallingford Hospital at 1 King Place, Meriden. The project anticipates an early abatement and demolition phase with bidding to occur while the new construction phase construction documents are being finalized. The Construction Manager shall provide services including but not limited to, constructability /document completeness reviews, estimating at various levels of design, solicitation, award, EEO/MWBE participation, permitting, construction, commissioning assistance, occupancy, closeout, post occupancy, warranty phases, and coordination with all Owner vendors, contractors and consultants as necessary, to complete the construction. SCOPE OF SERVICES PROJECT INFORMATION/EXPECTATIONS Project Details The Project will take place at the site of the former Meriden Wallingford Hospital at 1 King Place, Meriden. The project anticipates an early abatement and demolition phase with bidding to occur while the new construction phase construction documents are being finalized. Full student occupancy of the new facility is required for the start of the 2030 calendar year. Construction of this project is expected to be performed under a Project Labor Agreement. No draft of such an agreement is currently available for review. The RFQ/P package consists of the following documents: - Request for Qualifications and Proposals (This document) - Modified AIA Document A133-2019 Standard Form of Agreement Between Owner and Construction Manager where the Construction Manager is also the Constructor. - Modified AIA A201-2017 General Conditions of the Contract for Construction - Educational Specifications - General Conditions and Direct Work Clarification - Staff Matrix Sample - General Conditions Matrix Sample Project Schedule The Project is currently in the startup phase, with the Architect/Engineer (AE) selection process underway. Arcadis has been retained as the Owner’s Project Manager (PM or OPM). The pre-construction effort will begin shortly upon hiring with review of the Programming/Schematic Development phase documents and the development soon thereafter of the Schematic Design estimate and will run through construction documentation and the bidding effort. Traditional construction management services will proceed from construction start to project closeout. The schedule of this project will be aggressive, involving up front systems coordination and construction phase scheduling. As the site is currently encumbered by a former hospital, the initial construction effort will consist of abatement and demolition, anticipated to begin in early 2027. The Project is currently proposed to be broken out into the following phases: Phase 1 – Abatement and Demolition Phase 2 – New construction (including playscapes) Phase 3 – FF&E Phase 4 - Technology Project Schedule – The following milestone dates are to be utilized in preparing your proposal: Letter of Intent to Award December 18, 2026 Design Period (Phase 1) Through January 31, 2027 PCR Review (Phase 1) February 1 – March 15, 2027 Bidding (Phase 1) March 15 – April 30, 2027 Start of Construction (Phase 1) May 1 – December 31, 2027 Design Phase Completion (Phase 2) February 28, 2028 PCR Review (Phase 2) February 1 – March 15, 2028 Bidding (Phase 2) March 15 – April 30, 2028 Start of Construction (Phase 2) May 1, 2028 Substantial Completion October 31, 2029 FF&E/Technology/Punch List November 1 – December 31, 2029 Project Closeout As required, 6 months anticipated NOTE: Design time includes phased estimates and reconciliation efforts between the A/E and CM after each estimate is developed Project Budget The overall construction cost (Target GMP) for the Project is $101 million. The GMP shall include CM fee, General Conditions/Reimbursables, Preconstruction fee, Trade costs, Contingencies, GMP allowances, etc. Project Management Communications All project participants, including Architect, Engineer and Consultants, Construction Manager and their sub-contractors and Owner/OPM staff (as required) shall use the Construction Management firm’s standard web-based project management communications tool, licenses and fees for which shall be the responsibility of the Construction Manager as a General Conditions expense. The use of project management communications as herein described does not replace or change any contractual responsibilities of the participants. The project communications database shall be on-line and fully functional. Login credentials will be assigned by the Construction Manager. Electronic and computer equipment and Internet connections are the responsibility of each project participant. The sharing of user accounts is prohibited. Electronic project communications shall be used for all information, including but not limited to the items listed on the Construction Management Communications document portion of this Request for Proposals. Expectations of the Construction Management Firm The Construction Manager shall provide services including but not limited to, constructability /document completeness reviews, estimating at various levels of design, solicitation, award, EEO/MWBE participation, permitting, construction, commissioning assistance, occupancy, closeout, post occupancy, warranty phases, and coordination with all Owner vendors, contractors and consultants as necessary, to complete the construction. (i.e. specialty consultants, FF&E, etc.) The selected construction management firm shall provide a Guaranteed Delivery Date (GDD) and a Guaranteed Maximum Price (GMP) in accordance with the intent of this solicitation and the terms and conditions of the executed agreement. The selected Construction Management firm shall provide a payment and performance bond letter from the surety in the amount of 100% of the GMP. The individual trade contracts shall be between the Construction Manager and the trade contractor, The Construction Manager is "at risk" as it relates to the delivery of this project. Firms must be pre-qualified to meet the Department of Administrative Services guidelines for school construction projects with contracts in excess of $500,000 in the category of CM at Risk Group B. The Construction Manager shall adhere to all local, state and federal regulations and guidelines and operate under the Connecticut Department of Administrative Services and/or Department of Education guidelines as they apply to this specific project. Pre-Construction Phase Services as described in the CM Agreement and in this RFP including: Perform “constructability” reviews of the construction documents and provide a detailed report. Perform drawings and specifications review for completeness and clarity and provide a detailed report. Perform detailed analysis of phasing documents as may be required and collaboratively work with Architect to develop complete and most effective plan, provide recommendations as required. Create proposed site logistics plans. Develop requirements for safety, quality assurance and schedule adherence (phasing, relocation, temporary structures, hazardous materials abatement, etc.) Provide Value Management/Engineering services as required. Develop a detailed construction phase schedule (addressing all aspects and phases), by a qualified scheduler, using Primavera P6, P3, P3e or other Owner approved scheduling software (schedules shall use the Critical Path Method, the scheduler’s resume will be included and reviewed for proper credentials, an electronic copy shall be provided to the OPM for review of content and logic. Update schedule with additional information as required by the OPM. Schedule should include all activities previous to construction (i.e. bid package preparation, bidding, scope reviews, awards, etc.) Engage in budget reconciliation and control sessions as required. Attend all design review, standards development, Community Relations and other special meetings throughout the design process, as required. Provide continuous document review to ensure documents are clear and concise. Review shall include in depth constructability reviews early on and throughout the design process. Develop bid packages in a thorough and detailed fashion to minimize change orders due to unclear or missed scope. All estimating efforts throughout the design period will be due (2) two weeks after receiving drawings from the design team for the relevant phase. After estimate is complete, the same will be reconciled expeditiously with the design teams’ independent estimate. In the event that the design exceeds the prescribed construction budget, both the Construction Manager and AE will collaboratively work to value manage/engineer the project expeditiously in order to maintain project schedule. Perform a detailed review and costing at Schematic design, design development, and 100% construction documents, updating estimates based on the current documents. Provide a bid estimate broken out by proposed bid packages that updates the Construction Document estimate with any revisions. Provide OPM and AE with (both hard and electronic) copies of all estimates, including worksheets, proposals, and logic throughout design and pre-bid process. Per current and evolving requirements of the Office of Grants Administration (OGA), in addition to the above noted estimates for use in reconciling the construction budget with the AE’s estimates, the Construction Manager shall also prepare and provide reconciled estimates in UNIFORMAT for submission to the state database. The Construction Manager shall plan on delivering four such estimates at the conclusion of the Schematic Design, Design Development, 100 percent Construction Document (pre-bid) and Post-Construction (actual costs with change orders) phases. Solicitation and Award Phase Services Arrange solicitation packages (Bid Packages) and adhere to the Meriden School Building Committee, Connecticut Department of Administrative Services (DAS) and OGA requirements as applicable. Firms must be pre-qualified to meet the DAS guidelines for school construction projects with contracts in excess of $1,000,000. Provide a final pre-bid estimate in an appropriate format reflecting the bid package breakdown. Develop requirements to assure time, cost and quality control during construction. Prepare a schedule for the bidding and awarding of all sub-contractor packages. Contact (i.e. phone, mail, e-mail, etc.) as many qualified contractors as possible to promote bid competitiveness. Monitor bidder activity to maximize bidder participation. Update provisional construction (CPM) schedule, maintaining applicable completion dates, for issuance with bid packages. As required, mark the master schedule with milestones for long-lead items, etc. (provide OPM with an electronic copy for review of content and logic, update schedule with additional information as required). Review project labor requirements and availability, RESPONSE GUIDELINES The organization of the Statement of Qualifications shall follow the outline below. All information must be clear, concise and to the point. Introductory Letter - Indicate your firm's commitment to the project and how your firm will meet or exceed all expectations. Specifically provide a commitment to maintaining consistent leadership throughout the design and construction of the project to keep this project on budget and schedule. This letter shall not exceed two (2) pages in length. Project Team / Organization / Experience - Indicate how your firm will staff this project. Provide resumes for each member of the team. Indicate what each team member's role and responsibility will be for this project. Demonstrate each team member's experience with public school construction, with emphasis on projects in Connecticut. Indicate each member's time commitment to this project. It is the Owner’s expectation that the proposed project team will be assigned to the project for the entire duration of the project. By responding to this Request for Qualifications and Proposals, each firm commits to maintain the availability of the staff members it proposes for a period of 60 days beyond the decision date included within this document, should there be delays in the selection of the Construction Manager or in issuing authorization to proceed. To the extent that proposed staff remain employed by the responding firm, no substitutions will be permitted without permission of the Owner. A listing of project personnel will be incorporated as an exhibit to the contract. Specifically supply project references for the current and previous two projects for the proposed Project Manager and Superintendent. Joint Venture (if applicable) - Indicate whether a joint venture/partnership will be proposed. Clearly indicate if CM services will be provided solely by the firm responding or if there is a joint venture/partnership in providing the CM services. If a joint venture/partnership, explain how workload will be distributed and if firms have had experience working together. If no experience working on projects together, state this clearly. List the projects that have been completed together. For each project list the project name, size, cost, delivery method used and a brief description of the work. Firm History - Firms must have a minimum of ten (10) years in operation in the Connecticut construction market as Construction Managers-at-Risk. Submit a brief history of the firm and explain the firm's ownership. If a joint venture or partnership for CM services is proposed, a brief history of both firms is required. If the years in operation under their current name is less than 10 years for a responding firm or senior/governing member of a joint venture or partnership, or 5 years for a junior member, provide clear information on the reason for such a name change. Required Experience - For the projects meeting the criteria below, provide the original contract / GMP and final construction contract values. Provide an explanation of the items which caused the variance between these figures. Experience as a Construction Manager at-risk with no less than two (2) such projects completed within the past five (5) years, at least one project of $50 million or more in construction value (Any project type). A minimum of one completed Connecticut public school project of no less than $40 million in construction value performed in accordance with CGS Chapter 173. A minimum of one Connecticut public school project which has successfully passed the state audit in accordance with CGS Chapter 173. List all public-school projects (in and outside of Connecticut) that have been completed by your firm in the last eight (8) years. For each project, list the project name, size, construction cost, delivery method used and a brief description of the work. Provide the contact/reference information of the specific individuals from the Owner and the Architect that worked with your team on each referenced project. Site Conditions / Logistics – Once hired, it is expected that the Construction Manager will conduct a complete existing condition analysis of the site to ensure the coordination of the design documents with their logistics approach. In this section, the Construction Manager is to explain their logistics strategy including site access, material handling, staging, stock piling, construction staff parking, etc. Schedule Control - In this section demonstrate your project approach to scheduling the tasks necessary to deliver the project based on the construction schedule presented in this RFQ/P. Demonstrate how the leadership provided by your firm will ensure that deadlines will be met. Respondents shall provide the detail schedule based on the durations mentioned in this RFQ/P. Budget Control - In this section demonstrate how your firm will successfully manage the construction phases of this project to ensure the project is completed within the construction budget indicated in this RFQ/P. Explain the quality control of document review during the construction document phase that your firm will implement to ensure that the documents are 100% complete prior to bid. Explain the responsibility your firm will take in bidding out 100% of the scope in the effort to minimize change orders. Project Reporting - The construction manager will be required to provide for the project team project management software. Demonstrate your firm’s experience in producing comprehensive reports (i.e. RFI log, Submittal log, Budgets, etc.) using such software platforms. Commissioning - The construction manager will be responsible to coordinate the enhanced commissioning program with multiple parties involved. Elaborate on your approach to managing a successful commissioning program. Sustainability Certification - The project will conform with the State of Connecticut’s High Performance Buildings Standard (HPBS). The successful respondent will need REMUNERATION There are three areas of remuneration that will make up the Construction Manager’s management fee. In this section you are asked to respond to the three basic areas of the remuneration: Pre-construction Fee, Construction Management Fee and Reimbursable Costs. Pre-construction Fee: This amount should be based on the labor and reimbursable expenses required to perform the functions as defined in the modified AIA document A133 - 2019 and this document. Pre-construction will end when the GMP is established. The GMP will be established when all the trade contracts have been bid. The project may be bid in phases as described elsewhere in this document. The total pre-construction fee, including reimbursable expenses, shall be provided as a lump sum amount to be billed on a percent completed basis. Construction Management Fee: The construction management fee shall be expressed as a percentage of the construction costs. This fee will cover your profit and all expenses, including home office support staff, not clearly identified as reimbursable costs. Reimbursable Costs: All reimbursable costs that are not part of the construction cost or construction management fee (i.e. general conditions and field staff costs) for the construction period. Provide hourly rates for staff and monthly costs for materials and equipment (trailers, supplies, etc.). Once a construction phasing plan is established, a staffing plan and requirements will be determined. A list identifying and clarifying what the Owner considers reimbursable costs has been included for your reference. No deviations from this list shall be accepted . No arbitrary or pro-rated corporate or home office expense will be considered reimbursable. A General Conditions reimbursable expense matrix (sample attached) shall be included that will list all reimbursable costs and the anticipated expenditure per month for the duration of the project. Your firm’s information must be completed using the form provided and must match as precisely as possible the line items listed. The Owner will provide an electronic copy for your use. A staff chart (sample attached) shall be included that will provide the staff costs for the duration of the project. All staff titles anticipated to bill the project shall be listed and their monthly time commitment indicated. Your firm’s information must be completed using the form provided and must match as precisely as possible the line items listed. The Owner will forward an electronic copy for your use. Their fully burdened billing rate shall be provided. The Owner will not reimburse any cost for staffing over 40 hours per week. The staff cost will be converted to a lump sum amount at the time the GMP is established. Clearly identify all off-site staff that will be working on this project and Source: OpenGov https://procurement.opengov.com/portal/meridenct/projects/317191 Canonical URL: https://govcontractfinder.com/contracts/rfq-p027-32-new-pulaski-school-construction-manager-at-risk-opengov-13652202-project-317191