RFQ-RFP INFLOW AND INFILTRATION ENGINEERING SERVICES FOR WATER & SEWER State and local opportunity open Town of Manchester 26/27-19 Posted: 2026-11-16T13:00:01.836Z Response deadline: 2026-12-11T16:00:00.000Z The Town of Manchester (hereinafter referred to as “Town”) seeks to hire an engineering firm for the purposes of performing Inflow and Infiltration and Sanitary Sewer Evaluation Survey(s), services which may include planning, surveying, design, information technology, construction contract administration and general technical support for the Town of Manchester sanitary sewer system (“Scope of Services”). PROJECT DETAILS Scope of work The selected firm will provide professional engineering services related to Inflow and Infiltration (I&I) investigation and Sanitary Sewer Evaluation Survey (SSES) work for the Town’s sanitary sewer collection system. Services are anticipated to include, but may not be limited to, the following: Review of existing system data, mapping, flow records, and prior studies Flow monitoring and rainfall data analysis to quantify wet-weather response and identify areas of excessive I&I Field investigations such as manhole inspections, smoke testing, dye testing, and/or closed-circuit television (CCTV) inspection, as appropriate Identification and prioritization of I&I sources (public and private) Development of recommended rehabilitation or corrective measures Preparation of technical reports, GIS updates, and supporting documentation Assistance with planning, design, surveying, information technology support, and construction contract administration for subsequent rehabilitation work, as needed General technical support to the Water and Sewer Department related to the sanitary sewer system The final scope of services will be refined with the selected firm based on the Town’s needs and the firm’s recommended approach. Firms are encouraged to describe their recommended methodology, sequencing, and any additional services they believe would benefit the Town. Interviews may take place in December 2026. Selection Engineering consultants shall be selected using the Qualifications Based Selection (QBS) process. Any contract awarded under this Request for Qualifications (RFQ) is expected to be funded in part by Connecticut DEEP. This procurement will be subject to requirements contained in Section 22a482-4(h), (i), and (o) of the regulations of Connecticut State Agencies. The State of Connecticut is not a party to this RFQ and will not be a party to any resulting contract. Any contract awarded under this RFQ is also subject to the availability of Town funding. Qualified firms shall ensure that all appropriate licenses and certifications required by the State of Connecticut are in place and shall meet all municipal, state and federal affirmative action and equal employment opportunity practices. INTRODUCTION Summary Background Contact Information Timeline INSTRUCTIONS TO BIDDERS ELECTRONIC BIDDING INFORMATION Submitting Proposals Specifications and proposal forms must be obtained online at Town of Manchester Procurement Portal (opengov.com) . The exclusive means by which all prospective bidders may obtain proposal packages, direct inquiries, request and receive addenda and supplemental information, and submit bids and proposals, shall be through the Town of Manchester’s OpenGov portal. Proposals may be received up to the deadline date and time listed in the solicitation documents, via the Town’s e-Procurement Portal. The Town e-Procurement Portal Clock is the official clock for the determination of all deadline dates and times. Without exception, responses will not be accepted after the submission deadline regardless of any technical difficulties such as poor internet connections. The Town of Manchester strongly recommends completing your response well ahead of the deadline. Addenda Notification and Acknowledgement Addenda Notification: Bidders are required to register for an account via the Town’s e-Procurement Portal hosted by OpenGov. Once the bidder has completed registration, you will receive addenda notifications to your email by clicking “Follow” on this project. Ultimately, it is the sole responsibility of each bidder to periodically check the site for any addenda at Town of Manchester Procurement Portal (opengov.com) Submitting Questions and Receiving Responses Proposers shall submit all inquiries regarding this RFP via the Town’s e-Procurement Portal. Please note any deadline for submitting inquiries. All answers to inquiries will be posted on the Town’s e-Procurement Portal. Bidders may also click “Follow” on this RFP to receive an email notification when answers are posted. It is the responsibility of the bidder to check the website for answers to inquiries. When applicable, state bids will be considered for this service. The Purchasing Authority reserves the right to waive any informality or reject any and all bids. In addition to the bid specifications, all bids are subject to the terms, provisions and conditions of the Manchester Charter, Code of Ordinances, and Purchasing Guidelines. By bidding on the proposed purchase, the bidder agrees to such terms, provisions and conditions. An Equal Opportunity/Affirmative Action Employer BID OPENING INFORMATION Proposals must be received by the date and time indicated in the bid documents. RULES AND REGULATIONS FOR COMPETITIVE BIDDING These rules and regulations have been adopted by the Board of Directors of the Town of Manchester pursuant to Section 5-22 of the Town Charter. They are standard for all competitive bidding proposals issued by the Town of Manchester, Connecticut for contracts of all types where labor, materials, and necessary equipment to complete work is to be furnished to the Town, where the Town is to purchase supplies, materials, and equipment, where the Town is to sell surplus materials and equipment, or where the Town is to sell real estate. These rules and regulations shall be binding upon all prospective bidders and the Town of Manchester. GENERAL RULES 1. The Purchasing Authority may delete or modify any of the instructions to bidders for a particular proposal, indicating such change in the appropriate section of the proposal documents. The Purchasing Authority may insert special instructions in any special contracts which are subject to competitive bidding. 2. The proposal is signed by the proposer with full knowledge of, and agreement with, the general specifications, conditions, and requirements of this proposal. 3. The town has transitioned to electronic bidding. Vendors should submit solicitation responses electronically via the Town of Manchester Procurement Portal. Vendors will be asked to register and should do so prior to submitting proposal documents. 4.This proposal and any addenda will be issued on the Town of Manchester website bidding portal. It shall be the responsibility of the proposer to download this information. THE TOWN OF MANCHESTER WILL NOT MAIL A SEPARATE HARD COPY OF ADDENDUM TO PROPOSERS . Failure of any proposer to receive any such addendum or interpretation shall not relieve such proposer from any obligation under his RFP as submitted. All addenda so issued shall become part of the Contract Documents. 5. Proposal may not be withdrawn by bidder for 90 days after bid opening. 6. Proposals received later than the time and date specified will not be considered. Amendments to, or withdrawals of proposals received later than the time and date set for submission deadline will not be considered. 7. All deliveries of commodities or services hereunder shall comply in every respect with all applicable laws of the Federal Government and/or the State of Connecticut. 8. Purchases made by the Town of Manchester are exempt from payment of Federal Excise Taxes and the Connecticut Sales Tax and such taxes must not be included in bid prices. Federal Excise Tax exemption certificates, if requested, will be furnished. 9. Deleted 10. Deleted 11. All inquiries shall be submitted within the time limitations specified in the bid documents and shall be requested via the online portal Q&A. All information given by the Town other than through the OpenGov Portal shall be informal and shall not be binding upon the Town nor shall it furnish a basis for legal action by any proposer or prospective proposer against the Town. 11A. The Town reserves the right to reject any and all proposals, to waive technical defects, and to make such awards including accepting a proposal, although not the lowest cost, as it deems in its sole discretion to be in the best interest of the Town. The Town reserves the right to reject any proposal if the proposer, any officer of the proposer, or any other company owned in whole or in part by any officer(s) of the proposer, is delinquent in the payment of any taxes or fees owed to the Town. The Town reserves the right to require a disclosure statement from the proposer listing the name(s) of all officers of the company. 11B. In the event the Town determines that a contractor is delinquent in any payment due the Town, then the Town may offset the delinquent amount due to the Town against the sums owed the contractor. 12. The Town of Manchester may make such investigation as deemed necessary to determine the ability of the proposer to discharge a contract. The proposer shall furnish the Town with all such information and data as may be required for that purpose. The Town reserves the right to reject any proposal if the proposer fails to satisfactorily convince the Town that he is properly qualified by experience and facilities to carry out the obligations of the contract and to satisfactorily complete the work called for herein, or if the proposal is conditional in nature. 13. Except where otherwise provided, a contract between the Town and a successful proposer shall consist of the Request for Proposal, Specifications, Plans, Proposal, and Acceptance by the Town and these Rules and Regulations. Acceptance by the Town may be by purchase order for the portion of the work awarded to a contractor. 14. All Requests for Proposal shall be publicly advertised in a newspaper having a general circulation within the Town of Manchester, Connecticut. 15. The Request for Proposal shall be made available on the Town of Manchester Purchasing Web Site via the OpenGov Portal. 16. Any act or acts of misrepresentation or collusion shall be a basis for disqualification of any proposal or proposals submitted by such persons guilty of said misrepresentation of collusion. In the event that the Town enters into a contract with any bidder who is guilty of misrepresentation or collusion and such conduct is discovered after the execution of said contract, the Town may cancel said contract without incurring liability, penalty, or damages. 17. In the event that any proposer wishes to protest the potential award of a proposal, the proposer must make it’s protest in writing, identify the protesting party, the RFP number, title and shall include a factual summary of the basis of the protest including any documents that shall be considered and request a conference with respect thereto. Said protest must be received in the Town of Manchester Purchasing Office, within FIVE (5) business days after the award decision. 18. A conference with respect to said protest shall be scheduled by the Purchasing Authority and shall be attended by the Purchasing Authority or their designee and such other persons as the Purchasing Department and the Town Manager shall require attend. The subject matter of said conference shall be limited to the reasons for the protest specified in the written request for said conference. Said conference shall also include a discussion of all possibilities for a resolution of dispute. The Town shall make a decision in writing within three (3) business days after said conference and notify protesting bidder. 19. In the event that any protesting proposer wishes to take legal action against the Town, they must first fully comply wit Important Instructions for Electronic Submittal Proposers shall create a FREE account with Open Gov Procurement by signing up at https://secure.opengov.com/portal/townofmanchester . Once you have completed account registration, browse back to this page, https://procurement.opengov.com/portal/townofmanchester and click on "Submit Response", and follow the instructions to submit the electronic bid. Instructions to Bidders In accordance with the provisions of the Town Charter, sealed proposals will be received through the OpenGov Portal, not later than the date and time set forth above, for furnishing the commodities and/or services listed herein. Proposals must be executed in accordance with and subject to instructions and specifications contained herein. STANDARD INSTRUCTIONS TO BIDDERS Materials or Construction Overview: The Town of Manchester (Town) desires to engage a contractor to provide the services in support of the RFQ-RFP INFLOW AND INFILTRATION ENGINEERING SERVICES FOR WATER & SEWER . Description of Project: INFLOW AND INFILTRATION ENGINEERING SERVICES FOR WATER & SEWER Services Required: The Town reserves the right to award the contract to the contractor deemed to be in the best interests of the Town for the Project after review of the submissions received, not based on cost or any other specific factors. Qualification Requirements: 1. Firm Description – Provide a description and brief history of the firm. Name firms, location of principal and branch offices; length of time in business; and firm ownership structure. 2. Related Experience – Please provide a list of all projects currently in progress and completed over the last five years. The description should at a minimum provide the project name, location, year of completion, type of contract, renovation cost, size, owner name and reference with telephone number. 3. Organization and Staffing – Provide an organization chart for staff proposed for this project which clearly identifies your proposed management staff for the project (Project Executive, Project Manager, Project Superintendent, etc.). Also include detailed resumes for each person identified. 4. Typical Project Approach – Provide description of services your firm will utilize during each phase of the project to ensure the project is completed on schedule and within budget. 5. Litigation/Arbitration – List information on (a) any involvement in litigation or arbitration with municipal clients; and (b) all clients that have terminated your services prior to completion of any project within the past ten (10) years. Explain circumstances that led to it and describe the resolution. 6. Insurance – Contractor/ Vendor shall agree to maintain in force at all times during the contract the following minimum coverages and shall name the Town of Manchester as Additional Insured on a primary and non-contributory basis to all policies except Workers Compensation. 7. Additional Information – Any other information that, in the judgment of the General Contractor, may allow the Town to make a fair assessment of the experience and abilities of the Contractor. INSURANCE AND INDEMNIFICATION REQUIREMENTS GENERAL CONDITIONS: Within ten (10) business days of the award or notice, or prior to the start of work, whichever comes first, the contractor will provide, pay for, and maintain in full force and effect the insurance outlined here for coverage’s at not less than the prescribed minimum limits of liability. Such coverage is to remain in force during the life of the contract and for such additional time as may be required, and will cover the contractor/ independent insured’s activities, those of any and all subcontractors, or anyone directly or indirectly employed by any of them, or by anyone for whose acts any of them may be liable. Any failure to comply with reporting requirements and provisions of the policies shall not affect coverage provided to Town, its officers, officials, agents, or employees. A. Certificates of Insurance: The contractor will give the owner a certificate of insurance completed by a duly authorized representative of their insurer certifying that at least the minimum coverage’s required here are in effect and specifying that the liability coverage’s are written on an occurrence (or claims-made where applicable) form and that the coverage’s will not be canceled, non-renewed, or materially changed by endorsement or through issuance of other policy(ies) of insurance without sixty (60) days advance written notice to the General Services Department. Failure of the owner to demand such certificate or other evidence of full compliance with these insurance requirements or failure of the owner to identify a deficiency from evidence provided will not be construed as a waiver of the contractor’s obligation to maintain such insurance. Any failure to comply with reporting requirements and provisions of the policies shall not affect coverage provided to Town, its officers, officials, agents, or employees. B. Insurer Qualification: All insurance will be provided through companies authorized to do business in the State of Connecticut and considered acceptable by the owner. Insurance Companies shall maintain a minimum A.M. Best rating of A-/VIII. C. Additional Insured: The policy or policies providing insurance as required, with the exception of professional liability and workers’ compensation, will defend and include the owner, directors, officers, representatives, agents and employees, and where applicable owner’s architects or engineers, as additional insureds on a primary and noncontributory basis for work performed under or incidental to this contract. D. Retroactive Date and Extended Reporting Period: Coverage, whether written on a claims made or occurrence basis, shall be maintained without interruption from the date of commencement of the Work until date of final payment and then extended for an additional three (3) years from date of final payment. If any insurance required here is to be issued or renewed on a Claims Made form as opposed to an Occurrence form, the retroactive Date for coverage will be no later than the commencement date of the project. The Claims Made form will have an Extended Reporting Period of three years from the date of project completion. All Claims made policies cancelled or non-renewed and not replaced by a subsequent claims made policy will have an Extended Reporting period of three years from the date of cancellation or non-renewal. E. Subcontractors’ Insurance: The contractor will require each subcontractor hired by and/or employed by contractor to purchase and maintain insurance of the types specified below. When requested by the owner, the contractor will furnish copies of certificates of insurance evidencing coverage for each subcontractor. F. Waiver of Subrogation: The contractor/subcontractor will purchase required insurance policies that shall be endorsed with a waiver of subrogation and all rights of recovery in favor of the Town, its officers, officials, agents and employees. The contractor will require of subcontractors, by appropriate written agreements, similar waivers each in favor of all parties enumerated in this section. G. Indemnification/Defense/Hold Harmless: To the extent provided by law, the contractor shall indemnify, defend, and hold harmless the owner, officers, officials, agents and employees, and if applicable, the engineer and their agents and employees from and against all claims, damages, losses and expenses, including attorney’s fees of counsel selected by the owner, arising out of or resulting from the performance of the work and /or the supplying of materials, provided that any such claim, damage, loss or expense (a) is attributable to bodily injury, sickness, disease or death, or to injury to or destruction of tangible property including the loss of use resulting therefrom, and (b) is caused in whole or in part by any neglige Source: OpenGov https://procurement.opengov.com/portal/townofmanchester/projects/322523 Canonical URL: https://govcontractfinder.com/contracts/rfq-rfp-inflow-and-infiltration-engineering-services-for-wat-opengov-3998-project-322523