San Juan Lateral Extension Phase I - 2023 Bond Project No. 25 State and local opportunity open Hidalgo County Drainage District 1, TX HCDD1-25-040-12-09-ESZ Posted: 2026-11-24T04:15:01.327Z Response deadline: 2026-12-09T15:30:00.000Z The project as proposed will increase flow and capacity to the existing system within the existing Right-of-Way in order to better drain the upstream portion of the system that drains the affected area within the city of San Juan. The alignment for the project begins just south of Sam Houston Blvd and reaches to the IBWC Levee outfall that is managed by a gatewell structure. No work is proposed within the IBWC levee. The project consists consists of ditch widening, regrading, reconstruction, re-alignment, installation of storm structures such as field drains, outfalls, riprap, headwalls, crossings, and all other relevant appurtenances. There are 3 road crossings of 2-lane roads where full road closures will need to be coordinated and implemented with the presiding municipality, Metal Beam Guard Fence is proposed at these crossings. SW3P is also proposed throughout the project. BASE BID Ditch Excavation "Cut & Dispose" Drain Ditch "Fill" Temporary Sediment Control Fence 5" Concrete Rip-Rap (3600 PSI) Storm Manhole Trench Protection and Structure Shoring Barricades, Signs, and Traffic Handing Construction Exits (TY.2) (Install & Remove) Remove & Dispose Exist 18" - 36" Storm Pipe Remove & Dispose Down Drains and Drainage Structure 18" RCP Pipe Class III 24" RCP Pipe Class III 30" RCP Pipe Class III 36 RCP Pipe Class III Type "CC" Inlets w/Tie Into Exist Pipe and Concrete Apron Backfill & Compaction* Remove & Dispose Exist Concrete Rip-Rap 18" Nyloplast Drain Sta 12+75 (A) 18" Nyloplast Drain Sta 12+75 (B) 18" Nyloplast Drain Sta 26+50 (A) 18" Nyloplast Drain Sta 26+50 (B) 18" Nyloplast Drain Sta 41+27 (A) 18" Nyloplast Drain Sta 41+27 (B) 18" Nyloplast Drain Sta 49+75 (A) 18" Nyloplast Drain Sta 49+75 (B) 18" Nyloplast Drain Sta 49+75 (C) 18" Nyloplast Drain Sta 53+95 (A) 18" Nyloplast Drain Sta 53+95 (B) 18" Nyloplast Drain Sta 54+00 (A) 18" Nyloplast Drain Sta 54+00 (B) 18" Nyloplast Drain Sta 65+35 (A) 18" Nyloplast Drain Sta 65+35 (B) 18" Nyloplast Drain Sta 71+05 (A) 18" Nyloplast Drain Sta 71+05 (B) Concrete Canasta for Nyloplast Drain 18" HPP-Bedding & Backfill Complete in Place ALTERNATE BID RAFFIC CONTROL AND REGULATION REMOVE CONC. HEADWALL REMOVE CONC. RIP RAP CEMENT STABILIZED SAND EMBANKMENT TRENCH SAFETY SYSTEM REMOVE PIPE (24 IN) REMOVE PIPE (72 IN) REINFORCED CONCRETE PIPE (24 IN) REINFORCED CONCRETE PIPE (60 IN) REINFORCED CONCRETE PIPE (72 IN) HEADWALL (CH-FW-0) RETROREFLECTIZED PAVEMENT MARKINGS (4 IN BRK (Y)) RETROREFLECTIZED PAVEMENT MARKINGS (4 IN SLD (W)) REFLECTORIZED RAISED PAVEMENT MARKERS TY II A-A PAVEMENT REPAIR AND RESTORATION METAL BEAM GUARD FENCE REMOVE & RELOCATE GATE CONCRETE RIP RAP (5 IN) SCOPE OF WORK TCEQ Requirements Please note that this project will require a Construction General Permit (CGP) from TCEQ. https://www.tceq.texas.gov/permitting/stormwater/construction#stormwaterrequirements “ The CGP requires construction site operators to develop and implement a Stormwater Pollution Prevention Plan (SWP3) prior to commencing construction. Contractor must submit copy of TCEQ NOI prior to commencing any clearing activities. A copy of the approved Stormwater Pollution Prevention Plan (SWP3) is required to be onsite for the duration of construction. Proposed Typical Work Regrading, Reconstruction, and Widening Existing Single Trapezoidal Ditch Geometry Widen to Double Trapezoidal Section w/ Interior Maintenance Benches All Widening Proposed Within Existing HCDD 1 ROW Some locations are already excavated. These areas will be modified as necessary to conform to the plan design. Road Crossings Exist pipe crossings to remain in place and extended as per plan Additional crossing pipe to be installed parallel to existing pipe to HCDD1 standards and specifications. Road to reconstructed to city standards and specifications and Right of Way to be restored to similar condition or better than existing conditions Location of Stockpile for Excavated Material from the Project Contractor is responsible for hauling and location. Location must be approved by HCDD1. No stock piles of dirt, construction materials / debris, etc. will be allowed inside of the floodway Excavated Material shall consist of only clean soil (no spoils or debris) Site Management HCDD1 strongly recommends that Contractor photograph the project site prior to construction. All agreements between the Contractor and Property Owner(s) for stockpiles and/or storage of materials and equipment must be documented in writing and submitted to HCDD1. The contractor shall ensure that all equipment is securely stored and left in a safe and stable position at the end of each workday. This includes, but is not limited to, properly securing or locking any machinery, tools, or materials, and taking appropriate precautions to prevent damage, theft, or accidents. Utility Coordination Contractor will coordinate with utility companies / entities prior to start of construction. Coordination includes utility adjustments for water and sewer lines. Traffic Control Contractor will coordinate with City of San Juan prior to construction for all Traffic Control phasing and notify all entities (schools, district, 911, police / fire departments, etc.) of road closures. Contractor will be responsible for all traffic control devices, signs, etc. INVITATION LETTER Summary Background Contact Information Timeline SUBMISSION DETAILS SUBMISSION OPTIONS & REQUIREMENTS Respondents have two (2) options for submitting a response. Respondents shall submit their response using one (1) of the following methods ( DO NOT duplicate submittals by submitting both an electronic and hard copy response. Respondents shall select only one (1) method to respond).: Submit responses electronically via the PORTAL https://procurement.opengov.com/portal/hcdd1 : on or before Wednesday, December 9, 2026 , at 9:30 am . OR; Submit one (1) hard copy and one (1) USB in original PDF format via personal hand-delivery or delivery service on or Wednesday, December 9, 2026 , at 9:30 am . Any bid received after this deadline will not be accepted and will be returned unopened to the sender. HAND DELIVERED SUBMISSION When hand delivering the packet, Proposer should make sure that the package is stamped with the date and time received by the Hidalgo County Drainage District No.1 staff. DELIVER TO: US Postal Mail Address : ATTN: Melissa Blanco , Buyer I Hidalgo County Drainage District No.1 902 N. Doolittle Rd, Building "A" Edinburg, Texas 78542 Physical Address : ATTN: Melissa Blanco , Buyer I Hidalgo County Drainage District No.1 902 N. Doolittle Rd, Building "A" Edinburg, Texas 78542 FIRM INSTRUCTIONS Responses to this procurement packet shall be formatted and organized in the following order for consistency and easy screening: All submissions must be typed, single-spaced, and printed one-sided on 8 ½” by 11” paper. One (1) hard copy, marked “ORIGINAL” and one (1) USB in PDF format. The original document must be submitted with a Cover Page containing the information listed in the Submission Outline/Checklist, under the Submission Cover Page. The complete response must be sealed in an appropriately sized envelope or box for delivery to the Hidalgo County Drainage District No.1, per instructions. All documents must be labeled with the firm’s name and the RFB number. Responses that are not identified with the RFB number on the outside, will be at risk of rejection. SUBMISSION OUTLINE/CHECKLIST To assist in ensuring all submissions received are complete, it is recommended for the Offeror to use this Submission Outline as a Checklist prior to submitting a response. All Responses must be submitted in the following order with the guidelines provided within this solicitation. Table of Contents Invitation Letter Submission Details Electronic Submission Documents Required Confirmations/Documents Electronic Submission Acknowledgment - (Confirmation) Requirements/Specifications - (Confirmation) Legal Notice & Acknowledgment - (Document) Review Finalized Set of Construction Plan - (Confirmation) Insurance Requirements - (Document) Bid Bond Acknowledgment - (Document) Conflict of Interest Questionnaire - Copy of County Clerk File with fee receipt (when applicable) - (Document) Project Requirements Acknowledgment - (Document) HUB Declaration - (Document) Vendor Acknowledgment - (Confirmation) Certification Regarding Debarment - (Document) Title VI Appendices [A -E] - (Confirmation) Sam.Gov Registration - (Confirmation) Form 1295 - (Document) Required Contract Clauses For Contracts Under Federal Award Byrd Anti-Lobbying Contract Clause - (Document) 2 CFR 200 Certification - (Document) FHWA 1273 - (Confirmation) David Bacon Act Wages Determination - (Confirmation) Prevailing Wage Rates Certification Statement - (Document) Proposer's Affidavit - (Document) Draft Agreement - (Confirmation) Standard General Conditions of the Construction Contract - (Confirmation) Reference Form - (Document) Construction Identification Sign - (Confirmation) Statement of Credentials - (Document) Company/Firm Response - (Document) Cover Sheet Company Name, Company Address, Company Phone Number Project Name: San Juan Lateral Extension Phase I - 2023 Bond Project No. 25 Procurement Number: HCDD1-25-040-12-09-ESZ Opening Date: Wednesday, December 9, 2026 Opening Time: 9:30 am Complete Response (All Required Information/Documents) Addenda (when applicable; see Addenda under Legal Notice) - (Confirmation) (Confirmation) = A confirmation is required for this section. (Document) = A document submission is required for this section. ELECTRONIC SUBMISSION Hidalgo County Drainage District No.1 will only accept electronic responses that are submitted via the PORTAL: https://procurement.opengov.com/portal/co-hidalgo-tx?departmentId=3417&status=all&page=1&limit=10&sortField=proposalDeadline&sortDirection=ASC The DISTRICT will NOT accept telegraphic, emailed, nor responses submitted via facsimile. *When submitting a response electronically, the firm will be required to complete all the sections found in this solicitation in order for the submission to be valid. LEGAL NOTICE Sealed bids will be received for HIDALGO COUNTY DRAINAGE DISTRICT NO. 1- San Juan Lateral Extension Phase I - 2023 Bond Project No. 25 in accordance with the specifications attached heret o. Bids should address all specifications set forth. Bidders may suggest substitutions of features which they feel would be in the best interest of Hidalgo County Drainage District No. 1 (“District”). Strong rationale must be presented for any deviation from the specifications. Hidalgo County Drainage District No. 1 reserves the right to reject the deviation and its effect on the overall bid. IF YOU HAVE A PHYSICAL SUBMISSION: NO FACSIMILES OR LATE ARRIVALS WILL BE ACCEPTED. ANY RFB RECEIVED AFTER THAT TIME WILL NOT BE OPENED AND WILL BE RETURNED. Hidalgo County Drainage District No. 1 reserves the right to refuse and reject any/all bids and to waive any/all formalities or technicalities, or to accept the bids considered the best and most advantageous to Hidalgo County Drainage District No. 1. Hidalgo County Drainage District No. 1 reserves the right to: A.) separate and accept, replace and accept, or eliminate any item(s) listed under this bid, including alternates, that it deems necessary to accommodate budgetary and/or operational requirements; B.) reject any or all bids submitted and further reserves the right to design the elevation criteria to be used in selecting the lowest and best bid for approval; and C.) award the bid to one bidder or to multiple bidders if the District determines it is in its best interest to do so. The Bidder shall not substitute items named in the bid without the express written consent of Hidalgo County Drainage District No. 1. Failure of the delivered item to perform as specified or failure to meet the stated delivery schedule shall release Hidalgo County Drainage District No. 1 from all obligations to the contracting party with regard to the item(s) in question. In such an event, the District may elect to award the contract to the next-lowest responsible bidder, or to reject all bids and re-advertise. For work to be performed at a District owned or operated location, each bidder shall, in its sole discretion, visit the job site before preparing the bid and thoroughly familiarize himself/herself with existing conditions. Bidder should take field dimensions and note all circumstances which affect the dollar amount of the bid. Descriptive specifications are referenced in this document to indicate the general kind and quality of equipment desired by Hidalgo County Drainage District No. 1. Due to various styles and models of equipment, bidders are required to include illustrations, specifications, explanation of warranties, and service data with their bid including catalogue numbers and any necessary references. No bid may be withdrawn within thirty (30) days from the scheduled time to open bids. Proposed prices are to remain firm for a minimum of ninety (90) days after bid opening. Any interpretations, amendments, corrections or changes to this bid document must be in a written addendum and signed by the County Judge or his designee. Addenda will be mailed to all who are known to have received a copy of the Request for Bids. Bidders shall acknowledge receipt of all addenda as part of their bid. Costs are to be net F.O.B., District Prepaid. The District is exempt from Federal Excise Tax, State Tax and Local Tax. Do Not include tax in cost figure. If it is determined that tax was included in the cost figures it will not be included in the tabulation of any awards. Tax exemption certificates will be furnished upon request. Funds for this procurement have been provided through the District budget for this fiscal year only. The District, on an annual basis, has the right to reconsider a contract during the budget process for ensuing years if financial resources of the District are insufficient to meet the liabilities of said contract. The award of a bid or contract hereunder will not be construed to create a debt of the District which is payable out of funds beyond the current fiscal year. Upon award and prior to execution of a contract, Sole Proprietorships are required to submit a copy of their social security cards to the Hidalgo County Drainage District No. 1 Office in order to establish an account with the District. All awarded vendors must submit a completed W-9 and a copy of their Federal ID Number Certificate. (IF APPLICABLE) -DELIVERY OF GOODS AND SERVICES INSTRUCTIONS: No deliveries accepted after 3:00 P.M., Monday-Friday At least seventy-two (72) hours prior notice of delivery must be given to Justin Silva, Buyer I before delivery will be accepted. If you need additional information, call the office listed below: Hidalgo County Drainage District No. 1 Enriqueta Zambrano, Procurement Manager (956) 292-7080 BILLING AND PAYMENT INSTRUCTIONS: Invoices must include: Name and address of successful bidder Name and address of receiving department or official Purchase Order Number (if any) Notation- San Juan Lateral Extension Phase I - 2023 Bond Project No. 25 Descriptive information as to the items or services delivered, including product code, item number, quantity, etc. Purchase Order No. and Contract number must be indicated on all invoices Discount payments will be considered when offered. Contact person for Billing and Payment questions: Attn: Nora D Cavazos, Executive Assistant III Hidalgo County Drainage District No. 1 902 N. Doolittle Rd. (Bldg. A) Edinburg, Texas 78542 (956) 292-7080 BID OR PERFORMANCE BOND AND DEBARMENT CERTIFICATION; PAYMENT UNDER CONTRACT: If the contract proposed is for the construction of public works or is for a contract for goods & services exceeding $100,000, all bidders shall furnish a good and sufficient bid bond in the amount of five percent (5%) of the total contract price. A bid bond must be executed with a surety company authorized to do business in Texas. All bidders are also required to furnish a certification or acknowled BID TAB SHEET ELECTRONIC SUBMISSION DOCUMENTS ATTACHMENTS Source: OpenGov https://procurement.opengov.com/portal/hcdd1/projects/328685 Canonical URL: https://govcontractfinder.com/contracts/san-juan-lateral-extension-phase-i-2023-bond-project-no-25-opengov-1718378542-project-328685