Santa Fe Regional Airport, Airport Certification Manual, Airport Emergency Plan, and Snow and Ice Control Plan Rewrite State and local opportunity open City of Santa Fe, NM FY27-TRFP-033 Posted: 2026-11-20T23:30:47.436Z Response deadline: 2026-12-04T22:00:00.000Z The purpose of the RFP is to solicit sealed proposals to establish a contract through competitive negotiations for the procurement of: The Santa Fe Regional Airport (SAF) is seeking qualified and experienced vendors to develop and produce a complete and comprehensive Airport Certification Manual (ACM), Airport Emergency Plan (AEP), and Snow and Ice Control Plan (SCIP). The selected vendor shall also develop a complete and derivative Snow and Ice Control Plan (SICP) and Airport Emergency Plans (AEP) that is consistent for current classification, certificate limitations, exemptions, and any further applicable requirements for FAA-certificated Part 139 airports. The purpose of this project is to develop a new, comprehensive, accurate, and operationally functional ACM that reflects the current operations, facilities, equipment, personnel, policies, procedures, and regulatory requirements of Santa Fe Regional Airport. The consultant will be responsible for verification that the completed ACM is designed correctly for the Santa Fe Regional Airports procedural assignments and responsibilities reflecting current Airport Operations. SCOPE OF WORK This section is used by the department to provide a Detailed Scope of Work that will also be included in the Draft Contract and the resulting contract. Scope of Work The consultant shall provide the coordination, document development, and project management necessary to complete all three documents. This effort shall include: Conducting an initial review and gap analysis of existing Airport documents, procedures, and applicable FAA requirements. Conducting onsite meetings and interviews with Airport Operations, Airport Maintenance, Aircraft Rescue and Firefighting (ARFF), and other applicable Airport personnel to understand existing operational practices and capabilities. Coordinating with Airport departments, tenants, outside agencies, and other applicable stakeholders throughout the development process. Facilitating document review periods, stakeholder meetings, and coordination necessary to obtain and incorporate applicable comments. Maintaining communication with the Airport regarding project progress, outstanding information, coordination needs, and anticipated completion dates. Coordinating with the FAA throughout the development process and addressing applicable FAA comments and requested revisions. Providing final documents in professionally formatted, editable electronic format and PDF. Providing final revisions and incorporating applicable Airport and stakeholder comments prior to acceptance. Airport Certification Manual (ACM) The consultant shall develop a complete and comprehensive ACM incorporating all applicable requirements under 14 CFR Part 139 and applicable FAA guidance. The ACM shall accurately reflect the Airport's current operations, procedures, responsibilities, and certification programs, including but not limited to: Airport operational responsibility, succession, and assigned duties. Movement areas, safety areas, pavement, markings, signage, and lighting. Training, records, self-inspections, and airport condition reporting. Aircraft rescue and firefighting (ARFF) facilities, equipment, staffing, and procedures. Fueling and hazardous materials, vehicle and pedestrian controls, and obstruction management. Wildlife hazard management, public protection, construction and unserviceable areas, and navigational aid protection. Applicable emergency planning requirements and references to the Airport Emergency Plan. Snow and Ice Control Plan (SICP) The consultant shall develop a complete and comprehensive SICP reflecting the Airport's current winter operations, available equipment, staffing, responsibilities, and snow removal procedures. The SICP shall include, but not be limited to: Review and evaluation of existing snow and ice control procedures. Airport snow removal priorities and designated operational areas. Personnel responsibilities, training, and equipment requirements. Snow removal procedures for movement areas, non-movement areas, ramps, and designated priority surfaces. Snow accumulation monitoring, reporting, and airport condition assessments. Coordination with airport tenants, airlines, and other affected stakeholders. Snow disposal locations and applicable restrictions. Applicable FAA requirements and coordination with the FAA, as necessary. Airport Emergency Plan (AEP) The consultant shall perform a complete and comprehensive rewrite of the AEP. This effort shall include extensive coordination with local, state, federal, and other emergency response agencies, Airport departments, tenants, and applicable stakeholders. The consultant shall be responsible for facilitating the coordination necessary to develop an accurate, comprehensive, and operationally practical emergency plan. The AEP development shall include, but not be limited to: Review and evaluation of the existing AEP and applicable FAA requirements. Identification of participating agencies, stakeholders, and emergency response partners. Coordination and facilitation of interagency meetings to establish emergency response roles, responsibilities, and procedures. Development and revision of emergency response procedures for applicable emergency scenarios. Establishment of agency notification procedures, communication protocols, and emergency coordination responsibilities. Review of emergency response resources, equipment, airport access points, staging areas, and response capabilities. Coordination of agency reviews, comments, and revisions throughout the development process. Incorporation of agency feedback and stakeholder input into the final document. Development of procedures for emergency exercises, training, and ongoing plan maintenance. Final coordination and submission of the completed AEP to the FAA, as applicable. Deliverables The selected consultant shall provide complete, comprehensive, and professionally organized updates and rewrites of the following Airport certification and operational documents for Santa Fe Regional Airport: the ACM, SICP, and AEP. All documents shall incorporate applicable FAA requirements and accurately reflect the Airport's current operations, procedures, responsibilities, resources, and programs. INTRODUCTION PURPOSE OF THIS RFP The Santa Fe Regional Airport (SAF) is seeking qualified and experienced vendors to develop and produce a complete and comprehensive Airport Certification Manual (ACM.) for Santa Fe Regional Airport. The selected vendor shall also develop a complete and derivative Snow and Ice Control Plan (SICP) and Airport Emergency Plans (AEP) that is consistent for current classification, certificate limitations, exemptions, and any further applicable requirements for FAA-certificated Part 139 airports. The purpose of this project is to develop new, comprehensive, accurate, and operationally functional ACM that reflect s the current operations, facilities, equipment, personnel, policies, procedures, and regulatory requirements of Santa Fe Regional Airport. The consultant will be responsible for verification that the completed manual and plans are designed correctly for the Santa Fe Regional Airports procedural assignments and responsibilities reflect current Airport Operations. SCOPE OF PROCUREMENT The resulting contract will result in a Professional Services Contract with a term of one (1) year with the option to extend to two (2) years. The SAF is in need of a firm to rewrite a comprehensive ACM, AEP, and SCIP, that will be ready for full review by the Federal Aviation Administration (FAA). The current manuals and plans are outdated and require revisions to meet current FAA Advisory Circulars (14 CFR Part 139). This revision process will require communication with the SAF Operations Manager and possible onsite coordination. PROCUREMENT MANAGER Sebastian Gallegos has assigned a Procurement Manager who is responsible for the conduct of this procurement whose name, telephone number, and email address are listed below: Sebastian Gallegos, Airport Project Manager 505-695-3538 sfgallegos@santafenm.gov Any inquiries or requests regarding this procurement should be submitted via the OpenGov Procurement Portal at https://procurement.opengov.com/portal/santafenm/projects/324046 . DEFINITION OF TERMINOLOGY This section contains definitions of terms used throughout this procurement document, including appropriate abbreviations: “Addendum” means a written or electronic document issued by the City to modify, clarify, or supplement the information in the original RFP prior to the proposal due date. This may also be called Amendment or RFP Amendment. “Amended Proposal” means a revised and complete version of a proposal submitted by an Offeror prior to the proposal due date, clearly labeled as superseding the original submission. “Authorized Purchaser” means an individual authorized by Santa Fe Regional Airport to place orders against this contract. “Award” means the point at which the contract document has been fully executed. See also “Contract” and “Final Award" . “Best and Final Offer” or “BAFO” means a final revised proposal submitted by an Offeror, upon request by the City, to provide updated pricing or other proposal elements. “Business Hours” means the normal business hours of the Requesting department; 8:00 AM through 5:00 PM Mountain Standard or Daylight Time, whichever is in effect on the date given. “Central Purchasing Division” or “CPD” means the City office responsible for overseeing and managing the procurement of tangible personal property, services, and construction, including ensuring compliance with applicable procurement laws, policies, and procedures. “Chief Procurement Officer” or “CPO” means that person within the CPD who is responsible for the control of procurement of items of tangible personal property, services, or construction. “City” means the City of Santa Fe, New Mexico which in the procurement context may act through the Finance Director, City Manager, or Governing Body. City align expectations, mitigate risk, and finalize project understanding prior to contract execution.. “Confidential” means confidential financial information concerning Offeror’s organization and data that qualifies as a trade secret in accordance with the Uniform Trade Secrets Act NMSA 1978, Sections 57-3-A-1 through 57-3A-7. The following items may not be labelled as confidential: Offeror’s submitted Cost response, Staff/Personnel Resumes/Bios (excluding personal information such as personal telephone numbers and/or home addresses), and other submitted data that is not confidential financial information or that qualifies under the Uniform Trade Secrets Act. “Contract” means any agreement or Price Agreement for the procurement of items of tangible personal property, services, or construction. “Contractor” means any business having a contract with the City of Santa Fe. “Department” means the Requesting Department sponsoring this Procurement. “Determination” means the written documentation of a decision of a procurement officer including findings of fact required to support a decision. A determination becomes part of the procurement file to which it pertains. “Desirable” the terms “may,” “can,” “should,” “preferably,” or “prefers,” identify a desirable or discretionary item or factor. “Electronic Submission” means a successful submittal of Offeror’s proposal consisting of text, images or both readable on computers or other electronic devices. “Evaluation Committee” means a body appointed to perform the evaluation of Offerors’ proposals. “Evaluation Committee Report” means a report prepared by the Procurement Manager and the Evaluation Committee to support the Committee’s recommendation for contract award. It will contain scores and written evaluations of all responsive Offeror proposals. “Final Award” means the point at which the contract(s) resulting from this RFP have been fully executed through the final required signature—either by the City Manager or City Mayor, depending on the contract amount—thereby making the contract(s) legally binding. See also “Contract.” “Finalist” means an Offeror who meets all the mandatory specifications of this RFP and whose score on evaluation factors is sufficiently high to merit further consideration by the Evaluation Committee. “Hourly Rate” means the proposed fully loaded maximum hourly rates that include travel, per diem, fringe benefits and any overhead costs for contractor personnel, as well as subcontractor personnel if appropriate. “Living Wage” means the minimum hourly wage established by the City of Santa Fe’s Living Wage Ordinance, which contractors must comply with, as posted at https://santafenm.gov/economic-development/business-resources/living-wage-information . “Mandatory” the terms “must,” “shall,” “will,” “is required,” or “are required,” identify a mandatory item or factor. Failure to meet a mandatory item or factor may result in the rejection of the Offeror’s proposal. “Minor Irregularities” means anything in the proposal that does not affect the price, quality and/or quantity, or any other mandatory requirement. “Offeror” means any person, corporation, or partnership who chooses to submit a proposal. “OpenGov” means the City of Santa Fe’s official electronic procurement platform used to post solicitations, receive vendor proposals, facilitate communication with Offerors, and manage procurement activities in a transparent, streamlined, and auditable manner. “Procurement Manager” or “PM” means any person authorized by both the CPD and the Requesting Department to facilitate the procurement process and/or administer the resulting contract(s). The Procurement Manager is re PROCUREMENT LIBRARY A procurement library has been established. Offerors are encouraged to review the material contained in the Procurement Library by viewing the attachment section of the solicitation. The library contains information listed below: Electronic version of RFP, Questions & Answers, RFP Amendments, etc. https://procurement.opengov.com/portal/santafenm/projects/324046 CONDITIONS GOVERNING THE PROCUREMENT This section of the RFP contains the schedule of events, the descriptions of each event, and the conditions governing this procurement. TIMELINE The CPD and the Procurement Manager will make every effort to adhere to the following schedule: Issue RFP: November 20, 2026 Deadline for Written Questions: November 25, 2026, 5:00pm Response to Written Questions: November 26, 2026, 5:00pm Proposals Due Date: December 4, 2026, 3:00pm Evaluation*: December 7, 2026, 10:00am Best and Final Offers*: December 14, 2026, 3:00pm Finalize Contracts*: December 16, 2026 Contract Award*: January 29, 2027 *Dates indicated after "Proposals Due Date" are estimates only and may be subject to change without necessitating an amendment to the RFP. Explanation of Events The following paragraphs describe the activities listed in the Timeline/Sequence of Events. The City reserves the right to: Change or extend the Proposals Due Date. Revise the RFP before the due date. The city will process addenda if it is determined that modifications, clarifications, or additions to the RFP are necessary. Similar to the initial invite, addenda will be emailed to registered Potential Offerors who have selected the commodity codes for this event. Issue RFQ This RFQ is being issued on behalf of the City on the date indicated in the timeline. Deadline for Written Questions Potential Offerors may submit written questions to CPD and the Procurement Manager as to the intent or clarity of this RFQ as indicated in Section the Timeline. All written questions must be submitted via the OpenGov Procurement Portal. Questions shall be clearly labeled and shall cite the Section(s) in the RFQ or other document which form the basis of the question. Responses to Written Questions Responses to the written questions will be provided on OpenGov, on or before the date indicated in the Timeline. Proposals Due Date Only electronic proposal submission is allowed. ALL PROPOSALS MUST BE SUBMITTED FOR REVIEW AND EVALUATION BY THE CPD AND EVALUATION COMMITTEE VIA UPLOAD. Pursuant to NMSA 1978, Section 13-1-116, the contents of proposals shall not be disclosed to competing Offerors during the negotiation process. The negotiation process is deemed to be in effect until the contract is awarded pursuant to this RFQ. Awarded in this context means approved by the City Manager or Mayor. Evaluation An Evaluation Committee will perform the evaluation of proposals. This process will take place as indicated in the timeline, depending upon the number of proposals received. During this time, CPD or/and the Procurement Manager may initiate discussions with Offerors who submit responsive or potentially responsive proposals for the purpose of clarifying aspects of the proposals. However, proposals may be accepted and evaluated without such discussion. Discussions SHALL NOT be initiated by the Offerors. Selection of Finalists The Evaluation Committee will select, and the Procurement Manager will notify the finalist Offerors as per the timeline or as soon as possible thereafter. A schedule for Oral Presentation, if any, will be determined at this time. Finalists will be comprised of the Offerors receiving the highest cumulative scores in the following sections: Organizational Experience, Organizational References, and Mandatory Specifications. Finalize Contracts After approval of the Evaluation Committee Report, any contractual agreement(s) resulting from this RFQ will be finalized with the most advantageous Offeror(s), taking into consideration the evaluation factors set forth in this RFQ, as per Section the Timeline or as soon as possible thereafter. The most advantageous proposal may or may not have received the most points. In the event mutually agreeable terms cannot be reached with the apparent most advantageous Offeror in the timeframe specified, the City of Santa Fe reserves the right to finalize a contractual agreement with the next most advantageous Offeror(s) without undertaking a new procurement process. Contract Awards Upon receipt of the signed contract, the Department will award pursuant to the Timeline, or as soon as possible thereafter. The award is subject to appropriate Department and City Manager/Governing Body or Board approval. Contractors must not commence work until the Department issues them a Purchase Order (PO) and instructions to start. Protest Deadline Any protest by an Offeror pertaining to the solicitation or award must be submitted within 15 days from the notice of solicitation or award and in conformance with NMSA 1978, Section 13-1-172 and applicable procurement regulations. As a Protest Manager has been named in this RFQ, pursuant to NMSA 1978, Section 13-1-172 and Procurement Manual Section Y, ONLY protests delivered directly to the Protest Manager in writing and in a timely fashion will be considered to have been submitted properly and in accordance with statute, rule, and this RFQ. The 15-calendar day protest period shall begin on the day following the notice of award of contract(s) and will end at 5:00 pm MST/MDT on the 15th day. Protests must be written and must include the name and address of the protestor and the RFQ number. The protest must include a detailed statement of the grounds for the protest, al Source: OpenGov https://procurement.opengov.com/portal/santafenm/projects/324046 Canonical URL: https://govcontractfinder.com/contracts/santa-fe-regional-airport-airport-certification-manual-airpo-opengov-1784201-project-324046