SHIP Program Julio Bueno - Exterior Paint State and local opportunity evaluation City of Hialeah, FL 2026-27-010 Posted: 2026-10-23T19:00:01.916Z Response deadline: 2026-11-25T16:00:00.000Z The Community Services Division is seeking quotations from experienced and qualified contractors to establish vendors for our Homeowner-Occupied Rehabilitation Program. Contractors selected may be awarded based on their qualifications, cost-effectiveness, and capacity to complete work within the required timeframe. The scope of work for the Julio Bueno project includes: Stucco Repair & Smooth‑Finish Conversion House Exterior Painting SCOPE OF WORK Stucco Repair & Smooth‑Finish Conversion Existing Conditions : The existing stucco exhibits cracking, delamination, surface roughness, and weather‑related deterioration. The finish has a rough texture that is inconsistent with the desired smooth architectural appearance. Areas of loose, hollow, or compromised stucco are present and require removal and repair. Scope of Work: The Contractor shall perform comprehensive repairs to the exterior façade stucco across all elevations of the residence. Work includes removal of deteriorated stucco, correction of substrate deficiencies, resurfacing of the entire exterior with new cementitious stucco, and conversion from the existing rough texture to a uniform smooth finish. Upon completion of stucco work, all exterior surfaces shall be primed and painted. Stucco Removal & Surface Preparation Remove all loose, delaminated, hollow‑sounding, or compromised stucco down to a sound substrate. Clean surfaces to remove dust, debris, efflorescence, and contaminants. Perform crack repairs using V‑groove cutting, cleaning, and application of approved bonding agent. Where metal lath is exposed or deteriorated, replace with galvanized lath installed per ASTM C1063. Ensure substrate is structurally sound and ready to receive new stucco. Stucco Application - Smooth Conversion Base Coat Apply bonding agent to all prepared surfaces. Install new cementitious stucco base coat per ASTM C926 and Florida Building Code requirements. Float and level base coat to eliminate surface irregularities and prepare for finish coat. Finish Coat – Smooth Texture. Apply a full resurfacing finish coat designed to achieve a smooth, uniform architectural appearance. Finish shall be troweled smooth, free of ridges, bumps, or texture inconsistencies. Contractor shall ensure consistent finish across all elevations, including transitions at corners, soffits, and architectural details. Control Joints & Expansion Joints Inspect existing control joints for proper placement and condition. Replace or add control joints as required to comply with ASTM C1063 spacing and layout standards. Ensure joints are properly integrated into the smooth finish. Curing & Moisture Control Maintain proper curing conditions per manufacturer recommendations and ASTM standards. Protect stucco from premature drying, excessive moisture, or impact during curing. Verify that moisture intrusion points (penetrations, windows, doors, utility entries) are properly sealed. Primer & Exterior Painting After stucco has fully cured, apply one coat of approved masonry primer. Apply two coats of high‑quality exterior paint suitable for stucco surfaces. Ensure uniform color, coverage, and finish across all elevations. Protect adjacent surfaces, landscaping, and hardscape during painting operations. Cleanup & Final Delivery Remove all debris, stucco waste, and construction materials from the property. Clean surrounding areas affected by construction activity. Conduct final walkthrough with Owner to verify finish quality and completeness. Codes & Standards: All work shall comply with: Florida Building Code (FBC) ASTM C926 – Application of Portland Cement-Based Plaster ASTM C1063 – Installation of Lathing & Furring HVHZ requirements (Miami‑Dade) Manufacturer installation instructions Industry‑accepted best practices House Exterior Painting Scope of Work : The Contractor shall perform complete exterior painting of the residence following the recent stucco repair and smooth‑finish resurfacing. Work includes surface preparation of the new stucco, application of masonry primer, and two finish coats of Sherwin‑Williams premium exterior paint. All work shall comply with Florida Building Code, Sherwin‑Williams manufacturer specifications, and industry standards. Surface Preparation: Ensure all newly applied stucco has fully cured per ASTM C926 and manufacturer recommendations. Clean all exterior surfaces to remove dust, debris, and construction residue from stucco work. Inspect stucco for imperfections; perform minor patching where necessary using compatible cementitious materials. Caulk gaps at trim, windows, doors, and penetrations using Sherwin‑Williams SherMax™ or equivalent exterior sealant. Mask and protect windows, doors, soffits, fascia, landscaping, and adjacent finishes. Primer Application (Required for New Stucco) Apply Sherwin‑Williams Loxon® Masonry Primer to all new stucco surfaces. Primer shall be applied uniformly to ensure proper adhesion and sealing of the stucco substrate. Allow primer to dry per manufacturer’s recommended curing time before applying finish coats. Finish Coats – Sherwin‑Williams Exterior System Product Selection (Color and Sheen determined once the project is awarded) Approved Sherwin‑Williams systems include: Duration® Exterior Acrylic SuperPaint® Exterior Acrylic Latitude® Exterior Acrylic Resilience® Exterior Acrylic (recommended for moisture‑sensitive conditions) Application Apply two full coats of selected Sherwin‑Williams exterior paint to all stucco walls, fascia, soffits, trim, and architectural elements. Ensure uniform coverage, color consistency, and proper film thickness per manufacturer specifications. Apply paint by brush, roller, or spray as appropriate for substrate and environmental conditions. Final Inspection & Touch‑Ups Inspect all painted surfaces for coverage, uniformity, and finish quality. . Perform touch‑ups as needed to correct thin areas, drips, or inconsistencies. . Remove masking materials and clean all work areas. Cleanup & Disposal Remove all paint debris, masking materials, and waste from the property. Dispose of materials in accordance with local regulations. Leave the property in clean, professional condition. Codes & Standards: All work shall comply with: Florida Building Code (FBC) Sherwin‑Williams manufacturer specifications PDCA Industry Standards HVHZ requirements (Miami‑Dade County) where applicable General Construction Requirements Administrative & Compliance Licensing Requirements: The primary Contractor must possess and maintain a valid State of Florida General Contractor, Specialty Electrical, Roofing, etc. license or equivalent. Permitting: The Contractor is solely responsible for obtaining any applicable municipal, county, or state permits required for the work. All work must strictly comply with the current Florida Building Code and all applicable federal, state, and local life-safety and environmental regulations. Municipal permits issued by the City of Hialeah shall be at no cost to the Contractor; if payments are required, they will be reimbursed. Subcontractor: The Contractor must explicitly identify any potential subcontractors within their quote response using the provided Subcontractor Form. All subcontractors are subject to City approval. Site Verification and Protection of Property Site Conditions: The Contractor is responsible for verifying all field conditions, measurements, and utility locations (utilizing Florida Sunshine One Call) prior to submitting a quote and commencing work. Property Damage: The Contractor shall take full responsibility for maintaining and protecting all existing structures, sidewalks, and utilities. Any damage caused to public or private property by the Contractor must be repaired or restored to the City’s satisfaction at the Contractor's sole expense within thirty (30) days. Safety, MOT, and Site Management Safety & Barricades: The Contractor is responsible for all site safety, including compliance with OSHA regulations. The Contractor must supply and use pedestrian warning devices and barricades to keep the public out of the active work zone. Maintenance of Traffic (MOT): If work affects roadways, the Contractor must maintain passable streets and provide all necessary temporary signs, flagmen, and barricades in accordance with the latest edition of the Manual on Uniform Traffic Control Devices (MUTCD). Debris & Hauling: The Contractor must keep the premises free of waste accumulation. Any debris or waste generated as a result of construction must be removed by a City-authorized waste hauler, or the Contractor must provide proof of disposal at a licensed facility in compliance with local municipal codes. The Contractor shall be responsible for all costs associated with the legal collection and disposal of all construction-related materials. For more information, please visit https://www.hialeahfl.gov/1079/Non-Exclusive-Franchise-Program . Contract Administration & Invoicing Change Orders: Any work that exceeds or varies from the original scope of work must be pre-approved in writing via an official Change Order by the City’s Project Manager before the work is performed. Unauthorized work will not be compensated. Invoicing and Release of Liens: The Contractor must provide all required partial or full Releases of Lien from the primary contractor and any subcontractors or material suppliers with their payment requests. No invoice will be processed for payment until all applicable signed releases of lien have been furnished to the City. Acceptance, Punch List, and Warranties Completed Work & Punch List: Upon completion, the City will inspect the work. Any punch list items or non-conforming work must be completed within thirty (30) days of the final inspection at no additional cost. Work not satisfactorily completed must be corrected at no additional charge to the City. Guarantee: The Contractor guarantees all workmanship and methods to be free of defects for a period of no less than one (1) year from the date of final acceptance. All manufacturer product warranties shall be transferred to the City upon completion. Project Schedule & Access Timeline: The City desires the project to be completed within ninety (90) days of the Notice to Proceed. Work Hours: Work must typically be performed during normal business hours (e.g., Monday-Friday, 8:00 AM - 5:00 PM EST), unless otherwise approved by the City. Any highly disruptive work must be coordinated in advance and may require after-hours or weekend scheduling. Site Security: Contractor personnel must comply with all City security procedures and access requirements. Unforeseen Conditions: If unforeseen structural or site conditions arise that require a deviation from the original scope, the Contractor must notify the City immediately. The Contractor shall not commence any corrective work without prior written authorization. Testing, Deliverables, and Acceptance Criteria Performance Testing: Visual Inspection Only Required Documentation/Deliverables: Prior to final payment, the Contractor must submit the following to the City: As-Built Drawings Manufacturer Warranty Certificates Operations & Maintenance Manuals Final Acceptance: Final acceptance will be granted by the City's designated representative upon successful completion and verification of all physical tasks, testing requirements, and documentation outlined in this Scope of Work. Minimum Qualifications To be considered responsive, the Contractor must possess and submit proof of the following with their quote in the RESPONSE section: Licensing: A valid State of Florida General Contractor, Building, Residential, or hold a Miami-Dade County issued Specialty Lathing and Plastering Contractor. Business Tax Receipt: A valid Business Tax Receipt (BTR). References: A list of two (2) professional references for completed projects of similar size and scope. The list must include the name of the entity, contract dates, a description of the completed work, a contact person, their email address, and a current telephone number. Do not include references from the City of Hialeah. Completed Contracts: Proof of a minimum of two (2) completed contracts within the last two (2) years that are substantially similar in scope and value to the requirements of this solicitation. This list must include the client entity name, the client's contact person, a narrative description of the servi INTRODUCTION Summary Background Contact Information Timeline The following timetable should be used as a working guide for planning purposes. The City reserves the right to adjust this timetable, as the City deems necessary, during the course of this Solicitation process. GENERAL TERMS AND CONDITIONS CITY OVERVIEW Hialeah, Florida (Estimated population of approximately 221,300) is a diverse community, ideally located midway between Miami and Fort Lauderdale, and encompasses approximately 23 square miles. As the fifth largest city in the State of Florida, Hialeah is committed to growth in its business and residential communities, while also focusing on issues such as education, the arts, leisure activities, public safety, and sustainability to provide a viable future for our residents and preserve the City’s rich history since its incorporation in 1925. In 2025 the City is celebrated its centennial. The City currently has 1500+ employees and provides a wide range of governmental services to its citizens, including public safety/police services, parks and recreation, public works, water and sewer, planning, building and zoning, code enforcement, and community development. The City is a very large consumer of goods and services, and the purchasing decisions of our employees and contractors can positively or negatively affect the environment. By including environmental considerations in our procurement information, along with our traditional concerns with price, performance, and availability, we will remain fiscally responsible while promoting practices that improve public health and safety, reduce pollution, and conserve natural resources, while still evaluating the Proposals on applicable legal and technical criteria. DEFINITIONS Capitalized words and phrases in this Solicitation are defined in this section and in the Agreement. In addition, the following terms, phrases, words, and their derivations shall have the meaning given herein: 'Invitation for Quotes ('ITQ')' means a simplified written solicitation for competitive price quotes, typically used for the acquisition of readily available goods or services of relatively low value. The Invitation for Quotes specifies the required commodity or service, quantity, delivery requirements, and any other relevant specifications, enabling vendors to provide quick and straightforward pricing. The Invitation for Quotes includes instructions prescribing all conditions for submitting quotes and shall be available for distribution to all prospective quoters at the same time. The Invitation for Quotes is used when the city requires a prompt acquisition of standard items or services, where price is the primary factor for selection, and detailed proposals are not necessary. ‘ Agreement, Contractor' means the “ SHIP Program Julio Bueno - Exterior Paint ” , including all of the exhibits and addendums/amendments thereto. No contract rights or expectations can be alleged, anticipated, expected, or claimed unless and until the Agreement is fully executed and a Work Order or similar document, as applicable, has been issued by the City. 'Award' means the acceptance of a Response, offer, similar response, or proposal by the City Council of the City of Hialeah. ' Successful Respondent, Contractor’ means the Respondent that receives an award of the Agreement from the City as a result of this Solicitation. ‘Respondent, Quoter, Proposer, Vendor, Contractor’ means the Person, company, business entity, or organization submitting a Response in reply to this Solicitation. When the terms “Respondent, Quoter, Proposer, Vendor, or Contractor” are used they shall have the same meaning in this solicitation. ' City' means, depending on the context, either (a) the geographic area contained within the municipal boundaries of the City of Hialeah, Florida, or (b) the government of the City, acting through Mayor and/or the City Council or its designees, as applicable. ‘Department’ means the City of Hialeah, FL, Community Development, Housing & Community Services Division and/or their successor City Department, office, agency, or division. 'Director' means the Directior of Housing & Community Services Department , or the Director's authorized designee. 'Solicitation' means this Invitation to Quote (ITQ). ‘Response, Bid, Submission’ means the response submitted in reply to this Solicitation. 'Respondent, Quoter, and Proposer' have similar meanings under this Solicitation insofar as that they refer to the person or entity submitting a response to the Solicitation. ‘Work,’ ‘Services,’ ‘Program,’ ‘Project,’ or ‘Engagement’ mean all matters and things that will require to be done by the Successful Respondent(s) in accordance with the scope of work and all terms and conditions of this Solicitation. ‘Project Manager’ means the individual in charge of serving as the day-to-day representative of the City for the project and contract administration. The City Project Manager will be designated by the Mayor or Director. ' Mayor' means the Chief Executive Officer of the City who manages the day-to-day operations of the City. The Mayor or his/her authorized designee will be authorized to make needed routine contractual decisions on behalf of the City. ' City Council' means the local legislative body of the City who would consider approving the Award, or not, as the case may be and would need to approve any resulting Agreement, and any Amendments to such Agreement. 'Purchasing Division Director’ means the Director of the City’s Purchasing Division who is authorized to respond to and address procurement/purchasing issues relative to this Solicitation and/or the award or other action of the City regarding this Solicitation. INVITATION This Solicitation is extended to any Person, company, and organization that can satisfy the requirements specified herein. The requirements presented in this Solicitation represent the City’s anticipated needs. PUBLIC ENTITY CRIME / DISCRIMINATORY VENDOR LIST The Public Entity Crime Affidavit Form, found in the RESPONSE Section, includes documentation that shall be executed by an individual authorized to bind the Respondent. Any Respondent, or any of its suppliers, subcontractors, or consultants who shall provide goods and services and/or materials that are intended to benefit the City, shall not be a convicted vendor or included on the discriminatory vendor list. If the Respondent or any affiliate of the Respondent has been convicted of a public entity crime or has been placed on the discriminatory vendor list, a period longer than 36 months must have passed since that person was placed on the convicted vendor or discriminatory vendor list. The Respondent further understands and accepts that any contract issued as a result of this Solicitation shall be either voidable or subject to immediate termination by the City. In the event there is any misrepresentation or lack of compliance with the mandates of Section 287.133 or Section 287.134, respectively, Florida Statutes. The City in the event in such termination, shall not incur any liability or cost to the Respondent for any goods, services, supplies, materials, and/or materials furnished. By submitting a response, the Respondent further affirms they are not in violation of Sections 287.1346 , 287.135, 287.1351, 287.136, 287.137 and 287.138, Fl Source: OpenGov https://procurement.opengov.com/portal/cityofhialeahfl/projects/302972 Canonical URL: https://govcontractfinder.com/contracts/ship-program-julio-bueno-exterior-paint-opengov-2176-project-302972