The Radford Army Ammunition Plant (RFAAP) NG3 Facility Construction is a multi-phased construction approach geared at addressing the four (4) core processes in NG manufacturing (Nitration, Solventless Slurry/Paste, Multi-base Pre-mix, and NC Dehydration). This project will focus on the Pre-Mix and Nitro Cellulose (NC) Dehydration (Dehy) facilities of the design for the new NG-3 facility. Nitrate Esters (NE), such as Nitroglycerin (NG), are critical additives in the production of double and triple-base propellants. RFAAP currently uses 15,000 lbs. of NG daily (3.5M lbs. annually) to support propellant production, which includes both solventless and solvent propellants. Currently, NG is produced on-site in the NG-2 Area by a single nitrator that is over 30 years old. The facility also has a
The Department of DEFENSE is conducting market research to identify potential sources for engineering services in FORT DRUM, NY. Responding to this notice helps ensure your company is considered for the eventual solicitation.
Looking for more opportunities?
Browse our full directory of government contracts