Tylers Beach Marina Pier Repairs-Phase 1 State and local opportunity open Isle of Wight County, VA 2027-7110-0153 Posted: 2026-11-23T18:29:04.774Z Response deadline: 2027-01-18T20:00:00.000Z Isle of Wight County is seeking Bids for Tylers Beach Marina Pier Repairs-Phase 1 . Bids shall be submitted through the Procurement Portal at https://procurement.opengov.com/portal/isleofwight-va no later than 3:00 pm on Monday, January 18, 2027 . During this phase the existing boat ramp, timber bulkhead, and dock will be replaced with a larger boat ramp, a steel sheet pile bulkhead, and floating attending docks in accordance with attached site plan approved 11-9-2026. The existing fixed docks along the East and West sides are to remain in place and be protected from damage throughout construction. SCOPE OF WORK All Work shall be completed in accordance with the 2018 edition of the Virginia Statewide Building Code. The contractor shall obtain all required permits. County will waive local permit fees. Services are being performed in accordance with Tylers Beach Marina Pier Repairs During this phase the existing boat ramp, timber bulkhead, and dock will be replaced with a larger boat ramp, a steel sheet pile bulkhead, and floating attending docks in accordance with attached site plan approved 11-9-2026. The existing fixed docks along the East and West sides are to remain in place and be protected from damage throughout construction. Minor electrical modifications will be needed during construction of the new bulkhead. ANNOUNCEMENT Monday, November 23, 2026 2027-7110-0153 Parks & Recreation 13036 Nike Park Road https://www.co.isle-ofwight.va.us/ Tylers Beach Marina Pier Repairs-Phase 1 Sealed Bids, subject to the conditions and instructions contained herein, will be received through the Procurement Portal by the Isle of Wight County, until 3:00 pm on Monday, January 18, 2027 (local prevailing time), for furnishing services described herein. SCOPE OF WORK: The County of Isle of Wight, Virginia, is soliciting sealed bids from qualified and experienced marine construction contractors for the Tylers Beach Marina Pier Repairs-Phase 1 project located at 15074 Tylers Beach Road, Smithfield, Va 23430. During this phase the existing boat ramp, timber bulkhead, and dock will be replaced with a larger boat ramp, a steel sheet pile bulkhead, and floating attending docks. The existing fixed docks along the East and West sides are to remain in place and be protected from damage throughout construction. Minor electrical modifications will be needed during construction of the new bulkhead. Bid Due : Monday, January 18, 2027 , 3:00 pm Bid Opening: Monday, January 18, 2027 , 3:00pm Contract Officer: Deyonne Ndango , Purchasing Agent , dndango@isleofwightus.net The Procurement Contract Officer, Deyonne Ndango , is the sole contact for Isle of Wight County with respect to this IFB. All questions and/or comments should be submitted through the Procurement Portal. The respondents to this IFB shall not contact, either directly or indirectly, any other employee or agent of the County regarding this IFB. Any such unauthorized contact may disqualify the offeror from procurement. Release Project Date: November 23, 2026 Pre-Bid Meeting (Mandatory): December 7, 2026, 2:00pm Tylers Beach Boat Ramp, 15074 Tylers Beach Rd., Smithfield, Va 23430 Question Submission Deadline: January 4, 2027, 3:00pm Bid Submission Deadline: January 18, 2027, 3:00pm INVITATION FOR BID BID DOCUMENTS Bid Documents to include Invitation to Bid and pertinent attachments, specifications and addendums, Bid Responses, and Bid Tabulations, and award notices, may be obtained on the Isle of Wight Procurement Portal at https://procurement.opengov.com/portal/isleofwight-va . QUESTIONS Offerors are encouraged to carefully examine the IFB for discrepancies, errors, omissions or ambiguities. Questions concerning this project must be submitted through the Procurement Portal and must be received no later than 3:00 pm , Monday, January 4, 2027 . BID OPENING Bids received by the due date shall be unsealed automatically at NO VALUE on Monday, January 18, 2027 . Tabulations of all opened bids will be posted through the Procurement Portal as soon thereafter as possible. ACCESSIBILITY IF YOU NEED ANY REASONABLE ACCOMMODATION FOR ANY TYPE OF DISABILITY IN ORDER TO PARTICIPATE IN THIS PROCUREMENT, PLEASE CONTACT THIS DIVISION AS SOON AS POSSIBLE. BID SUBMITTALS Bids must be submitted to the Isle of County Department of Budget & Finance through the Procurement Portal at https://procurement.opengov.com/portal/isleofwight-va . Isle of Wight County will not be responsible for any bids that are not able to be submitted, for any reason, to the County by/on the closing date and time listed. Bids received by email, telephone, telegraph, facsimile, or any other means of delivery shall not be accepted. Bids will be received on or before the date and the hour and at the place stipulated in the Invitation to Bid as may be modified by subsequent Addenda. Late bids will NOT be accepted. The entire bid must be submitted and signed by an authorized representative as requested through the Procurement Portal. Failure to comply with this instruction may result in the bid being deemed non-responsive. Bidders should carefully examine the specifications and fully inform themselves to all conditions and matters that could any way affect the cost thereof. Should a bidder find discrepancies in or omissions from the specifications or Invitation to Bid, or should be in doubt as to their meanings, he should submit for clarification through the Question and Answer section of the Project Portal. The right is reserved to revise or amend these specifications prior to the date set for receipt of bids as may be required by the County. That date may be delayed if deemed necessary by the County. Any revisions and/or amendments will be in the form of an addendum to this document. The right is reserved to accept or reject any or all bids in whole or in part and to waive any informalities in the IFB, and to enter into any contract deemed to be in the best interest of the County. Bidder has examined the Bid Documents including the Addenda. Bidder has made such independent investigations as Bidder deems necessary to fully inform himself as to the conditions affecting cost and progress of performance of the Work. PAYMENT TERMS Terms of payment on work performed with an accurate invoice shall be Net 30 days. A 5% retainage is required for construction projects. PRICING - PAYMENTS Pay Items prices shall include the furnishing of labor, superintendence, material, tools, equipment, incidentals and other ancillary items called for in the Contract Documents. The prices in the tabulation on the Bid Form are to be used to determine an estimate of cost for each project. Quantities shown are intended to provide a reasonable pricing for work and can vary. If progressive payments for overages is required there will be a 5% retainage withheld until the final payment for each project is made. In emergency situations, the overtime costs increases shall be negotiated between the Contractor and the County. PRE-BID MEETING A Mandatory Pre-Bid Meeting will be held at 2:00 pm on Monday, December 7, 2026 at Tylers Beach Boat Ramp, 15074 Tylers Beach Rd., Smithfield, Va 23430 . All work will occur on public property and the work area is available for independent access. The Bidder is required to be familiar with the site conditions prior to submitting a bid. WORK DAY Daily work may begin at 7:00 AM with work areas secured by 7:00 PM unless otherwise requested and approved by the County in writing. PROJECT SCHEDULE The County requires all work to be substantially complete within 196 days of notice to proceed. Refer to Bid Documents for Contract Time reference. Final completion shall be 30 days after substantial completion. BID FORM IFB # 2027-7110-0153 Tylers Beach Marina Pier Repairs-Phase 1 Isle of Wight County, VA In compliance with and subject to your Invitation for Bids and the documents therein specified, all of which are incorporated herein by reference, the bidder proposes to furnish all labor, equipment and materials and perform all work necessary for construction of this project, in accordance with the Bid Documents entitled ‘ Tylers Beach Marina Pier Repairs-Phase 1 ' dated, Monday, November 23, 2026 for the consideration of the following amount(s): REFERENCES Bidders are required to provide a minimum of three references, through the VENDOR QUESTIONNAIRE. VENDOR QUESTIONNAIRE GENERAL CONDITIONS DEFINITION OF TERMS The "Contract Documents" shall consist of invitation to bid, instructions to bidders, bid contract agreement, performance bond, payment bond, contractor's certificate of insurance and endorsements, general conditions, supplementary conditions, specification sections, construction details, addenda, the drawings, notice of award, notice to proceed, including all modifications thereto incorporated in any of the documents before and after execution of the agreement. The word "Owner" is used to designate the duly constituted government of Isle of Wight County, Virginia, acting through the properly authorized representatives. The word "Engineer" shall mean the engineer designated by the owner, whether acting directly or through properly authorized agents, inspectors or representatives of the engineer, acting within the scope of duties entrusted to them. In the event the owner should not require the services of the engineer for contract administration or inspections, then the powers, duties, and responsibilities conferred herein to the engineer shall be construed to be those of the owner. The word "Bidder" shall be used to designate any party or parties submitting in proper form a bid to perform the work hereinafter specified. The successful bidder, selected by the owner to perform the work specified, will thereafter be known as the contractor. The word "Contractor" is used to designate the party or parties contracting to perform the work or his or their heirs, executors, administrators, successors, or assigns. The word "Superintendent" shall be used to designate the person appointed by the contractor, acting under his instructions and in direct charge of the work for the contractor. The term "Subcontractor" shall mean any individual, firm or corporation having a direct contract, with the contractor or with any other subcontractor for performance of any part of the work. The term "Work" shall include labor, materials, equipment, transportation, supervision, or other facilities, duties, or incidentals necessary to complete the project in compliance with the terms of the contract documents. The word "Project" shall mean the entire construction to be performed as provided in the contract documents. "Project Area" shall mean the area where work is being performed for Isle of Wight County, Virginia. "Written Notice" shall be deemed to have been duly served if delivered in person to the individual or to a member of the firm or to an officer of the corporation for whom it is intended, or if delivered at or sent by registered mail to the last business address known to him who gives the notice. The words "As Directed," "As Required," "As Permitted," "As Allowed," or phrases of like effect or import as used herein shall mean that the direction, requirement, permission or allowance of the engineer or owner is intended, and similarly the words "Accepted," "Approved," "Reasonable," "Suitable," "Properly," "Satisfactory," or words of like effect or import, unless otherwise particularly specified here, shall mean acceptable, approved, reasonable, suitable, properly or satisfactory in the judgment of the engineer or owner. The word "Addendum" shall mean a modification of the contract documents issued in writing by the engineer or owner prior to the opening of the bids. The term "Field Order" shall mean a written order issued by the owner subsequent to the formal execution of the contract documents. Which orders minor changes in the work which are compatible with the design concept of the completed project as a functioning whole as indicated by the contract documents but which does not involve a change in contract price or the contract times. The term "Change Order" shall mean a modification of the contract requirements issued in writing by the owner subsequent to the formal execution of the contract documents which involves a change in contract price or the contract times. All time limits stated in the contract documents are of the essence of the contract. Unless specifically noted otherwise, all "Days" shall be construed to mean calendar days. The words "Substantial Completion" shall mean the work (or a specified portion thereof) has progressed to the point where, in the opinion of the engineer, it is sufficiently completed in accordance with the contract documents, so that the work can be utilized for the purposes for which it was intended. The term "Or Approved Equal" pertains to the use of materials currently accepted by the department of public utilities. Items not currently accepted must be submitted for review and approval prior to incorporation in the work. The term "Force Account" shall mean work not shown on the plans or required by the contract documents that is necessary for the completion of the contract, which shall be considered additional work and will be paid for in the manner set forth hereinafter. EXECUTION, CORRELATION, AND INTENT OF CONTRACT DOCUMENTS The contract documents shall be executed by the owner and the contractor in such numbers as required by the owner. The contract documents are complementary and what is called for by anyone shall be as binding as if called for by all. The intention of the documents is to include all labor and materials, equipment, and supplies necessary for the proper execution of the work. It is not intended, however, that materials or work not covered by or properly inferable from any heading, branch, class, or trade of the specifications shall be supplied unless distinctly so noted on the drawings. Materials or work described in words which so applied have a well-known technical or trade meaning shall be held to refer to such recognized standards. The designation "Architectural", "Structural", "Electrical", and the like, in the drawing titles are provided for convenience only, and are not intended to define the work to be done by any trades or subcontractors. CONTRACTOR'S UNDERSTANDING It is understood and agreed that the contractor has, by careful examination, satisfied himself as to the nature and location of the work, the conformation of the ground, the character, equipment and facilities needed preliminary to and during the prosecution of the work, the general and local conditions, and all other matters which can in any way affect the work under this contract. No verbal agreement or conversation with any officer, agent or employee of the owner, either before or after the execution of this contract, shall affect or modify any of the terms or obligations herein contained. The submission of a bid shall be prima facie evidence that the bidder thoroughly understands the drawings, terms of the specifications, and has made himself familiar with all federal and state laws, local laws, ordinances, and regulations which in any manner affect the work or its prosecution. DETAILED DRAWINGS AND INSTRUCTIONS The engineer shall furnish with reasonable promptness, additional instruction, by means of drawings or otherwise, necessary for the proper execution of the work. All such drawings and instructions shall be consistent with the contract documents. Where sizes are not marked plainly on the drawings, the size of corresponding parts may be followed, or the engineer will determine the sizes when dimensions are entirely omitted. The contractor shall verify all figures on the plans and will be responsible for the proper coordination of all dimensions as well as the different parts of the work. SHOP DRAWINGS The term "Shop Drawings," as used herein shall include fabrication, erection and setting drawings, manufacturers' standard drawings, schedules, descriptive literature, catalogs, brochures, performance and test data, wiring and control diagrams and all other descriptive data pertaining to the materials and equipment as required to demonstrate compliance with the contract requirements. The contractor shall submit for the approval of the owner all shop drawings required by the specifications or requested by the owner. All such submissions shall be made with such promptness as to cause no delay in this or any other contractor on the project, and to allow reasonable time for review. Shop drawings shall be submitted in such number of copies that three (3) copies may be retained by the owner. Each submission shall be accompanied by a letter of transmittal in duplicate, listing the contents of the submission and identifying each item by reference to specification section or drawing. All shop drawings shall be clearly labeled with the name of the project and other necessary information. Catalog plates and other similar material that cannot be so labeled conveniently, shall be bound in suitable covers bearing the identifying data. Shop drawings shall be accompanied by all required certifications and other such supporting material and shall be submitted in such sequence or in such groups that all related items may be reviewed together. When shop drawings cannot be reviewed because the submission is not complete, or because shop drawings on related items have not been received, then such shop drawings will be returned without action or will be held, and not reviewed, until the lacking material is received. Shop drawings shall have been checked by the contractor and coordinated with all other related or affected work before they are submitted for approval and shall bear the contractor's certification that he has checked and approved them as complying with the information given in the contract documents. Shop drawings submitted without such certification and coordination will be returned to the contractor without action and will not be considered a formal submission. If the shop drawings show variations from the drawings and specifications because of standard shop practice or other reasons, the contractor shall make specific mention of such variation in his letter of transmittal in order that, if acceptable, suitable action may be taken for proper adjustment; otherwise, the contractor will not be relieved of the responsibility for executing the work in accordance with the drawings and specifications even though such shop drawings have been approved. The owner shall pass upon the shop drawings with reasonable promptness. Reviewing and/or approval of shop drawings will be general, for conformance with the design concept of the project and compliance with the information given in the contract documents, and will not include quantities, detail dimensions, nor adjustments of dimensions to actual field conditions. Approval shall not be construed as permitting any departure from contract requirements, authorization of any increase in price nor as relieving the contractor of responsibility for any error in details, dimensions or otherwise that may exist. DISCREPANCIES Any discrepancies found between the plans and specifications and site conditions or any inconsistencies or ambiguities in the plans or specifications shall be immediately reported to the engineer, in writing, who shall promptly correct such inconsistencies or ambiguities in writing. Work done by the contractor after his discovery of such discrepancies, inconsistencies or ambiguities shall be done at the contractor's risk. If the contractor, in the course of the work, finds any discrepancy between the drawings and the physical conditions of the locality, or any errors, or omissions in drawings or in the layout as given by points and instructions, it shall be his duty to immediately inform the engineer and the owner in writing, and the engineer and owner shall promptly Source: OpenGov https://procurement.opengov.com/portal/isleofwight-va/projects/325490 Canonical URL: https://govcontractfinder.com/contracts/tylers-beach-marina-pier-repairs-phase-1-opengov-3537-project-325490