Type II Cold Recycling of Existing Bituminous Pavement State and local opportunity open County of Wayne, NY BB27030 Posted: 2026-11-18T20:28:42.111Z Response deadline: 2027-01-07T18:00:00.000Z The County of Wayne, NY is soliciting sealed responses for Type II Cold Recycling of Existing Bituminous Pavement . Responses are due , on or before 1:00 pm prevailing time on Thursday, January 7, 2027 . Late responses will not be accepted. Cold In-Place Recycling Asphalt Concrete 1” to 3” Depth Each Additional 1” Depth 1” to 3” Depth Each Additional 1” Depth Bituminous Materials HFMS-2 Emulsion Project Details / Scope of Work Description This specification covers the requirements for cold recycling asphalt concrete. This work shall consist of coring the existing pavement, preparing a mix design and recycling the existing asphalt concrete pavement. The recycling shall be a continuous process of milling the existing pavement, remixing with bituminous material (unmodified or modified) and aggregate, reshaping, and compacting the asphalt mixture. Pavement locations that are milled shall have material replaced on the same day. All work under this item shall be in accordance with these specifications and in reasonably close conformity with the limits established by the County. Materials Bituminous Material: Liquid bituminous material shall be obtained from a NYS Department of Transportation approved facility. All bituminous material proposed for use on County projects shall be approved by the Highway Superintendent. The Highway Superintendent shall have a representative from the County take one sample from each tank truck of bituminous material arriving on the project in accordance with Materials Method – NY 8.2. The sample shall be kept at the County for up to 3 years and will be tested if deemed necessary. Additives: Additives may be used to improve the quality of the resulting recycled pavement. Additives may be combined with the bituminous material prior to construction or may be added to the mix during construction. The proportion and amounts of additive shall be determined by the Contractor and approved by the Highway Superintendent. Aggregates: Additional aggregates for cold recycling of pavements shall be crushed stone or crushed gravel conforming to the requirements of Section 703-02, Coarse Aggregate, of the Standard Specifications. The gradation and source of the aggregates shall be specified by the Contractor and included in the proposed mix design. Reclaimed Material: Asphalt pavement and any milled material which has been removed and/or processed from the pavement will be referred to as reclaimed material. The reclaimed material shall pass the 50 mm sieve size. Design Guidelines: The recycled mixture consists of reclaimed material, additional aggregate, liquid bituminous material, additives and water. The minimum design liquid bituminous material content is 3% for asphalt emulsions, and 2% for performance-graded binders. The liquid bituminous material is calculated as a percentage of the dry mass of millings: [mass of liquid bituminous material/mass of millings] X 100 = % of liquid bituminous material Recycled mixtures may be designed with or without additional aggregate, depending on the existing pavement’s gradation. When additional aggregate is used, the minimum content is 5.0% and the maximum content is 20.0%, regardless of the recycled mixture’s design gradation. The percentage of additional aggregate is calculated as a percentage of the dry mass of millings: [mass of additional aggregate/mass of millings] X 100 = % additional aggregate Design the recycled mixture to conform to the following gradation. Sieve (mm) Percent Passing Minimum Maximum 37.5 100 - 25.0 95 100 12.5 70 85 6.3 48 68 3.2 32 54 0.850 15 30 0.425 8 22 0.180 4 14 0.075 2 8 Equipment Use equipment capable of: Milling the existing pavement to the appropriate depth Processing the reclaimed material to pass a 25 mm sieve Mixing the reclaimed material with bituminous material Paving the reclaimed material to the correct grade Calibration: Calibrate the mixing equipment before work begins, in accordance with established calibration procedures detailed in the Procedural Directives of the Director, NYS Materials Bureau. Submit the calibration results to the Highway Superintendent for approval at least 7 days prior to the start of work. The first calibration of each calendar year must be witnessed by NYS DOT personnel. Submit subsequent calibrations with written certification that proper procedures were followed and that all measurements and calculations are accurate. If the results submitted in subsequent calibrations differ by more than 5.0% from the first calibration of the season, the equipment must be calibrated in the presence of Department personnel. Calibration approval is valid for 90 days from the calibration date. Provide a copy of the calibration approval letter to the Highway Superintendent before the start of work. No cold recycling will be allowed under this contract until the calibration has been completed and approved. No payment will be made for material recycled by equipment without a valid calibration. Construction Details Weather Limitations: This work will not be permitted when the existing pavement contains frost or when the air or surface temperature is below 44.6º F or expected to drop below 44.6º F within 24 hours. No material shall be placed from the last Saturday in September to May 1. Testing: Prior to starting recycled operations, test two aggregate samples to verify gradation. Supply the test results to the Highway Superintendent before the start of work. Once continuous production has been achieved, test four samples of the recycled mixture for gradation and total asphalt content. Submit the test results to the Highway Superintendent before the end of the next workday. For each subsequent day of production, take at least one sample of the recycled mixture from each half mile, or fraction thereof, of pavement recycled. Test each sample for gradation and total asphalt content. Submit the test results from the mix samples taken from each half mile of pavement within two workdays. Make adjustments to the mix proportions or additional aggregate gradation based on the test results to comply with the approved mix design and construct a stable pavement layer. If it is necessary to bring a second recycling train to the project, four samples should again be taken and tested at the frequencies detailed above. Spreading: The mixture shall be deposited in a windrow or directly into an approved bituminous paver equipped with a 9.1 meter moving reference and mechanically spread in a uniform layer to produce the specified thickness and surface tolerance after compaction. Excessive amounts of non-coated reclaimed material which spill onto the milled surface shall be removed, as ordered by the County prior to placing the mixture. Bituminous Application Rate: The Contractor shall be allowed to adjust the application rate of the bituminous material from the design value. The bituminous application rate may be reduced below the minimum design value. The Contractor shall inform the Highway Superintendent of any changes to the bituminous application rate. Compaction: All compaction shall be the Contractor's responsibility. After the bituminous mixture has been spread, struck off, and surface irregularities adjusted, it shall be thoroughly and uniformly compacted by rolling. The surface shall be rolled when the mixture is in the proper condition and when the rolling does not cause undue displacement, cracking, or shoving. All courses shall be initially rolled with the roller traveling parallel to the centerline of the pavement beginning at each edge and working toward the center. Banked curves shall be rolled starting at the low side edge and working toward the super-elevated edge. The roller drive roll or wheel shall be nearest the paver. A pneumatic tire roller with a minimum ground contact pressure (GCP) of 550 kPa will be supplied by the Contractor for compacting the cold recycled mix. The Contractor may choose to use vibratory compaction equipment for initial or intermediate rolling. The vibratory roller shall appear on the current Approved List. (Bituminous Concrete Vibratory Compaction Equipment) Initial and intermediate rollers shall operate at a uniform speed not to exceed 2.5 miles per hour. All turning of the compaction equipment shall be completed on material which has a minimum of one roller pass. The Contractor shall note that if vibratory compaction equipment is used, they assume full responsibility for the cost of repairing all damages which may occur to highway components and adjacent property. The pavement course shall be finish-rolled with a steel-wheel tandem roller having a minimum weight of 8 tons. This finish roller shall make a minimum of two passes. Dual vibrating drum rollers that meet the requirements of a tandem roller and operate in static mode may be used as the finish roller. This vibratory roller may be used as the initial or intermediate roller and the finish roller. The rolling sequence and number of passes to achieve the desired compaction shall be approved by the Engineer. It may be necessary to complete or finish roll the material on a subsequent day at no additional expense to the State. When the compaction procedure used by the Contractor fails to produce results acceptable to the County, the procedure shall be adjusted to obtain the desired results. Material that cannot be properly and adequately compacted to a stable condition shall be removed and replaced, as ordered by the County, at the Contractor’s expense. Along form, curbs, headers, walls, and other areas not accessible to the rollers, the mixture shall be thoroughly compacted with mechanical tampers as directed by the County. On depressed areas, a trench roller or a small vibratory roller approved by the County may be used. Any displacement occurring as a result of reversing the direction of the roller, or from other causes, shall be corrected at once by the use of rakes and addition of fresh mixture as required. Care shall be exercised in rolling to avoid displacing the line and grade of the edges of the bituminous mixture. To prevent adhesion of the mixture to the rollers, the wheels shall be kept properly moistened with water mixed with small quantities of detergent or other approved material, but in no case shall a solvent having an adverse effect upon the bituminous pavement be used. Longitudinal Joints: Plan the recycling operation to ensure that the longitudinal joints in the recycled course will correspond with the edges of the proposed traffic lanes. Other joint arrangements require the County’s approval. Paving operations shall match multiple lanes at the end of the workday to minimize exposure of longitudinal joints to traffic overnight. If any length of longitudinal joint is exposed at the end of the working day, construct the joint using a pneumatic tire roller to form the joint into a wedge shape and provide a smooth transition for traffic. Construct the wedge of recycled material at a Asphalt Price Adjustments Asphalt Price Adjustments will be based on the November 1, 2026 average F.O.B. terminal price per ton of unmodified PG 64-22 binder without anti-stripping agent (base average F.O.B. terminal price). The New York State Department of Transportation will determine the new monthly average terminal price based on prices from pre-approved primary sources of performance-graded binder, in accordance with the New York State Department of Transportation Standard Specification. The November 1, 2026 average is $803.00 per English Ton. Note: The same grade of asphalt cement used to establish the base average F.O.B. terminal price shall be used to establish the new average F.O.B. terminal price. In the event that one or more of the New York State Department of Transportation pre-approved sources discontinue posting a price for asphalt cement, the base average F.O.B. terminal price shall not be recalculated. The new average F.O.B. terminal price will be determined based on the above F.O.B. terminal prices posted on the 20th of each month, hereafter known as the “Adjustment Date”, during the contract period starting with February 20th, 2027. However, price adjustments, in accordance with the formula below, will be effective for deliveries made on and after the first of the month (i.e., March 1, 2027) following the adjustment date. The unit prices of bituminous materials purchased from any award based on the specification will be subject to adjustment based on the following formula: Price Adjustment Per Gallon = New Monthly Average FOB Terminal Price - Base Average Terminal Price X Total Allowable Petroleum 235 NEW MONTHLY AVERAGE F.O.B. TERMINAL PRICE: The average F.O.B. terminal price for unmodified PG 64-22 binder without anti-stopping agent as determined by the New York State Department of Transportation Standard Specifications. BASE AVERAGE F.O.B. TERMINAL PRICE: The New York State Department of Transportation determined the average F.O.B. terminal price of unmodified PG 64-22 binder without anti-stopping agent as of November 1, 2026. TOTAL ALLOWABLE PETROLEUM: The percentage of total allowable petroleum for each item is as follows: Material Designation Grade Asphalt % Petroleum Allowance Total Allowable Petroleum % 702-0700 18-60 100 0.2 100.20 702-3001 RS-1 55 1.7 56.70 702-3002 RS-1h 55 1.7 56.70 702-3101 RS-2 63 2.7 65.70 702-3102 HFRS-2 63 2.7 65.70 702-3201 MS-2 65 8.2 73.20 702-3301 HFMS-2 65 8.2 73.2 702-3401 HFMS-2h 65 2.7 67.70 702-3402 HFMS-2s 65 8.2 73.20 702-3501 SS-1 57 0.2 57.20 702.3501 SS-1 (Cold Recycle) 65 0.2 65.20 702-3601 SS-1h 57 0.2 57.20 702.3601 SS-1h (Cold Recycling) 65 0.2 65.20 702-3701 RS-2p 63 2.7 65.70 702-3801 HFRS-2p 63 2.7 65.70 702-4001 CRS-1 60 2.7 62.70 702-4002 CRS-1h 60 2.7 62.70 702-4101 CRS-2 65 2.7 67.70 702-4201 CMS-2 65 10.2 75.20 702-4301 CMS-2h 65 10.2 75.20 702-4401 CSS-1 57 0.2 57.20 702.4401 CSS-1 (Cold Recycling) 65 0.2 65.20 702-4501 CSS-1h 57 0.2 57.20 702.4501 CSS-1h (Cold Recycling) 65 0.2 65.20 702-4601 CQS-1h 62 0.2 62.20 702-4701 CRS-1p 60 2.7 62.70 702-4702 CRS-2p 65 2.7 67.70 702-4801 CQS-1p 62 0.2 62.20 702-90 Diluted Tack Coat 40 0.2 40.20 Price adjustments will not be allowed for materials that do not have an asphalt cement base. Example: Item 702-3301 HFMS-2 $600 – $593 x 0.732 = +0.022 per gal Base Avg. Price = $593.00 235 New Avg. Price = $600.00 Total Allowable Petroleum = 73.2% The positive price adjustment number shall be added to the original per-gallon Bid Price. The negative price adjustment number shall be subtracted from the original per-gallon Bid Price. Work performed after the expiration of the contract, where no extension has been granted, resultant from purchase orders placed prior to expiration of the contract will receive the Asphalt Price Adjustments applicable in effect during the last month of the contract. Asphalt Price Adjustments for any contracts that are extended will be based on the new average for the month in which the work is done, applying the same base established for that contract. Asphalt Price Adjustments allowed by this contract shall be calculated and applied to the original prices. There will not be Asphalt Price Adjustments unless the change amounts to more than $0.010 per gallon from the original price. In these instances, prices will revert back to the original prices. All Asphalt Price Adjustments will be computed to three decimal places. Should these provisions result in a price structure which becomes unworkable, detrimental or injurious to the State or in prices which are not truly reflective of market conditions or which are deemed by the Commissioner to be unreasonable or excessive, and no adjustment in price is mutually agreeable, the Commissioner reserves the sole right upon ten days' written notice mailed to the contractor to terminate any contract resulting from this bid opening. All Asphalt Price Adjustments shall be published by the State and issued to all contract holders whose responsibility will be to attach the appropriate State notification (based on when the work was performed) to the payment invoice submitted to the agency. References are made herein to New York State Department of Transportation, Standard Specifications,Construction and Materials, dated May 1, 2026, and Engineering Instruction 07-020. A copy may be obtained through the Department’s publication unit. Call 518-457-2124 for information. For information on becoming an approved facility or arranging inspection of materials or equipment when required, contact the Materials Bureau of the Department of Transportation at 518-457-3240. Method of Measurement/Basis of Payment Cold In-Place Recycling Asphalt Concrete Measurement and Payment will be made at the unit price per square yard of pavement surface recycled in accordance with the specifications and contract documents. The unit price shall include the cost of all labor, materials, equipment, and incidentals necessary to complete the work, except that the Liquid Bituminous Material will be paid for under its own proper pay item. The County will purchase and deliver aggregate, and it will not be a factor in payment. Bituminous Material. Measurement and Payment will be made at the unit price per gallon applied. Gallons of bituminous will be measured at 60°F. The unit price shall include the cost of furnishing all labor, materials, and equipment necessary to incorporate the bituminous materials into the work. Notice Notice to Contractors (Physical Responses Only) Notice is hereby given that the County of Wayne is conducting a Request for Bids for Type II Cold Recycling of Existing Bituminous Pavement Sealed responses may be submitted physically or by mail in a sealed envelope clearly identified and filed with the Superintendent of Public Works, 7227 Route 31, Lyons, New York 14489, 26 Church Street, Lyons, New York 14489, on or before 1:00 pm prevailing time on Thursday, January 7, 2027 An electronic copy of proposal forms, specifications, and plans can be obtained from the County’s eProcurement Portal: https://procurement.opengov.com/portal/co-wayne-ny-us or by requesting them directly from the Purchasing Department Office located at 16 William Street, Lyons, NY by email request to purchasing@co.wayne.ny.us (Telephone: 315-946-7675) The County of Wayne (hereinafter “County”) shall not be held responsible for the completeness or accuracy of any proposal documents received by a contractor that was not directly issued to that contractor by the Purchasing Department. Any contractor submitting a proposal based on incomplete or inaccurate information resulting from documentation received from any third party shall not have cause for relief from award or completion of a contract in accordance with the official documents on file with the Clerk of the Board of Supervisors. It is HIGHLY suggested that all contractors interested in participating in this proposal contact the Purchasing Department directly at the above address or telephone number to ensure they have received the most accurate and up-to-date material concerning this contract. The County does not offer or supply anyone the list of people who have obtained a copy of these proposal specifications or cost estimates for the project prior to the opening of the proposals. NO EXCEPTIONS ARE MADE TO THIS POLICY. **the County Reserves the right to reject any or all responses** Submission Method / Receipt of Proposals Physical/ Hardcopy Submission Sealed bids will be received by the Superintendent of Public Works at 7227 State Route 31, Lyons, New York 14489 until the date and time listed in the advertisement, and at that time all bids will be publicly opened and read aloud. Any bid received after the specified time will be returned to the Bidder unopened. Bidders shall indicate on the outside of their sealed bid the following information: Type II Cold Recycling of Exist Source: OpenGov https://procurement.opengov.com/portal/co-wayne-ny-us/projects/327100 Canonical URL: https://govcontractfinder.com/contracts/type-ii-cold-recycling-of-existing-bituminous-pavement-opengov-1899614489-project-327100