Install New Backup Kohler/Rehlko 500REOZJC Generator System The U.S. Fish and Wildlife Service has a requirement for installation of a Government-furnished 500kW Kohler Diesel Generator, Model 500REOZJC, with an EPA Tier 2 engine, steel sound-attenuated enclosure, and Kohler APM603 controller to existing infrastructure at the Jones Hole National Fish Hatchery located in Vernal, Utah. The work described in the Statement of Work includes site preparation, electrical installation, testing, startup, and training, etc. All work shall be accomplished in accordance with the provisions of the FWS solicitation and attached documents. Per the requirements of FAR 36.204, the project magnitude is estimated to be between $25,000 and $100,000. The acquisition is a Total Small Business set-aside. All res
INTERIOR, DEPARTMENT OF THE is actively seeking qualified contractors for electrical contractors and other wiring installation contractors with a set-aside for Small Business businesses in Falls Church, VA. This set-aside designation means eligible businesses face reduced competition from larger firms.
Looking for more opportunities?
Browse our full directory of government contracts