Victory Park Community Center office furniture State and local opportunity open City of Pasadena 2026-Informal-0569 Posted: 2026-11-17T22:31:31.401Z Response deadline: 2026-12-02T22:00:00.000Z The City is seeking quotes to furnish and install office furniture and a reception partition at Victory Park Community Center. The furniture and installation requirements are described in Sections 3.1 through 3.3. Furnish and install the following HON furniture items: (see attachment for detailed specification) • Four (4) workstations sized 5'-0" x 6'-0" x 49" H , • One (1) “L‑shape” Divider Partition with Door & Glass. (see attached sketch and detailed specification) • Four (4) LAVO, Task Chair, black, or City-approved equal, (see attached sketch and detailed specification) Include all applicable furniture, delivery, installation, and tax in the proposal. Carpet replacement will be performed separately and coordinated with furniture removal and installation. Workstations (see specification ad drawing for details) Task Chair L" Shape Full Ht. Partition with Door Specification The City is seeking quotes to furnish and install office furniture and a reception partition at Victory Park Community Center. The furniture and installation requirements are described in Sections 3.1 through 3.3. Scope of Work: The City of Pasadena, California seeks to procure high-quality workstations, and ergonomic task seating to enhance the comfort, productivity, functionality, and aesthetic appeal of its office environments. The selected vendor shall provide workstation systems that incorporate sit-stand functionality and all required storage components to support employee wellness, efficiency, and productivity. In addition, the vendor shall furnish ergonomic task chairs designed to meet the functional, comfort, and health-related needs of employees while promoting proper posture and long-term workplace well-being. This procurement supports the City's commitment to providing a modern, efficient, and employee-focused work environment. The proposed furniture solutions shall accommodate current operational needs while offering flexibility to support future workplace requirements. These upgrades are intended to improve the overall user experience, maximize workspace effectiveness, and align with industry best practices for contemporary office design and ergonomic standards DETAILED SPECIFICATIONS: Workstations (See attachment) Task Chairs (See Section 3.3) Service Requirements Consultation and Planning: The vendor must provide consultation services to assist in selecting the appropriate seating solutions based on the City of Pasadena's specific needs and office layout. Customization: The vendor should offer customization options for upholstery colors and materials to match the existing office decor. Assembly and Installation: The vendor must provide on-site assembly and installation services for all seating products. This includes the removal and disposal of all packaging materials. Maintenance and Support: The vendor must provide ongoing maintenance and support services, including repair and replacement of defective parts within the warranty period. By adhering to the above scope of work, the City of Pasadena aims to ensure the procurement of high-quality workspace and conference room seating that meets the ergonomic, aesthetic, and functional needs of our office environments. Ordering, Delivery and Installation The contractor shall complete delivery and installation at Victory Park Community Center, 2575 Paloma Street, Pasadena, CA 91107, within eight calendar weeks after issuance of the purchase order. Coordinate delivery and installation with the City’s project manager. Deliveries shall occur between 8:00 a.m. and 4:30 p.m. Monday through Thursday and on scheduled City working Fridays, excluding City holidays, unless the City authorizes a different window in writing. ORDERING: For all line items (1 to 3) listed below, Refer to attached document for the detailed Specifications Four (4) workstations sized 5'-0" x 6'-0" x 49" H , One (1) “L‑shape” Divider Partition with Door & Glass. (see attached sketch and detailed specification) Four (4) LAVO, Task Chair, black, or City-approved equal, (see attached sketch and detailed specification) Include all applicable furniture, delivery, installation, and tax in the proposal. Carpet replacement will be performed separately and coordinated with furniture removal and installation. TASK CHAIR QUANTITY: 4 COLOR: Black Workspace Seating (Task Chairs) Ergonomic Design: Key features include: Chair shall be designed for intensive daily use in a professional office environment. Chair shall incorporate advanced ergonomic features that support healthy seated posture and user comfort. Chair shall be suitable for users of varying body types and sizes. Chair shall be manufactured by an established office furniture manufacturer with demonstrated experience in ergonomic seating. Key Ergonomic and Design Features: The chair shall include, at a minimum: Mechanism: Floating synchro mechanism with responsive mesh support. Tilt & Recline: Quick-access tilt tension and 4-position tilt lock (0°, 7°, 13°, and 18° recline). Lumbar Support: Adjustable lumbar support paired with a flexing upper frame (FlexBack). Seat Design: Waterfall-edge seat with quick-access depth adjustment. Materials: Ultra-breathable, bleach-cleanable mesh in black. Frame & Base Options: Black, white, or gray frame finishes, 5-star nylon or polished aluminum base, and various arm configurations. Key Dimensions & Mesh-Specific Specs : The chair shall include, at a minimum: Breathability: Features a continuous mesh suspension on both the seat and back, allowing for passive airflow to keep you cool during long hours. Seat Width: 19.75". Seat Height Range: 17" to 20.5". Weight Profile: 38 lbs. Maintenance: Bleach-cleanable mesh. Seat and Back Construction Seat and back shall provide pressure-distribution support to minimize concentrated pressure points. Suspension-style seat and back construction shall be preferred over traditional foam construction. Materials shall promote airflow and thermal comfort during extended periods of use. Seating surface shall be durable, flexible, and resistant to sagging or deformation under normal use conditions. Base and Mobility Five-star base construction. Dual-wheel casters suitable for carpet and hard-surface flooring. Smooth rolling performance with stability during movement. Swivel capability with a full 360-degree rotation Durability and Weight capacity: Chair components shall be designed for continuous-use environments. All materials shall be commercial-grade and suitable for high-use government office applications. Chair shall support a minimum user weight capacity of 300 pounds. Environmental and Sustainability Requirements Manufacturer shall provide documentation regarding sustainability initiatives and recycled-content materials, where applicable. Products should be low-emitting and suitable for indoor office environments Warranty: Minimum warranty period shall be twelve (12) years. Warranty shall cover materials, workmanship, and moving components under normal office use. Compliance: Chairs must meet or exceed ANSI/BIFMA X5.1-2017 standards for office seating. ORDERING, DELIVERY AND INSTALLATION ORDERING: Vendor must provide a contact person that can be reached by phone and email during Normal Business Hours that can accept any orders placed by the Contract Administrator. All items listed shall be delivered to the City. Delivery shall be no later than Eight Calendar Weeks after orders are placed, and during Normal Business Hours . DELIVERY AND INSTALLATION REQUIREMENTS: Delivery Schedule: The contractor shall complete delivery and installation within eight calendar weeks after issuance of the purchase order. Coordinate the delivery and installation dates with the City’s project manager. Deliveries shall occur between 8:00 a.m. and 4:30 p.m. Monday through Thursday and on scheduled City working Fridays, excluding City holidays, unless the City authorizes a different window in writing. Delivery Location: All products must be delivered to the specified City of Pasadena office locations as detailed in the purchase order. Packaging: All products must be securely packaged to prevent damage during transit. Packaging materials should be environmentally friendly and recyclable where possible. Inspection and Acceptance: Upon delivery, the City of Pasadena will inspect all products to ensure they meet the specified requirements. Any damaged or non-compliant products must be replaced or repaired by the vendor at no additional cost. DELIVERY LOCATION(S) INCLUDE: 2575 PALOMA STREET, PASADENA, CA INSTALLATION SCOPE: Assembly and installation of all furniture and accessories. Removal and disposal of all existing furniture. Attachment of the furniture power whip. (Hardwire connections to the building's electrical grid not in cotract). Data cabling will be handled by the City's technology vendor. Furniture delivery and installation shall be coordinated with the construction schedule and occupancy requirements. Normal Business Hours are Monday through Thursday every other Friday 8:00 a.m. until 4:30 p.m. unless specifically requested by the contract admininstrator, no deliveries shall take place on Saturday, Sunday, or holidays recognized by the City of Pasadena. See the schedule for closed Fridays: https://www.cityofpasadena.net/planning/scheduled-city-closure-9-80-plan/. SHIPPING, STORAGE, AND HANDLING The Vendor shall assume all responsibility for the safe delivery of THE MATERIALS shipped to its destination. The materials shall be protectively packaged for shipment to mitigate the risks to handling such as impacts, atmospheric conditions such as excessive heat and moisture control, and any other shipping risks. Introduction Summary The City is seeking quotes or proposals for Victory Park Community Center office furniture as outlined in this SOLICITATION. The Contractor may need to meet other certain minimum qualifications to propose on this specification. 2026-Informal-0569 Background Contact Information Deadline for Questions The deadline to submit questions related to this solicitation is Tuesday, November 24, 2026 , prior to 2:00 pm . Questions regarding this solicitation should be submitted directly through the City's eProcurement Portal Q&A function. Do not contact any City employee or official regarding this solicitation. Any questions submitted after the date and time specified may not be considered. Vendor Registration Instructions & Customer Service information: Click here to register on the City's eProcurement Portal . If you are already registered and need help logging in or retrieving your user information use the blue chat bubble on the lower right hand corner of the screen. Additional instructions are included in this solicitation (See section named "Instructions for Registering onto the City's eProcurement Portal. Customer Service For assistance with e-bidding or uploading documents: Contact Open Gov via the blue chat bubble Monday through Friday 5am - 5pm PST, except statutory holidays Timeline Instructions NOTICE REGARDING DISCLOSURE OF CONTENTS OF DOCUMENT All responses to this solicitation accepted by the City of Pasadena (City) shall become the exclusive property of the City. At such time as the City recommends a contractor, and such recommendation, with any recommended contract, all proposals accepted by the City shall become a matter of public record and shall be regarded as public, with the exception of those elements of each proposal which are defined by the contractor as business or trade secrets and plainly marked as "Trade Secret", "Confidential" or "Proprietary". Each element of a proposal which a contractor desires not to be considered a public record must be clearly marked as set forth above, and any blanket statement (i.e. regarding entire pages, documents or other non-specific designations) shall not be sufficient and shall not bind the City in any way whatsoever. If disclosure is required or permitted under the California Public Records Act or otherwise by law, the City shall not in any way be liable or responsible for the disclosure of any such records or part thereof. TERMS AND CONDITIONS OF PURCHASE ORDER CONTRACT The contract begins upon issuance of the City’s purchase order. Complete delivery and installation within the period stated in Section 3.2. TERMS AND CONDITIONS OF PURCHASE ORDER CONTRACT https://www.cityofpasadena.net/wp-content/uploads/sites/27/Terms-Conditions-of-Purchase-Order.pdf PRICE ADJUSTMENTS Unit prices shall remain firm for the contract term. Evaluation of Bid Bids will be evaluated based on the lowest Grand Total Price submitted in the Bidders' Proposal. The contract award will be made from among responsive and responsible bidders. In case of a discrepancy between the unit prices and item total, the unit price shall govern. In the event of a discrepancy between the item totals and the grand total price the item totals shall prevail. The prices will be subject to adjustment by the City on that basis in the event of discrepancy and bid awarded. PUBLIC CONTRACT CODE SEC. 9204 NEW PUBLIC WORKS CLAIMS PROCEDURE Observe attached details regarding Public Contract Code Section 9204. AB 626, approved by the Governor on September 29, 2016, created a new Public Contract Code Section 9204, which specifies new procedural requirements for claims submitted by a contractor on any public works project. These new requirements contain burdens for both private contractors and public entities and are specifically made applicable to charter cities. Quantities The quantities contained in the documents are approximate only and are for the sole purpose of comparing proposals. The City may, in accordance with the specifications, request additional goods or services as necessary at the City's sole discretion, as increased by the unit price noted and payment will be made for the amount of goods or services actually provided as determined by the City and accepted at the unit prices noted in the proposal. Standard terms and conditions Prior to the award of any work hereunder, City and contractor shall enter into a written contract in substantially the form attached hereto with such revisions thereto as the City may determine necessary and appropriate. PROPOSERS responding to this SOLICITATION are strongly advised to review all the terms and conditions of the contract, and shall be deemed to have accepted them. Funding Source This procurement is funded by: City of Pasadena . Vendors must submit all required document with their proposal. COST PROPOSAL: Cost Proposal Submittal Submit pricing for all items through the City’s OpenGov pricing table in accordance with Section 4. Definitions The words (A) "City", (B) "Department", (C) "Director", or (D) "Contractor", as used in this SOLICITATION, shall be understood to refer respectively to (A) the City of Pasadena, California; (B) the several departments therein; (C) the directors of the several City departments; or any of their properly authorized assistants; and ( D) the person, firm or corporation with whom the contract is made by said City or the agent or legal representative who may be appointed to represent such person, firm or corporation in the signing and performance of said contract. Addenda If any person contemplating submitting a proposal of the items or services listed herein is in doubt as to the true meaning of any part of this SOLICITATION, he/she may submit to the City representative(s) identified in the subsection named "Deadline for RFP Questions," above, a written request for an interpretation or correction thereof. Any interpretation or correction of City specifications will be made only by addendum, duly issued by the City representative(s) identified in Section 3, above. Addenda (if any) shall be made available to each Proposer. A proposer’s failure to address the requirements of any and all addenda may result in the proposal not being considered. If the City determines that a time extension is required for the proposal, the City will issue an addendum that will give the new submission date. The Proposer is responsible to register with “OpenGov” at www.cityofpasadena.net to insure they receive all SOLICITATION documents including addendums which are available as a download. The City reserves the right to change any part of these Instructions to PROPOSERS and Specifications any time prior to Deadline for Submissions. Any changes shall be in the form of addenda and will become a part of the Proposal documents and of the contract. Ordering Authority Orders for products or services under this contract require prior written authorization from the City’s designated representative, Siranoush Rousian, Senior Project Manager. RELEVANT EXPERIENCE Provide experience with governmental agencies for two projects/contracts of similar scope and size. Complete and submit the attached Relevant Experience Form with your proposal to demonstrate experience with projects/contracts of similar scope and size to that which is to be performed. Delivery Instructions Delivery and installation shall comply with Section 3.2 https://www.cityofpasadena.net/planning/scheduled-city-closure-9-80-plan/. Deliveries Must be Made to: 2575 Paloma St, Pasadena, CA 91107 WARRANTY Contractor shall provide factory warranties on all materials furnished against defects in materials and/or workmanship. The factory warranty shall become effective on the date of delivery and acceptance by the City. Should any defect in materials or workmanship appear during the warranty period, the Contractor shall repair or replace the same at no cost to the City. DEFECTIVE MATERIALS: Any materials not conforming to requirements of this Specification shall be considered defective. All such materials, whether in place or not, shall be immediately removed from the site of the work. Any defective materials installed shall be removed and replaced by the City and all costs of removal and replacement shall be deducted from any amounts due or to become due to the Contractor. No rejected materials, the defects of which have been subsequently corrected, shall be used. RECEIVING AND INSPECTION Deficient parts will be rejected and the Contractor will be required to make the necessary adjustments or replacements. It shall be the Contractor’s responsibility to pick up any rejected parts, make the necessary corrections, and re-deliver at no additional cost to the City. Equivalents to Specifications The material, equipment or service offered by the bidder will meet all requirements of this solicitation Questions requesting approval of equals must be submitted before the deadline for questions to the City contacts listed in the solicitation. Bidder must provide all information (no pricing) in order for the City to determine if the product offered is an equal to the manufacturer specified and/or meets the technical specifications. This includes details for each item to which a proposed equal will be taken, proposed make and model specifications, and any other information on the material specified herein regarding approved equals requested. Bidder must state brand name and/or manufacturer of each item proposed and include detailed specifications. All guarantees and/or warranties must also be stated. Parts and materials must be latest model or current date and meet specifications or be equal to the specifications. During the question and answer period for this solicitation ( Victory Park Community Center office furniture ; 2026-Informal-0569 ), the City reserves the right to determine whether equivalents meet the bid specifications of the City, and are equal to the manufacturer specified or the stated technical specifications. The decision of the City regarding equality shall be final. Contract Duration The Contract resulting from this proposal is scheduled to start 12/17/2026 . The Contract resulting fro Source: OpenGov https://procurement.opengov.com/portal/pasadena/projects/317347 Canonical URL: https://govcontractfinder.com/contracts/victory-park-community-center-office-furniture-opengov-530-project-317347