Wave Waterpark Restroom Remodel Project State and local opportunity evaluation City of Vista Posted: 2026-10-27T18:33:43.955Z Response deadline: 2026-11-23T16:00:00.000Z The Work generally consists of: Demolition and removal of the existing sinks, faucets, toilets, urinals, toilet partitions, countertops, and light fixtures; installation of new commercial-grade, water-conserving lavatories, toilets, urinals, and flush valves; new solid plastic or phenolic toilet partitions and urinal screens; new solid-surface or quartz countertops; new damp-rated LED lighting with occupancy controls; and surface preparation and painting of walls, ceilings, doors, and frames with a moisture-resistant coating system. The Work also includes demolition and installation of drywall, framing, and associated finishes, as well as the remodeling of the existing trellis structure and the replacement and installation of water heaters. Base Bid Items Mobilization & Demobilization (5% maximum of Total Base Bid) Demo all existing items shown on plans Plumbing Complete Construct Std. Showers Complete Construct ADA Showers Complete Install all Electrical Complete Paint & Epoxy Coatings Fixtures & Finishes (Counters, mirrors, dispensers, grab bars, seats, hand dryers, etc.) Exhaust/Venting Partitions & Misc. Curtains Trellis Structure Remodel Project Close out Alternate Bid Item Mobilization & Demobilization for Family Restrooms (5% maximum of Total Base Bid) Demo all items necessary to complete Family Restroom Construct Family Restroom Complete Project Close out for Family Restrooms Introduction Summary Background Contact Information Timeline Vendor Questionnaire Pricing Proposal Please refer to "Description of Bid Items" in the RFB document, for a detailed explanation of each line item. Document Uploads Source: OpenGov https://procurement.opengov.com/portal/cityofvista/projects/319829 Canonical URL: https://govcontractfinder.com/contracts/wave-waterpark-restroom-remodel-project-opengov-760-project-319829