Yarrington Water Treatment Plant Disinfection Modification State and local opportunity open City of Kyle IFB-2026-072 Posted: 2026-10-26T12:00:01.144Z Response deadline: 2026-12-01T21:00:00.000Z The Yarrington Water Plant Disinfection Improvements project includes the removal and replacement of chlorine gas system and all associated appurtenances as per the plans and specifications. Additionally, miscellaneous building improvements as per the bid form. Base Bid Items Mobilization - Including but not limited to all mobilization, clean up and de-mobilization onto and from the site. (This price bid for Mobilization shall not exceed 1% of the total amount bid). Payment for this item is subject to retainage as specified elsewhere in the project manual. Performance and Payment Bonds for 100 Percent (100%) of the Contract Amount. This item includes all coordination and efforts of securing all required documents. Demolition per plans and specifications Furnish and install chlorine gas system, including but not limited to gas cylinders, analyzers, ejector, dual scale, booster pump, gas mask apparatus, yard piping, equipment and all related appurtenances, per plans and specifications. Complete in place, ready for use by owner. Excavation, sawcut and restoration included in this item. Furnish and install 1" injection lines and taps, 1" sample lines and taps, recirculation pumps, yard piping, equipment and all related appurtenances per plans and specifications. Complete in place, ready for use by owner. Excavation, sawcut, and restoration included in this item. Electrical improvements per plans and specifications. Complete in place, ready for use by owner. Supplementary Items Additional Excavation and Backfill for Structures Additional Excavation and Backfill for Utilities Additional 1" PVC Chemical Injection Piping Additional 2" PVC Water Line Alternate Items (In Lieu of Items 3 to 6 in Base Bid) Miscellaneous Chemical Building Improvements including interior painting and new doors Furnish and install proposed Reinforced Fiberglass Polymer Building, to house equipment in item A-4, and all associated equipment with 5' sidewalk per plans and specifications, Complete in place, ready for use by owner. Demolition of the chlorine and analyzer rooms equipment per plans and specifications Installation of On-site Sodium Hypochlorite Generator System (OSHG) including but not limited to, water carbon filter, water softener, brine tank, sodium hypochlorite generator, oxidant tank, metering pump station, associated yard piping, and all related appurtenances, per plans and specifications. Complete in place, ready for use by owner. Furnish and install 1" injection lines and taps, 1" sample lines and taps, recirculation pumps, yard piping, equipment and all related appurtenances per plans and specifications. Complete in place, ready for use by owner. Excavation and Restoration included in this item Furnish and install 2" water supply line to Carbon Filter, yard piping, and all related appurtenances per plans and specifications. Complete in place, ready for use by owner. Excavation, sawcut and restoration included in this item Electrical improvements per plans and specifications. Complete in place, ready for use by owner INVITATION TO BID INVITATION FOR BID The Yarrington Water Plant Disinfection Improvements project includes the removal and replacement of chlorine gas system and all associated appurtenances as per the plans and specifications. Additionally, miscellaneous building improvements as per the bid form. VENDOR SUBMITTALS BID PROPOSAL VENDOR SUBMITTALS EXHIBITS AND ATTACHMENTS Source: OpenGov https://procurement.opengov.com/portal/cityofkyle/projects/319168 Canonical URL: https://govcontractfinder.com/contracts/yarrington-water-treatment-plant-disinfection-modification-opengov-3151-project-319168