Ir al contenido
← Back to search
PresolicitationArchived

AZ BL COLO 7528(1) Burro Creek Road

TRANSPORTATION, DEPARTMENT OF · 6982AF CENTRAL FEDERAL LANDS DIVISI

This notice is no longer open for responses. Find active opportunities

Detalles del Contrato

ID de Aviso
6982AF27B000002
Tipo de Oportunidad
Presolicitation
Sub-Agencia
FEDERAL HIGHWAY ADMINISTRATION
Oficina
6982AF CENTRAL FEDERAL LANDS DIVISI
Fecha de Publicación
Tuesday, September 15, 2026
Fecha Límite de Respuesta
Sep 30, 2026, 4:00 PM EDT
Código PSC
Y1LB
Reserva
Small Business Set Aside - Total
Lugar de Desempeño
Kingman, AZ, 86401, USA
Estado
Archived

Descripción

THIS IS NOT AN INVITATION FOR BID, PLAN AND SPECIFICATIONS ARE NOT AVAILABLE Small Business Set-Aside PROJECT NUMBER: AZ FLAP PIM FR510(1) PROJECT NAME: Burro Creek Road PROJECT DESCRIPTION: Burro Creek Road is located in Mohave County, 71 miles southwest of Kingman, Arizona. The project is located in rolling terrain, with elevations along this section ranging from approximately 1,885 to 2,255 feet. The project begins at the bridge over Burro Creek and ends at the cattle guard near the intersection with US Hwy 93. The project's length is approximately 1.3 miles. SCOPE OF THE WORK: The proposed of this resurfacing, restoration, and rehabilitation (3R) project is to improve access to the camping and day use areas at the Burro Creek Campground, reduce maintenance costs and erosion, improve sediment control, drainage and safety. The scope of work for this project includes the following major construction activities and items: Pavement Rehabilitation: 1.3 miles of roadway resurfacing incorporating Full Depth Reclamation (FDR) and Asphalt Concrete Pavement, along with applicable fog seals and tack coats. Drainage Improvements: Installation of cross culverts and reconstruction of an existing headwall. Additional drainage work includes ditch grading and reconditioning, berms, bank stabilization, and the addition of flared end sections and riprap aprons throughout the project. Earthwork & Stabilization: Embankment benching, slope stabilization, slope scaling, and specific bridge approach repairs at the eastern abutment to resolve undercutting concerns Safety & Traffic Control Items: Installation of new regulatory and warning signs, pavement markings and the placement of boulders to control public access at specific locations throughout the project. The project is structured with

Leer descripción completa (2,432 caracteres)

a base Schedule A encompassing the primary roadway rehabilitation, and an Option X which includes work associated with repairing bridge sedimentation, addressing undercutting at the bridge approaches, and boulder placement. PRINCIPAL WORK ITEMS: Roadway Aggregate: 1,600 TONS Ditch Reconditioning: 2,000 LNFT Full Depth Reclamation: 1.3 MILE Asphalt Concrete Pavement: 3,600 TON 18-Inch Pipe Culvert: 100 LNFT 24-Inch Pipe Culvert: 175 LNFT Boulder: 100 EACH ANTICIPATED SCHEDULE: Advertisement October 2026 Award-January - 2027 Construction January 2027 through October 2027 ESTIMATED COST RANGE: Between $2,000,000 and $5,000,000

Documents and contact

No public document links were provided with this record.

Check the official notice for attachments and access requirements ↗

Contact
Eric Grosskreuz
Email
cflcontracts@dot.gov
Loadingchange history…
Loadingrelated notices…