Ir al contenido
← Back to search
Award NoticeAwarded

Kansas City Levees UPRR Closure Structure

DEPT OF DEFENSE · W071 ENDIST KANSAS CITY

This notice records an award. Find active opportunities

Información de Adjudicación

Esta solicitud resultó en una adjudicación a por aproximadamente $18,803,862 el August 21, 2026. Contratos similares son típicamente emitidos por DEPT OF DEFENSE bajo 237990 (Other Heavy and Civil Engineering Construction).

Número de Adjudicación
W912DQ26CA044
Monto de Adjudicación
$18,803,862
Fecha de Adjudicación
August 21, 2026

Detalles del Contrato

ID de Aviso
W912DQ26RA035
Tipo de Oportunidad
Award Notice
Sub-Agencia
DEPT OF THE ARMY
Oficina
W071 ENDIST KANSAS CITY
Fecha de Publicación
Monday, August 24, 2026
Fecha Límite de Respuesta
No especificado
Código PSC
Y1LB
Reserva
Competencia Abierta Completa
Lugar de Desempeño
66105
Estado
Awarded

Descripción

The Kansas City District, United States Army Corps of Engineers (USACE), has a need for the construction of four closure structures (two stoplog and two sandbag) located on both sides of two Union Pacific Railroad (UPRR)- owned bridges crossing the Armourdale (ARM; West side of the Kansas River) and Central Industrial District (CID; East side of the Kansas River) Levee Units. The south bridge (UPRR #3) contains two sets of railroad tracks: Mainline Track No. 1 and Mainline Track No. 2. The north bridge (MOPAC) contains two sets of railroad tracks: Track No. 3 and Track No. 202. Floodwalls are to be constructed to the north and the south of the closure structures and tie into existing floodwalls on the ARM side. Closure structures on the CID side connect to earthen levees. Stoplogs and all stoplog components need to be fabricated for the project, and once construction of the stoplog closure structures is complete, a test-fit of the stoplogs across Mainline Track No. 1 and Mainline Track No. 2 is required. To facilitate construction and test-fit of the stop logs, UPRR will require the approval of construction submittals, including a phasing plan, temporary shoring plans, and obtaining temporary track outages. Construction will require flagging operations for all activities within 25 feet of the track or if equipment has the potential to foul track. Stoplog storage structures to store all stoplog components also need to be provided on each levee unit.

Documents and contact

No public document links were provided with this record.

Check the official notice for attachments and access requirements ↗

Contact
Myleesa France
Email
myleesa.s.france@usace.army.mil
Phone
8163893805
Loadingchange history…
Loadingrelated notices…