AGRICULTURE, DEPARTMENT OF
- Publicado
- 9 oct 2026
- Vence
- 26 oct 2026, 23:59 GMT-4
- Place of performance
- Silver Springs, FL
- NAICS
- 115310
- Set-aside
- Small Business Set Aside - Total
AGRICULTURE, DEPARTMENT OF · USDA-FS, CSA EAST 8
This requirement is for Mechanical Site Preparation using a double drum chopper on the Ocala National Forest. Work includes single and double chopping treatments to prepare timber harvest areas and support vegetation management objectives. Contractors must provide all equipment, labor, supervision, transportation, and materials needed to meet performance standards, including the ability to chop approximately 50 acres per day. Equipment must meet specified weight, speed, and blade requirements, and the Government may require replacement of unsatisfactory equipment. Treatment includes chopping vegetation up to 6 inches in diameter, leaving designated snags, and incorporating sloppy chop exclusion zones. Roads within treatment areas not shown on maps must also be chopped. Please review the attached Statement of Work for full specifications and requirements.
No public document links were provided with this record.
Check the official notice for attachments and access requirements ↗
AGRICULTURE, DEPARTMENT OF
AGRICULTURE, DEPARTMENT OF
AGRICULTURE, DEPARTMENT OF
AGRICULTURE, DEPARTMENT OF