Project: OR FS ERFO 2020(1)-14(1), Walla Walla South Umatilla Repairs 2020, Phase 1 and WA ERFO FS UMATL614 2020-1(1), Walla Walla North Umatilla Repairs 2020, Phase 1 This work consists of: excavation, borrow, grading, aggregate surfacing, drainage, riprap, rock embankment, stream bank stabilization, subexcavation. Project Location: 28 Miles East of Pendleton, Oregon. Project Length: 0.67 Miles Estimated Price Range: Between $5 and $10 Million Tentative Fixed Completion Date: Spring/Summer 2027 (Once solicitation is issued, see FAR Clause 52.211-10 for exact date.) See attachments for full requirements Update 12/4/2023: QA_12-04-23.pdf posted to attachments. Update 09/19/2024: 2024 Prelim letter and Project Description Posted.
TRANSPORTATION, DEPARTMENT OF is actively seeking qualified contractors for highway, street, and bridge construction with a set-aside for Small Business businesses in VANCOUVER, WA. This set-aside designation means eligible businesses face reduced competition from larger firms.
Looking for more opportunities?
Browse our full directory of government contracts