Ir al contenido
← Back to search
SolicitationActive

Belle Fountain Ditch Cleanout Phase 2

DEPT OF DEFENSE · W07V ENDIST MEMPHIS

Detalles del Contrato

ID de Aviso
W912EQ26BA002
Tipo de Oportunidad
Solicitation
Sub-Agencia
DEPT OF THE ARMY
Oficina
W07V ENDIST MEMPHIS
Fecha de Publicación
Friday, September 18, 2026
Fecha Límite de Respuesta
Oct 20, 2026, 2:30 PM EDT
Código PSC
Z1PC
Reserva
SDVOSB
Lugar de Desempeño
No especificado
Estado
Active

Descripción

Title of Work: Belle Fountain Ditch Cleanout Phase 2 Project Description: The work consists of furnishing all plant, labor, and materials for channel cleanout of Belle Fountain Ditch region including Bypass of Steele and Main Ditch according to the plans and specifications and any incidental related work. The project limits are starting at the confluence of New Franklin Ditch and Bypass of Steele, heading North through Bypass of Steele and it turns into Main Ditch, and ending at the intersection of Main Ditch and County Rd. 442 located approximately 2.5 miles south of Braggadocio, Missouri as shown on the plans. Work Location: The work shall be located at Bypass of Steele where it intersects with New Franklin ditch, then heads north through Main Ditch, and ends 100 ft before the intersection of Main Ditch and County Rd. 442, approximately as indicated. The North American Industry Classification System code is 237990 - Other Heavy and Civil Engineering Construction, with a Small Business Size Standard of $45M. This project is advertised as a Service-Disabled Veteran Owned Small Business (SDVOSB) Set-Aside using sealed bid procedures.

Documents and contact

No public document links were provided with this record.

Check the official notice for attachments and access requirements ↗

Contact
Sequoria Chatmon
Email
sequoria.l.chatmon@usace.army.mil
Phone
901-544-0973
Loadingchange history…
Loadingrelated notices…