AGRICULTURE, DEPARTMENT OF
- Publicado
- 29 oct 2026
- Vence
- 13 nov 2026, 12:00 GMT-5
- Place of performance
- Cherokee, NC
- NAICS
- 237110
- Set-aside
- Small Business Set Aside - Total
This project includes the replacement of 4” asbestos cement pipe (abandoned in place) with 4” HDPE water main and associated valves and connections to laterals. The work includes; Installation of 4450 linear feet of 4” HDPE pipeline, most of which will be shallow bury or laid on cleared ground and covered with imported fill from a government source. Cover an additional 1150 linear feet of existing pipeline with imported fill from a government source. Installation of 2 combination air-vacuum valves with utility boxes. Installing associated valves, daylight drains, and pumpout drains; and connecting to existing lateral mains and services.
Derrick A Dodson
Contacto principal
Cathleen Christensen
Contacto secundario
Texto o documentos del aviso actualizados
Ver en SAM.gov (se abre en una pestaña nueva)5 anexos · Respuestas hasta 21 nov
Ver en SAM.gov (se abre en una pestaña nueva)AGRICULTURE, DEPARTMENT OF
AGRICULTURE, DEPARTMENT OF
AGRICULTURE, DEPARTMENT OF