Ir al contenido
← Back to search
SolicitationReservado: Small businessActivo

Tunnel 9 Pitch Upgrade

Descripción

The Arnold Engineering Development Complex (AEDC) Tunnel 9, located in Silver Spring, MD, requires the comprehensive modernization of a high-performance hydraulic motion system. The scope of this Firm Fixed-Price (FFP) requirement includes the design, engineering, procurement, off-site fabrication, pre assembly, on-site demolition, installation, and commissioning of core system components. All components must comply with ASME B31.1, ASME BPVC VIII, and ISO 4406 standards. Core components include: • Primary control valve (step response time of 55 ms or less) • Main actuating cylinder (working stroke of 120.5” capable of achieving a linear speed of 13 ft/s) • Hydraulic Power Unit (HPU) • Dedicated filtration and cooling "kidney" loop.

Anexos

3 archivos

Contactos

Historial de enmiendas

1 enmienda · última 3 nov
  1. Última enmienda

    Anexos
    Antes: 2Después: 3+1
    Ver en SAM.gov (se abre en una pestaña nueva)
  2. Versión más antigua registrada

    2 anexos · Respuestas hasta 6 nov

    Ver en SAM.gov (se abre en una pestaña nueva)

Fuentes oficiales

Aviso en SAM.govsam.gov · Registro oficial del gobierno de EE. UU. (se abre en una pestaña nueva)Texto sin formato

DEPT OF DEFENSE

Publicado
5 nov 2026
Vence
16 nov 2026
NAICS
332912
Set-aside
Small Business Set Aside - Total