DEPT OF DEFENSE
- Publicado
- 5 nov 2026
- Vence
- 13 nov 2026
- NAICS
- 333618
RFP Amendment 0001 is hereby posted to update the Product Description (Attachment J-1), see attachment. This is a Combined Synopsis/Solicitation for commercial products prepared in accordance with the format in Part 12. This announcement constitutes the only solicitation. A proposal is being requested from only one source. Request for Proposal (RFP) N5523626R009 is issued as a sole source procurement. The subject solicitation is being processed in accordance with FAR Part 12. The Government intends to solicit and contract with only one source, Fairbanks Morse Defense (referred to herein a s Fairbanks Morse) for the part listed on the Product Description (Attachment J-1), under the authority of FAR 12.102 on a sole source basis. This notice of intent is not a request for competitive proposals. Determination by the Government not to compete with this proposed contract based upon responses to this notice is solely within the discretion of the Government. The applicable North American Industry Classification System (NAICS) code is 333618 Other Engine Equipment Manufacturing. This solicitation incorporates provisions and clauses by reference. The full text of FAR and DFAR references, provisions and clauses may be accessed at https://acquisition.gov. Please see the attachment, 26R0009__USS_Boxer_RFP_Syn_Sol for the full combined solicitation/synopsis notice for this requirement.
MIRA MAJE Brown
Contacto principal
Kristin Liljestrom
Contacto secundario
Este es el historial recopilado por Gov Contract Finder. Las fechas indican cuándo se registró la información o se creó una versión, no cuándo SAM.gov la cambió originalmente. Pueden faltar revisiones anteriores.
Las publicaciones se agrupan por coincidencias; las relaciones entre revisiones son inferidas.
No se ha verificado la publicación raíz original de SAM.gov.
Versión de la oportunidad
Información inicial
USS BOXER (LHD-4), ALCO Model 251C Long Lead Time Material (LLTM) Replacement
Licitación: N5523626R0009
Publicación: e28e42098d3b432287458e7ac3b57102
Publicación actual
Campos modificados: Description
Información establecida por primera vez: Description
Versión de la oportunidad
Se observó una nueva oportunidad
USS BOXER (LHD-4), ALCO Model 251C Long Lead Time Material (LLTM) Replacement
Licitación: N5523626R0009
Publicación: e28e42098d3b432287458e7ac3b57102
Publicación actual
Campos modificados: AAC Code, Active, AdditionalInfoLink, ArchiveDate, ArchiveType, AwardDate, AwardNumber, BaseType, CGAC, City, ClassificationCode, CountryCode, Department/Ind.Agency, FPDS Code, Industry, Link, NaicsCode, NoticeId, Office, OrganizationType, PopStreetAddress, PopZip, PostedDate, PrimaryContact, ResponseDeadLine, SecondaryContact, SetASide, SetASideCode, Sol#, State, Sub-Tier, Title, Type, ZipCode, descriptionUrl, fullParentPathCode, fullParentPathName, groupingConfidence, logicalOpportunityId, naicsCodes, pointOfContact, resourceLinks, samNoticeId, samRootId, solicitationNumber, source, sourceResourceCount, sourceResourceIds
Registro de la oportunidad
Información inicial
USS BOXER (LHD-4), ALCO Model 251C Long Lead Time Material (LLTM) Replacement
Licitación: N5523626R0009
Publicación: e28e42098d3b432287458e7ac3b57102
Publicación actual
DEPT OF DEFENSE
DEPT OF DEFENSE
DEPT OF DEFENSE