103 W High St and 1302 S Martin Luther King Jr - Demolition of Building on Corner Lot
Description
The objective of this Request for Quotation is for 103 W High St and 1302 S Martin Luther King Jr - Demolition of Building on Corner Lot . DEMOLITION OF COMMERCIAL BLDG AT CORNER OF 103 W HIGH ST AND 1302 S MARTIN LUTHER KING JR DR. Lump sum must include all labor, materials, equipment and any permits or fees associated with this project. Greening Costs: Dirt Greening Costs: Grade Greening Costs: Seed Greening Costs: Sidewalk Demolition Cost Asbestos Abatement Cost Special Conditions - Demolition Project Timeline Release Project Date: November 25, 2026 Response Submission Deadline: December 3, 2026, 10:00am Completion Date: February 10, 2027 Winter Work: May 20, 2027 To include: 1) Hazardous materials must be abated in accordance with MIOSHA and DEQ regulations and the attached Pre-Demolition Compliance Survey assessment. 2) Compact all clean backfill material with a hoe-pack or vibrating roller compactor. 3) Remove 1 curb cut and entry approach to NE and remove and replace 1 entry approach to NW. Reduce width to meet new 12' wide alley way to be installed. (30 lineal feet to NE and 22 lineal feet to NW) 4) Install 45 lineal feet of curb and gutter to infill NE approach and install 36 lineal ft to infill and replace NW approach to alley way. (Provide 18’ wide approach at street gutter pan and flare inwards to meet 12’ wide alley way to be installed) If road is in disrepair, Contractor will need to cut street and have forms installed to form front gutter pan and then have road repaired with hot patch asphalt upon completion of concrete work. 5) Remove and replace 160 lineal feet (full N sidewalk) of cracked, heaved and broken public sidewalks. 6) See enclosed water and sewer service records for approximate location and any special instructions for shared services. If no service card is provided it is the contractor’s responsibility to ensure that neighboring water and sewer services are operational at the conclusion of the demolition. Trees/shrubs: Remove all trees, brush overgrowth from south and trim along S chain link fence. Remove all brush/trees and overgrowth along W property line and chain link fence (all vegetation to be fully cleared along fence line. Hand tools may be required to fully remove all vegetation). Remove all branches and overgrowth from S tree line. Plant 10 each 2 ½” caliper Japanese Lilac trees evenly spaced to the West side of the property along the new alley to be installed. Trees to be set back 8’ from alley. Install 2 each 2 ½” Japanese Lilac trees to N ROW area evenly spaced between open ROW areas. Miscellaneous: Remove phone booth, abandoned light pole to S, Remove all asphalt and subbase a minimum 6” deep on entire site extending to W chain link fence, to fully clear the site (inspection required to confirm prior to final grade or topsoil), regrade all ROW areas to the N to provide positive slope from newly installed sidewalks to street curb. Clean and grade S fence line around all trees and remove any debris-brush. Saw cut along asphalt curbing to S of property adjacent to S building to allow for hard surface removals on demo site. a. Alley way- Install a new 12’ alley way to the W of the property. Alley to start 4’ from W chain link fence and extend from W High St to S property line (approx. 145’). Install 8” deep alley base using 21 AA. Grade to be set 4” below N sidewalk to allow for asphalt paving in spring of 2027 and provide temporary slope at N 4’ to meet sidewalk. (Grade inspection required to confirm grade and 8” base prep prior to installation. Survey stakes will be set to locate alley way for installation and for NW drive approach installation prior to work.) b. Note that final 16’ site/alley way asphalt removal, grading and new 21 AA installation needs to be completed in 1 business day, so as not to restrict access to properties to S, utilizing the alley. Contractor must coordinate all equipment and materials to allow for alley way removal/grade and installation. Contractor may demolish all E of this area during standard demolition but must maintain the W 16’ area for S properties and coordinate final removal and installations on the scheduled day for this area. Photo Invitation to Bid Sealed proposals for 103 W High St and 1302 S Martin Luther King Jr - Demolition of Building on Corner Lot will be received by the City of Jackson Purchasing Coordinator, Kari Kerstetter, via the City of Jackson e-Procurement Portal, https://procurement.opengov.com/portal/cityofjackson . The work includes the following partial listing of items with approximate quantities: Demolition of commercial building and parking lots located at the corner lot of 103 W. High St and 1302 S Martin Luther King Jr Dr Bidders may obtain Instructions to Bidders, Proposal Forms, Specifications and Contract Forms on the City of Jackson e-Procurement Portal, https://procurement.opengov.com/portal/cityofjackson . The City of Jackson does not discriminate on the basis of race, religion or national origin, color, age, sex, height, weight, marital status, and physical or mental handicap as to: access, availability, employment, or participation in any of its programs and activities. City of Jackson Heather Ehnis Purchasing Agent Specifications: All Quotes must be submitted via the City of Jackson e-Procurement Portal, https://procurement.opengov.com/portal/cityofjackson . Questions about this invitation to quote should be initiated in the Questions and Answers section of the project. All Contractors shall complete the Quote and Award page(s) and submit all information requested herein in order for a Quote to be responsive. Late Quotes will not be considered. ADDITIONAL INSTRUCTIONS TO CONTRACTORS: 1. EXAMINATION OF QUOTE DOCUMENT: Before submitting a Quote, Contractors shall carefully examine the specifications and shall fully inform themselves as to all existing conditions and limitations. The Contractor shall indicate in the Quote the sum to cover the cost of all items included on the Quote form. 2. C OMMUNICATIONS: All communications, any modifications, clarifications, amendments, questions, responses, or any other matters related to the Invitation for Quote (IFQ) must be made only through the Purchasing Department Contact noted on the cover of this IFQ. A violation of this provision is cause for the City to reject a Company’s Quote. No contact with other City employees is permitted and may be grounds for disqualification. 3. INVITATION FOR QUOTE MODIFICATIONS : Clarifications, modifications, or amendments may be made to the IFQ at any time prior to the Quote Deadline at the discretion of the City. It is the Contractor’s responsibility to periodically check the City’s e-Procurement website at: http://procurement.opengov.com/portal/cityofjackson until the posted Quote Deadline to obtain any issued addenda. 4. PREPARATION OF QUOTE: The Quote shall be legibly prepared. The Quote shall be legally signed, and the completed address of the Contractor given thereon. 5. QUOTE SUBMISSION: Submit offer on Pricing Table provided. Contractors are required to complete entire Invitation to Bid and include attachments. Quotes must be submitted via the City of Jackson e-Procurement Portal, https://procurement.opengov.com/portal/cityofjackson . It is the Contractor’s responsibility to ensure their Quote is received prior to the Quote Due Date and Time deadline. Submission of a Quote establishes a conclusive presumption that the Contractor is thoroughly familiar with the Invitation for Quote and that the Contractor understands and agrees to abide by each, and all of the stipulations and requirements contained therein. The opening and reading of a Quote does not constitute the City’s acceptance of the Contractor as a responsive and responsible Contractor. All costs incurred in the preparation and presentation of the Quote, as well as any resulting contract, is the Contractor’s sole responsibility; no pre-award costs will be reimbursed to any Contractor. 6. EXPLANATION TO CONTRACTORS: Any information given to a prospective Contractor concerning the IFQ will be furnished to all prospective Contractors as an amendment or addendum to the IFQ if such information would be prejudicial to uninformed Contractors. Receipt of amendments or addenda by a Contractor must be acknowledged in the Quote. Oral explanation or instructions given prior to the opening will not be binding. 7. WITHDRAWAL OF QUOTE: Quotes may be withdrawn by written notice or in person by a Contractor or their authorized representative, provided their identity is made known and a receipt is signed for the Quote, but only if the withdrawal is made prior to the Quote Due Date and Time. No Quote may be withdrawn for at least ninety (90) days after the Quote Due Date and Time. 8. ALTERNATE QUOTES: Contractors are cautioned that any alternate Quote, unless specifically requested, or any changes, insertions, or omissions to the terms and conditions, specifications, or any other requirement of this IFQ may be considered non- responsive, and at the option of the City, may result in rejection of the alternate Quote. 9. LATE QUOTES: Any Quote received for this project after the exact date and time specified for receipt, will not be considered. 10. DUPLICATE QUOTES: No more than one (1) Quote from any Contractor, including its subsidiaries, affiliated companies, and franchises will be considered by the City. In the event multiple Quotes are submitted in violation of this provision, the City will have the right to determine which Quote will be considered, or at its sole option, reject all such multiple Quotes. 11. REJECTION: The City Manager reserves the right to reject any and all Quotes and to waive minor irregularities and/or technicalities in the Quotes. A Contractor’s failure to provide any additional information requested by the City prior to a Contractor selection may result in rejection of the Quote. The City may reject any Quote from any person, firm or corporation in arrears or in default to the City on any contract, debt, or other obligation, or if the Contractor is debarred by the City from consideration for a contract award. The City reserves the right to reject all nonconforming, nonresponsive, unbalanced, or conditional Quotes. 12. UNIT PRICES: If there is a discrepancy between unit prices and their extensions, unit prices shall prevail. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum. 13. NON-DISCRIMINATION: The City of Jackson will not contract with any person or firm that discriminates against employees or applicants for employment because of any factor not related to job performance. The Contractor must comply with all federal, state, and local laws and policies that prohibit discrimination in employment contracts. The Contractor must include in its subcontracts provisions that prohibit subcontractors from discriminating in their employment practices. 14. QUOTE SIGNATURES: An authorized official must sign Quotes. Each signature represents a binding commitment upon the Contractor to provide the goods and/or services offered to the City if the Contractor is determined to be the lowest responsible Contractor. The Contractor must complete, sign, and have notarized the form regarding Authorization to Submit Quotes attached to this IFQ. 15. FOIA REQUIREMENTS: Quotes are subject to public disclosure after the deadline for submission in accordance with state law. 16. DISQUALIFICATION OF CONTRACTORS: Any one or more of the following causes may be considered for the disqualification of a Contractor as non-respons SPECIFICATIONS AND/OR SCOPE OF WORK: 1. INTRODUCTION: Through this Invitation for Quote (IFQ) the City of Jackson hereby invites businesses who meet the qualifications and specifications set forth herein to submit Quotes for asbestos abatement, demolition of residential buildings and accessory structures, and site restoration at various locations throughout the City of Jackson. 2. EXAMINATION OF CONTRACT DOCUMENTS AND SITE: It is the responsibility of each Contractor before submitting a Quote to: a. Examine the contract documents thoroughly b. Study and understand the contract documents as they relate to each site in this IFQ that may in any manner affect the cost, progress, or performance of work c. Attend the Pre-Quote meeting, if scheduled d. Visit each site in this IFQ to familiarize themselves with local conditions that may in any manner affect the cost, progress, or performance of the work e. Consider federal, state, and local laws and regulations that may affect the cost, progress, performance, or furnishing the work f. Promptly notify the City of Jackson in writing of all conflicts, errors, omissions, ambiguities, or discrepancies which the Contractor has discovered in or between the contract documents and such related documents 3. Before submitting Quotes each Contractor will, at their own expense, make such additional investigations and tests as the Contractor may deem necessary to determine their Quote for performance of the work in accordance with the time, price, and other terms and conditions of the contract documents. 4. The locations of existing utilities are taken from records believed to be reliable. The City of Jackson, or any employee of the City of Jackson, will not be responsible for any omissions or variations from the indicated location of existing utilities which may be encountered in the work. 5. The submission of a Quote will constitute an incontrovertible representation by the Contractor that they have complied with every requirement of this section, that without exception the Quote is based upon performing and furnishing the work required by the contract documents and applying the specific means, methods, techniques, sequences or procedures of construction (if any) that may be shown, indicated or required by the contract documents, that Contractor has given the City of Jackson Purchasing Agent written notice of all conflicts, errors, ambiguities and discrepancies that the Contractor has discovered in the contract documents and that the contract documents are sufficient in scope and detail to indicate and convey understanding of all terms and conditions for performing and furnishing the work, and that the time stated in the proposal is sufficient to complete the project. 6. This IFQ includes the abatement of asbestos, the demolition and removal of the residential buildings and accessory structures, and site improvements as indicated in the attachments for the properties listed below. 7. Professional inspections, surveys, and lab tests of these structures have been completed to determine the presence, types, quantities, and locations of asbestos: containing materials (ACM), mercury, and household hazardous waste. A report is included in the attachment for each property. Proper removal of any and all such materials shall be the responsibility of the successful demolition Contractor and all costs for removal shall be included in the Quote for each site. Please invite any potential subcontractors to attend the mandatory pre-Quote inspections. Area given is the total floor area as shown in the City Assessor database. 8. Contract documents require that all work on this project be completed as follows: full site demolished, trees and fencing removed with quality bladed rough grade no later than the completion date listed in the Timeline, liquidated damages of one thousand dollars ($1,000) per calendar day, thereafter. 9. The Contractor understands that no work may commence until all bonds, licenses and certificates of insurance have been provided to the City. Said documents shall be provided within ten (10) calendar days after receipt of Notice of Award. The Contractor agrees to complete all work detailed herein and to conform with the terms of this contact and all applicable laws, ordinances, rules, and regulations within the schedule outlined above. Abatement of hazardous material may not begin before a Hazardous Material Abatement permit is issued by the Department of Community Development. Demolition may not begin before a demolition permit is issued by the Department of Community Development. 10. Failure to provide all required documents within ten (10) days of receipt of Notice of Award, or failure to complete all required work within the time specified above shall constitute a breach of this contract and justify cancellation by the City. Upon cancellation of the contract, the Contractor shall be liable to the City for any increased cost caused by the Contractors’ breach. Contractors declared in breach will also be removed from the active Contractors list maintained by the City until such time as any costs have been reimbursed to the City and/or the matter is otherwise fully resolved to the satisfaction of the City. 11. Contractor shall provide all of the information as requested herein with their Quote. Failure to do so and/or failure to provide post-Quote requested information may be cause for rejecting the Quote as non-responsive. SCOPE OF SERVICES: The successful Contractor will be responsible for providing the following services for each Property included in this project: 1. Abatement of asbestos indicated in the attached Asbestos Containing Material and Hazardous Materials Inspection Report by a licensed asbestos abatement contractor in accordance with state and federal regulations prior to demolition. a. The demolition contractor is strictly prohibited from beginning demolition of the structure prior to receiving clearance to proceed from the City. The City has hired an independent contractor to conduct hazardous material clearance inspections in order to verify that all hazardous materials have been abated prior to demolition. The demolition contractor must provide an air monitoring report and notify the City when all hazardous material has been abated. There will be a $5,000.00 fine for beginning demolition of the structure prior to the hazardous material clearance inspection and authorization to proceed with the demolition from the City. The contractor will not be paid for the demolition of any structure if they begin demolition of the structure prior to the hazardous material clearance inspection and authorization to proceed with the demolition from the City. 2. Provide the requisite environmental insurance that will cover the Contractor, its subcontractors, and the City from any claim arising out of the abatement and demolition process in addition to other required insurance required in this IFQ. If the Contractor has subcontracted the work to a licensed asbestos abatement firm, the subcontractor’s insurance may meet this requirement. 3. Demolition of all structure(s) and abatement of hazardous materials shall be in accordance with the following: 4. Prior to commencing abatement provide the following: a. Submit for the City’s approval a project schedule for the abatement of hazardous materials, completion of the demolition and all special conditions, and site restorations as required by this Agreement. This schedule shall include allowances for periods of time required for the City’s review. Time limits established in the schedule approved by the City shall not be exceeded by the Contractor. b. 10-day Michigan Department of Environmental Quality (DEQ)/National Emissions Standards for Hazardous Air Pollutants (NESHAP) notice to abate. c. 10-day Michigan Department of Licensing and Regulatory Affairs (LARA) (Michigan Occupational Safety and Health Administration (MIOSHA) notice to abate. d. Provide revised notifications if applicable. e. Obtain abatement permit from the Department of Community Development. 5. Prior to commencing demolition, the Contractor shall: a. Abate
OpenGov categories
- 57847 · Hazardous Materials (Hazmat, Green Material, etc.), (Not Otherwise Classified)
- 91219 · Clearing and Grubbing Services
- 91223 · Construction, General (Backfill Services, Digging, Ditching, Road Grading, Rock Stabilization, etc.)
- 91240 · Demolition Services
- 91319 · Construction, Curb and Gutter (Includes Maintenance, Repair, and Removal)
- 91382 · Maintenance and Repair, Sidewalk and Driveway (Including Removal)
- 96888 · Tree and Shrub Removal Services
- 96897 · Wrecking and Removal Services
- 98852 · Landscaping (Including Design, Fertilizing, Planting, etc., But Not Grounds Maintenance or Tree Trimming Services)